In order to display time unit data accurately, you should set the Hours
per Time Period values according to the activity calendar used by your
role in the organization. For example, if you are an engineer and
engineers use an 8-hour activity calendar, enter 8 as the Hours/Day
value. If you do not enter a value that corresponds to your role's activity
calendar, activity durations may be displayed incorrectly when you view
your activities in spreadsheets, reports, etc.
Formatting Dates
Choose Edit, User Preferences, then click the Dates tab to specify how
to display dates.
Displays an example of
your format preferences
Specify date format Choose the date format you want to use, then
choose how to display time values in date fields. Mark the applicable
checkboxes in the Options area to indicate how the selected date format
should appear. In the Separator field, select the character you want to
use to separate days, months, and years.
You must enter all cost data in the view currency selected in
User Preferences.
In the Outgoing Mail Server (SMTP) field, type either the fully qualified
domain name of the Internet mail server or its IP address. In the User E-
Mail Address field, type the Internet mail address for the user from
whom the mail will be sent. If you have a MAPI configuration, clear the
Outgoing Mail Server (SMTP) field, and type the Microsoft Exchange
e-mail address of the person sending the e-mail notification in the User
E-Mail Address field.
Implementing Wizards
Choose Edit, User Preferences, then click the Assistance tab to enable
the use of wizards when adding resources and activities.
To discontinue a wizard’s
use, you can either clear
the checkbox in this
dialog box or mark the Do
Not Show This Wizard
Again checkbox in the If you clear one or both
checkboxes and add a
wizard dialog box. To
new resource or activity,
enable a wizard for future
you will need to use the
sessions, mark the current layout to add the
applicable checkbox information.
again in the Assistance
tab of the User
Preferences dialog box.
Set startup and log file options Select the window to display each
time you start the module. Select Home if your work varies each day;
the Home workspace enables you to select the applicable window or
layout for each session.
You can also indicate whether to display the Issue Navigator dialog box,
which contains outstanding issues that are generated based on your
preset thresholds, and the Welcome dialog box, which enables you to
choose to create a new project, open an existing project, open the last
project opened in your previous session, or display global/enterprise
data only.
Primavera recommends that you use the log file only with the
assistance of Primavera Customer Support staff.
Set grouping and sorting options You can show or hide the ID/
Code or Name/Description fields as labels in the group-by bands when
grouping by hierarchies that include both an ID/code and a name
description. This user preference setting affects windows/dialog boxes
where you cannot access a Group and Sort dialog box.
Set column options for financial periods You can make a range
of financial periods available as columns in the Activities and Resource
Assignments windows, as well as the Resources tab of Activity Details.
You must enter a range to make financial period columns available for
selection in the Columns dialog box. For example, if each financial
period in the Financial Period dictionary has a duration of one month,
you may only want to view the previous six financial periods (six
months). You can change the range of financial periods you want to
display at any time.
Additional Considerations:
If you do not choose Show Choose the project data to display If you choose Show All
All Projects, the module Projects from the Display Options bar in a Resource Usage Profile or
displays profile/ Resource Usage Spreadsheet, you can specify whether to include data
spreadsheet and tracking from open and closed projects, or only the projects currently open when
data from open projects calculating remaining units and costs. (Closed projects are any projects
only, and the data are live
in the enterprise project structure (EPS) that are not currently open.)
rather than summarized.
■ To include live data from all open projects and stored summary data
from all closed projects (excluding those with a What-If status),
choose All Closed Projects (Except What-If Projects).
■ To include live data from all open projects and stored summary data
from all closed projects with a specific leveling priority, choose All
Closed Projects with Leveling Priority Equal/Higher Than, and
enter the leveling priority you want to use. (Specify the leveling
priority per project in the General tab of the Projects window.) The
module uses this value to consider applicable external projects
(those not included in the current layout) when deducting from
resource availability immediately during leveling.
■ To not include resource data from external (closed) projects in the
remaining units and cost values for Resource Usage Profiles,
Resource Usage Spreadsheets, and tracking layouts, choose Open
Projects Only.
Next, select the interval at which live resource and cost calculations are
performed for Resource Usage Profiles and Resource Usage
Spreadsheet displays and in tracking layouts. Profiles, spreadsheets, and
layouts are only affected if their timescale interval is set lower than the
interval set in the Interval for Time-Distributed Resource Calculations
field.
For P6 Web Access users, Finally, choose to display role limits based on custom role limits defined
you can choose how you in the Roles dictionary or on the calculated limit of each role’s primary
want to display role limits in resource. The Resource Usage Spreadsheet, Resource Usage Profile,
the Resource Staffing tracking layouts, and P6 Web Access charts display the role limit
section of Global according to the option you select.
Preferences.
Structuring Projects
In this part: Setting Up the Enterprise Project
Structure
Setting Up the Organizational
Breakdown Structure
Defining Resources and Roles
Reviewing Work Breakdown Structures
Defining Budgets
Establishing Project Codes
Working with User-Defined Fields
Creating Calendars
T his part describes how to start planning and creating projects.
The first four chapters explain how to structure and add projects
to the hierarchy; establish the managers directly responsible for
projects and the users associated with them throughout the
enterprise; set up project resources and roles; and use the work
breakdown structure (WBS) to plan and manage project
information.
Use the Admin The number of EPS levels and their structure depend on the scope of
Preferences, Data Limits your projects and how you want to summarize data. For example, you
tab to specify the may want to define increasingly lower levels of EPS nodes, similar to an
maximum number of EPS outline, to represent broad areas of work that expand into more detailed
levels you can define. projects. In the following example, the Caprini Corporation EPS node
Specify up to 50 combined
includes a lower-level node called Apex Project. The Apex Project node
EPS/WBS levels.
is further divided into the Apex Construction node. This node contains
the projects that constitute their part of the Apex Project. For example,
the Apex Construction node contains the Automated System, Office
Building Addition, and Conveyor System projects. You can specify as
many projects as necessary to complete the required work and fulfill the
scope set forth by operations executives and program managers in your
organization.
Ideally, one person or group controls the EPS across the enterprise. The
project controls coordinator creates the hierarchical structure that
identifies the company-wide projects. The coordinator works with the
project manager in each area of the enterprise to define basic project
information for each group and to develop standards before any projects
are added. The following diagram is a simplified representation of
responsibilities and projects within a hierarchy.
Review portfolio
performance in P6
Operations Executive
Web Access
and Program Manager
Lower-level
Project Manager and
EPS node
Resource/Cost Manager
Move around in the EPS When you first start the module, click
Open Existing on the Welcome dialog box, or choose File, Open, from
within the module. EPS nodes that contain other nodes and projects are
identified by a pyramid symbol. A + symbol indicates that more nodes
or projects are rolled up beneath the selected node. Click + or double-
click the node to display additional levels in the hierarchy.
Select the EPS node or project you want to open, then click Open. To
view the EPS structure, click Projects from the Home workspace.
Click Projects to
display the
enterprise project
structure.
Work breakdown structure Each project has its own WBS, which
shows the hierarchy of products and services produced during and by a
project. The summary rollup of the highest WBS level is equal to that of
the project level in the EPS. This effectively extends the EPS hierarchy
down to the activity level in the EPS, as shown in the following
example.
For more information Organizational breakdown structure User access and privileges
about the OBS hierarchy,
see “Setting Up the
to nodes within the EPS hierarchy are implemented through a global
Organizational Breakdown OBS that represents the management responsible for the projects in the
Structure” on page 103. EPS. Each manager in the OBS is associated with his or her area of the
EPS, either by node or by project, and the WBS of the particular level of
the hierarchy.
Project codes Project codes are another way to group and sort
projects in the enterprise. When you have many projects in the
hierarchy, codes enable consolidation and/or filtering of potentially vast
amounts of information located in different areas of the enterprise.
Add a node to the EPS Select the node under which you want to
add a node. The new node will be placed below the selected node in the
hierarchy. Click Add in the Enterprise Project Structure (EPS) dialog
box. Type a unique ID and name for the node directly in the column
cells, or in the EPS ID and EPS Name fields. Accept the responsible
manager shown, or click the Browse button in the field to select a
different OBS element for the node. Use the arrow keys to indent/
outdent a node to denote its placement in the EPS, and to move a node
up/down in the hierarchy.
Click Close.