Piping Line List 21C008-KA-00-P-LA-0002 - 05 - IFC - 2022-07-01 - 02
Piping Line List 21C008-KA-00-P-LA-0002 - 05 - IFC - 2022-07-01 - 02
Module M10 EPC
Line List ‐ M10
Originator/Contractor: Client/Owner:
Sub‐Supplier: Main Tag/Equipment:
Code 2 7/6/2022
Doc. Title: Line List ‐ M10
Client Doc.no.: 21C008‐KA‐00‐P‐LA‐0002 Client Rev.no.: 05
Project: Module M10 EPC Date: 30/06/2022
Summary of Changes
Rev: Description:
01 First issue
02 Changes in red.
03 Changes in red. Updated according to CSI‐KAN‐001. Chemical cleaning removed, NDT class removed
04 Changes in red. Chemical cleaning included. Paint system updated for lines with personnel protection
05 Changes in red.
Holds
No.: Page: Description:
1 4 Deleted
2 4 For fire water lines
Copyright KANFA Group 2021 Page 2 of 6
Code 2 7/6/2022
Doc. Title: Line List ‐ M10
Doc. no: 21C008‐KA‐00‐P‐LA‐0002 Rev: 05
Project: Module M10 EPC Date: 30/06/2022
Introduction
This document summarize all the lines for the new module M10.
This line list is based on a copy paste of M02 and M11 modules.
The original tag is kept however the first suffix in the sequence number is replaced with "8" to indicate this is for the new module M10 or
related to the installation of this module.
For the tags originally within the Flash Gas Compressor package the sequence number is changed from "3000" to "8500".
References
1.
Page 3 of 6
Code 2 7/6/2022
Doc. Title: Line List ‐ M10
Doc. no: 21C008‐KA‐00‐P‐LA‐0002 Rev: 05
Project: Module M10 EPC Date: 30/06/2022
Page 4 of 6
Code 2 7/6/2022
Doc. Title: Line List ‐ M10
Doc. no: 21C008‐KA‐00‐P‐LA‐0002 Rev: 05
Project: Module M10 EPC Date: 30/06/2022
Page 5 of 6
Code 2 7/6/2022
Doc. Title: Line List ‐ M10
Doc. no: 21C008‐KA‐00‐P‐LA‐0002 Rev: 05
Project: Module M10 EPC Date: 30/06/2022
Page 6 of 6
Code 2 7/6/2022
Wednesday, July 06, 2022 07:38:31
20220706073830_fd020073-006d-442a-af6b-38520015356211b0b285-f67e-4f26-9697-3865648455666d7f7a1c-13e4-4f27-b
Page: 1
Created by :Fabrizio Amoroso
On :Wednesday, July 06, 2022 07:35:45
Type :Action
State :For Discussion
Stress criticality shall be revised and made consistent with stress critical line list
Page: 1
Created by :Fabrizio Amoroso
On :Wednesday, July 06, 2022 07:37:13
Type :Action
State :For Discussion
Document not reviewed in detail; assumed list is complete and consistent with piping class and
process documentation - INFO