Professional Documents
Culture Documents
Untitled 3
Untitled 3
039 W/(mK)
Method of expansion tubes, quotes, and different layers for pipe support and coverage are
given in the technical details of the project.
All works associated with the installation and placement of water pipes in the building should be
made and according to the technical requirements of the supervisor and the project. A catalogue with
technical data, quality certificates, the origin of the material, the minimum guarantee of 3 years and
certificate of testing done by the manufacturer, shall be provided for review supervisor for an approval
before they can be placed on the object.
2.9 Valves
The valves are special tools that shall be used regarding the flowing control in the water pipelines. With
the help of the valves it can be changed the flowing quantity, or the flowing can be completely interrupted.
25