OFFICIAL COPY - GT3900 - PEPRSTPM999004P1 - - - PDF Generated on 11-Jun-2015 8:41AM

/3/22%424%526%7$

Project number: SO17073 Orginator: HARIKRISHNA KOMMI


Document number : PEDWSTTS004220 Document revision: V1
Checked by Designer: UDAYA KUMAR, ELLA Date : 09/08/2022
Checked by Engineer: YOGESH YADAV Date : 29/08/2022

2
1 Any "NO" requires action (e.g. comment to originator or management team);

 '
 '( '(
          
Do you feel  
  with the drawing? Are you able to defend and clarify all points of this
1
drawing to others?
 

 '
 '( '(
          
1 Are the ! 

 "  and "  " correct?
2 Are the #" 
#
correct?
3 Are the $

)
!*
4 Are applicable  complete and correct?
5 Are the % "  +!
!

) ,
!!*
6 Is the 
&'
correctly applied and indicated (overall and per section/detail)?
7 Do originator, engineering checker and approvers '
correspond with EDMS workflow?
8 Is the ()
 included and correct?
9 MTO from Outfitting is simular to the MTO from Outfitting Draft

&'
*'
+ '
 '( '(
          
1 Has the correct projection method been used ( 
)?
2 Are all the &, 
 
  
correct?
3 Have all  been correcty indicated with letters?
4 Have all 
  been correcty indicated with numbers?
5 Have all  #
 been correcty indicated with text?
6 Is the cross check with the " made and found correct?

&'
*& + '
 '( '(
          
1 Have all& been defined and properly been indicated, with the correct notation?

2 Have all f & which deviate from the welding sticker been defined in the drawing?

3 Has the &  


 -been correctly defined?
4 Are the welds
  for welding and NDT inspection?

&'
*  + '
 '( '(
          
1 Are all  indicated in accordance with level of delivery detail ?
2 Are  "   indicated?

3 -"! 
.!"!)!)!/
! !"+!!!
!."!)!)"*

.
&'
*"+ '
 '( '(
          
1 Is the construction in accordance with' '
 
"
 ?
2 Is design "
  (incl. painting and inspection)?
3 Are all 

  checked and found correct ?
01)
2)+!
) ,",
!+!!3
""+.
++
+
4
!*
$
  '
 '( '(
          
1 Are posnumbers in accordance with parts list numbers?
2 Are all items indicated correctly in the parts list?
Is the material indication in acc. with material spec. and has Z-material been indicated if and
3
where required ?
4 Has indication of bolts, nuts, washers, etc. been done correctly and consistently ?
5 Are all quantities correct ?
6 Are unitary weights correct?
7 -"4%  !&""
!!!.,!*
/%#)
  '
 '( '(
          
1 Is the#) table complete and updated?
2 Is  of revision correct and consistent? (incl. ABS approval letter number)
3 Are all the 
' clearly
( with a revision cloud and triangle?
4 Are #"# clouds and triangles removed?
Were all   to previous revisions of the document properly incorporated in the drawing
5
and/or satisfactorily responded to? (marked-up master copies)
'
' '
 '( '(
          
1 Has correct DCF number been indicated on drawing and in revision history table?
01 '
 '( '(
          
1 /
 # this check sheet after completion to LE.
2 Are all items of this check sheet  #
?
3 Has the owner of this check sheet been informed to 
&
'?

Additional comments:

Yogesh Yadav
Signatures udaya kumar.E
29/08/22 29/08/22