Professional Documents
Culture Documents
Old Charlotte Doran Traffic Study
Old Charlotte Doran Traffic Study
For
Old Charlotte Highway Development
Buncombe County, North Carolina
Prepared For:
Doran Companies
7803 Glenroy Road, Suite 200
Bloomington, MN 55439
Prepared By:
28 Schenck Parkway
Suite 200
Asheville, NC 28803
NC Licensure No. F-0270
DRAFT
31 August 2022
(Gannett Fleming Project No. 072380)
NOTE: This Document has not been subjected to Gannett Fleming’s Quality Assurance/Quality
Control process. It should not be considered as the final Document and is for planning
purposes only. This document may contain minor typographic and graphical errors that do
not affect the recommendations or overall quality of analyses.
TABLE OF CONTENTS
I. EXECUTIVE SUMMARY ............................................................................................................... 1
II. INTRODUCTION .......................................................................................................................... 3
III. INVENTORY OF TRAFFIC CONDITIONS ............................................................................. 6
LIST OF TABLES
Table 1 – ITE Trip Generation Summary ............................................................................................................... 8
Table 2 – Project Traffic Distribution ...................................................................................................................... 8
Table 3 – Intersection Level of Service Criteria ................................................................................................ 16
Table 4 – US 74A / Rocket Drive Level of Service ............................................................................................ 18
Table 5 – US 74A / Rocket Drive / Summit Avenue Queues ........................................................................ 19
Table 6 – US 74A / Old Charlotte Highway Level of Service ........................................................................ 21
Table 7 – US 74A / Old Charlotte Highway Queues- ...................................................................................... 22
Table 8 – US 74A / June Sayles Road) Level of Service .................................................................................. 24
Table 9 – US 74A / June Sayles Road) Queues ................................................................................................... 25
Table 10 – Old Charlotte Highway / Olde Eastwood Village BLVD Level of Service ......................... 27
Table 11 – Old Charlotte Highway / Olde Eastwood Village BLVD Queues .......................................... 28
Table 12 – Old Charlotte Highway / June Sayles Road Level of Service ................................................ 30
Table 13 – Old Charlotte Highway / June Sayles Road Queues ................................................................. 31
Table 14 – Old Charlotte Highway / Site Access #1 Level of Service ...................................................... 33
Table 15 – Old Charlotte Highway / Site Access #1 Queues ....................................................................... 34
Table 16 – June Sayles Road / Site Access #2 Level of Service ................................................................... 36
Table 17 – June Sayles Road / Site Access #2 Queues ................................................................................... 37
LIST OF FIGURES
Figure 1 – Project and Count Locations.................................................................................................................. 4
Figure 2 – Site Plan.......................................................................................................................................................... 5
Figure 3 – Existing Lane Configuration and Traffic Control .......................................................................... 7
Figure 4 – 2022 Traffic Count Volumes ................................................................................................................ 10
Figure 5 – 2026 Background Volumes .................................................................................................................. 10
Figure 6 – Land Use Traffic Distribution .............................................................................................................. 12
Figure 7 – Land Use Traffic Volumes ..................................................................................................................... 13
Figure 8 – 2026 Future Buildout Volumes .......................................................................................................... 14
Figure 9 – Proposed Lane Configuration and Traffic Control ..................................................................... 39
APPENDICES
Appendix A – Traffic Count Data
Appendix B – Capacity Analysis Reports
Appendix C – Site Plan
Appendix D – NCDOT Checklist and MOA
Appendix E – NCDOT Traffic Signal Plans
Old Charlotte Highway
Traffic Impact Analysis
I. Executive Summary
INTRODUCTION
A residential development known as the Old Charlotte Highway is proposed on SR 2771 (Old
Charlotte Highway) in Buncombe County, NC. The total project will consist of 176 single family
attached residential units (duplexes), 130 multifamily low-rise residential units (Townhouses),
and 210 multifamily mid-rise residential units (Apartments).
According to the site plan developed by Civil Design Concepts., dated August 19, 2022, proposed
direct access to the development is planned on SR 2771 (Old Charlotte Highway) and SR 2772
(June Sayles Road).
TRIP GENERATION
The amount of traffic generated by a new development is a function of the size and type of
development. Trip generation data for this report was conducted in accordance with the
procedures outlined in the Institute of Transportation Engineers (ITE) report entitled Trip
Generation 11th Edition3. Table 1 illustrates the total number of daily, AM peak hour, and PM
peak hour trips expected to be generated by the proposed development. Table 1 indicates the
proposed development phase will generate approximately 3,155 total trips per day, 230
trips in the AM Peak Hour, and 260 trips in the PM Peak Hour when it is fully built out.
CAPACITY ANALYSIS
Capacity analyses were performed for 2022 Existing conditions, 2026 Background, 2026 Future
Buildout, and 2027 Future Buildout +1 conditions for the following intersections:
RECOMMENDED IMPROVEMENTS
To mitigate the traffic-related impacts caused by the Old Charlotte Highway residential
development and to provide for safe, efficient, and reliable traffic flow, Gannett Fleming
recommends the following:
1
Old Charlotte Highway
Traffic Impact Analysis
CONCLUSIONS
This Traffic Impact Analysis shows that the proposed Old Charlotte Highway development
impacts on the traffic operations at the study area intersections will be mitigated by the
recommended improvements. It is the opinion of Gannett Fleming that with the recommended
improvements in place, the proposed development will not negatively impact the health, safety,
and welfare of the traveling public.
2
Old Charlotte Highway
Traffic Impact Analysis
II. INTRODUCTION
A residential development known as the Old Charlotte Highway is proposed on SR 2771 (Old
Charlotte Highway) in Buncombe County, NC. The total project will consist of 176 single family
attached residential units (duplexes), 130 multifamily low-rise residential units (Townhouses),
and 210 multifamily mid-rise residential units (Apartments).
According to the site plan developed by Civil Design Concepts., dated August 19, 2022, proposed
direct access to the development is planned on SR 2771 (Old Charlotte Highway) and SR 2772
(June Sayles Road).
The purpose of this report is to evaluate the traffic impacts from the proposed Old Charlotte
Highway residential developments and to recommend transportation improvements needed to
mitigate congestion that may result from the additional site traffic. This report presents trip
generation, trip distribution, traffic analyses, and recommendations for transportation
improvements needed to meet anticipated traffic demands. This report examines existing 2022
existing conditions, 2026 Background conditions, and 2026 Future Buildout conditions.
3
Old Charlotte Highway
Traffic Impact Analysis
4
Old Charlotte Highway
Traffic Impact Analysis
5
Old Charlotte Highway
Traffic Impact Analysis
B. Existing Conditions
A description of facilities in the general vicinity of this proposed development is as follows:
US 74A is maintained by NCDOT as part of the US Highway System. US 74A is a major east/west
corridor through the State of North Carolina. The 2018 AADT was measured at 21,000 vehicles
per day in the vicinity of the project. US 74A is classified as an “Other Principal Arterial” by
NCDOT’s Functional Classification Map.
SR 3279 (Rocket Drive) is maintained by NCDOT as a secondary road and has a cross section of
two lanes in the subject area. It serves Reynolds High School as its primary access. SR 3279
(Rocket Drive) is classified as a “Local Road” by NCDOT’s Functional Classification Map.
SR 2771 (Old Charlotte Highway) is maintained by NCDOT as a secondary road with a two-lane
cross section. It has some commercial and residential uses along its length. SR 2771 (Old
Charlotte Highway) is classified as a “Local Road” by NCDOT’s Functional Classification Map.
SR 2772 (June Sayles Road) is maintained by NCDOT as a secondary road with a cross section of
two lanes in the study area. SR 2772 (June Sayles Road) is classified as a “Local Road” by NCDOT’s
Functional Classification Map.
The existing lane configurations and traffic control for the study area intersections are shown in
Figure 3.
6
Old Charlotte Highway
Traffic Impact Analysis
7
Old Charlotte Highway
Traffic Impact Analysis
Traffic impact is determined by estimating the total number of daily vehicle trips, as well as the
number of peak hour vehicle trips. Table 1 indicates the proposed development phase will
generate approximately 3,155 total trips per day, 230 trips in the AM Peak Hour, and 260 trips in
the PM Peak Hour when it is fully built out.
Pass-by and internal capture trip reductions are not applicable for residential developments.
Gannett Fleming did not apply these trip reductions.
V. Traffic Distribution
To properly determine the impact of the traffic generated by the proposed development, it is
necessary to determine the distribution of traffic to and from the development (See Table 2).
These percentages are based on the projected traffic patterns and population / employment
centers in the area. They are also based on existing ADTs and data obtained from traffic counts.
The project traffic distribution is shown in Figure 7.
8
Old Charlotte Highway
Traffic Impact Analysis
In accordance with NCDOT Congestion Management Guidelines, Gannett Fleming “balanced” the
factored traffic volumes. This balancing reconciles volumes for adjacent intersections on shared
routes. Because the volumes observed at the study intersections were not within the range that
would be acceptable when considering business uses and driveways between them, it is Gannett
Fleming’s opinion that balancing the volumes was necessary.
9
Old Charlotte Highway
Traffic Impact Analysis
10
Old Charlotte Highway
Traffic Impact Analysis
11
Old Charlotte Highway
Traffic Impact Analysis
12
Old Charlotte Highway
Traffic Impact Analysis
13
Old Charlotte Highway
Traffic Impact Analysis
14
Old Charlotte Highway
Traffic Impact Analysis
Level of service (LOS) is a term used to represent different traffic conditions and is defined as a
“qualitative measure describing operational conditions within a traffic stream, and their
perception by motorist/or passengers”. Level of Service varies from Level A, representing free
flow, to Level F where traffic breakdown conditions are evident. Level B represents good
progression with minimal congestion. At Level C, the number of vehicles stopping is significant,
although many still pass through the intersection without stopping. Level D represents more
congestion, but the overall operations are acceptable. At Level E, freedom to maneuver within
the traffic stream is extremely difficult with driver frustration being generally high.
For signalized intersections, service levels pertain to each approach as well as an overall value.
The unsignalized intersection analysis method in the Highway Capacity Manual1 assigns LOS
values for each movement that yields the right-of-way, but not to the overall intersection. This
movement is generally a secondary movement from a minor street. At an unsignalized
intersection, the primary traffic on the main roadway is virtually uninterrupted. Therefore, the
overall level of service is usually much greater than what is represented by the results of the
minor street movements. Synchro Version 11 will calculate an amount of delay for the overall
intersection but will not assign LOS value. Therefore, the overall intersection delay is not
reported in the summary tables of this report. Generally, Level of Service D is acceptable for
signalized intersections in suburban areas during peak periods. With the current method of
reporting levels of service for unsignalized intersections, it is not uncommon for some of the
minor street movements to be operating at LOS F during the peak hours.
Note: In accordance with NCDOT Guidelines, right turn on red movements were prohibited for each
scenario. Additionally, all left turns from exclusive left turn lanes were modeled as “protected only”.
The minimum cycle length for a traffic signal was set as 90 seconds for a three-phase and 120
seconds for a four-phase signal. All signals in this analysis were modeled as actuated/coordinated.
Synchro modeling software may predict that cycle lengths greater than 180 seconds may be most
efficient for coordinated signal systems.
Table 3 present criteria of each level of service as indicated in the Highway Capacity Manual1.
15
Old Charlotte Highway
Traffic Impact Analysis
Capacity analyses were performed for 2022 existing conditions, 2026 Background, and 2026
Future Buildout conditions for the following intersection:
Synchro 11 calculated the AM and PM peak hour level of service and delay for the study area
intersections using methods outlined in the Highway Capacity Manual1. All capacity analyses
are included in Appendix B and are briefly summarized in the following sub-sections. It should
be noted that under coordinated traffic signal operations, levels of service and delays may change
with counterintuitive results. Individual approaches or intersections may experience less delay even
with increased volumes due to the “system” approach taken by Synchro, where an individual
intersection or approach may benefit from an increase or decrease in coordinated cycle lengths that
may approach the optimum cycle length for that individual intersection.
16
Old Charlotte Highway
Traffic Impact Analysis
For the 2026 Background traffic conditions, the intersection is predicted to operate at LOS F
during the AM Peak Hour and B during the PM Peak Hour with delays of 86.2 and 19.5 seconds
respectively. The north and southbound approaches are expected to continue to operate at LOS
F and E for the AM and PM Peak Hours respectively.
Under 2026 Future Buildout conditions, the intersection is predicted to continue to operate at
LOS F during the AM Peak Hour and B in the PM Peak Hour. with all approaches maintain LOS C
or better. The north and southbound approaches are expected to continue to operate at LOS F
for the AM Peak Hour. The PM Peak Hour LOS for the northbound Rocket Drive approach is
expected to improve to D with 60.5 seconds of delay, while the southbound Cedar Ridge Drive
approach is expected to deteriorate to F with 88.0 seconds of delay.
The 2026 Future Buildout Queues are expected to lessen for the most part from those predicted
for the 2026 Background conditions. This is likely due to the addition and coordination of a
recommended traffic signal at US 74A and SR 2772 (June Sayles Road).
Because this intersection is constrained by the proximity of Charles Lytle Road to the west, and
other physical limitations, Gannett Fleming does not recommend any improvements to this
intersection as a result of the Old Charlotte Highway Development.
Table 4 displays the Level of Service and Delay for the subject intersection for the 2022 Existing
conditions, 2026 Background conditions, and 2026 Future Buildout conditions. Table 5 displays
projected queueing for the aforementioned conditions.
17
Old Charlotte Highway
Traffic Impact Analysis
18
Old Charlotte Highway
Traffic Impact Analysis
19
Old Charlotte Highway
Traffic Impact Analysis
The US 74A / SR 2771 (Old Charlotte Highway) / Ingle’s intersection is currently a signalized
three-legged intersection. The intersection as a whole currently operates at Level of Service
(LOS) of B for both the AM and PM Peak Hours and is predicted to maintain that LOS during 2026
Background conditions and 2026 Future Buildout conditions. The Old Charlotte Road
southbound approach LOS is expected to improve in the AM Peak Hour 2026 Future Buildout
conditions likely due to the coordination of the intersection allowing it to operate closer to the
natural cycle length.
The queues predicted by Sim Traffic at this intersection show some change as a result of the
addition of Old Charlotte Highway development traffic. In fact, they are expected to decrease
some during the AM Peak Hour. During the PM Peak Hour they are expected to increase, but
remain in the same general magnitude.
Gannett Fleming recommends no changes to this intersection as a result of the Old Charlotte
Highway development.
Table 6 displays the Level of Service and Delay for the subject intersection for the 2022 Existing
conditions, 2026 Background conditions, and 2026 Future Buildout conditions. Table 7 displays
projected queueing for the intersection.
20
Old Charlotte Highway
Traffic Impact Analysis
21
Old Charlotte Highway
Traffic Impact Analysis
22
Old Charlotte Highway
Traffic Impact Analysis
The US 74A / June Sayles Road intersection is currently an unsignalized four-legged intersection.
The north and southbound approaches to the intersection operate at LOS F for the AM and PM
Peak Hours during 2022 Existing conditions. These approaches are predicted to continue to
operate at LOS F for the 2026 Background conditions.
For the 2026 Future Buildout conditions, with the recommended traffic signal in place and
operating, the north and southbound approach LOS are expected to improve to E with drastic
reductions in delay, while the US 74A approaches are predicted to remain LOS A.
The queues predicted by Sim Traffic at this intersection show change as a result of the addition
of Old Charlotte Highway traffic. They remain in the same overall magnitude.
Gannett Fleming recommends the installation of a fully actuated, coordinated traffic signal in this
intersection.
Table 8 displays the Level of Service and Delay for the subject intersection for the 2022 Existing
conditions, 2026 Background conditions, and 2026 Future Buildout conditions. Table 9 displays
projected queueing for the intersection.
23
Old Charlotte Highway
Traffic Impact Analysis
24
Old Charlotte Highway
Traffic Impact Analysis
25
Old Charlotte Highway
Traffic Impact Analysis
The Old Charlotte Highway / Olde Eastwood Village BLVD intersection is currently an
unsignalized four-legged intersection. A review of the capacity analyses revealed that the Olde
Eastwood Village BLVD northbound approach is currently operating at Level of Service (LOS) B
in both the AM and PM Peak Hour conditions with delays of 12.4 and 12.9 seconds respectively.
The capacity analyses for the 2026 Background traffic conditions revealed that the Olde
Eastwood Village BLVD northbound approach is expected to operate at LOS B in both the AM and
LOS C in the PM Peak Hour conditions with delays of 13.8 and 18.6 seconds respectively. The
added southbound approach is expected to operate at an LOS C with 18.8 seconds of delay in the
AM Peak Hour and 24.6 seconds during the PM Peak Hour.
The capacity analyses for the 2026 Future Buildout traffic conditions revealed that the Olde
Eastwood Village BLVD northbound approach is expected to operate at LOS B in both the AM and
C in the PM Peak Hour conditions with delays of 14.5 and 21.5 seconds respectively.
The queues for this intersection show change, with the Old Charlotte Highway westbound
approach expected to increase somewhat during the AM Peak 2026 Future Buildout conditions.
The rest of the queues are not expected to increase in an appreciable fashion.
Gannett Fleming recommends no changes to this intersection as a result of the Old Charlotte
Highway development.
Table 10 displays the Level of Service and Delay for the subject intersection for the 2022 Existing
conditions, 2026 Background conditions, and 2026 Future Buildout conditions. Table 11 displays
projected queueing for the intersection.
26
Old Charlotte Highway
Traffic Impact Analysis
10Table 10 – Old Charlotte Highway / Olde Eastwood Village BLVD Level of Service
27
Old Charlotte Highway
Traffic Impact Analysis
28
Old Charlotte Highway
Traffic Impact Analysis
The Old Charlotte Highway / June Sayles Road intersection is an unsignalized four-legged
intersection. The capacity analysis for the 2022 Existing, 2026 Background, and 2026 Future
Buildout traffic condition revealed all approaches are operating at LOS A with delays less than 10
seconds.
Queue lengths are not expected to increase more than 2-3 car lengths during the 2026 Future
Buildout conditions.
Gannett Fleming recommends no changes to this intersection as a result of the Old Charlotte
Highway development.
Table 12 displays the Level of Service and Delay for the subject intersection for the 2022 Existing
conditions, 2026 Background conditions, and 2026 Future Buildout conditions. Table 13 displays
projected queueing for the intersection.
29
Old Charlotte Highway
Traffic Impact Analysis
30
Old Charlotte Highway
Traffic Impact Analysis
31
Old Charlotte Highway
Traffic Impact Analysis
Queue lengths are expected to less than three car lengths for all approaches.
Gannett Fleming recommends that this intersection be constructed as shown on the plans with
at least 100 feet of stem length as per NCDOT Guidelines.
Table 14 displays the Level of Service and Delay for the subject intersection for the 2022 Existing
conditions, 2026 Background conditions, and 2026 Future Buildout conditions. Table 15 displays
projected queueing for the intersection.
32
Old Charlotte Highway
Traffic Impact Analysis
33
Old Charlotte Highway
Traffic Impact Analysis
34
Old Charlotte Highway
Traffic Impact Analysis
The June Sayles Road / Site Access #2 intersection is proposed as a three-legged unsignalized
intersection. Under 2026 Future Buildout conditions, the AM and PM Peak Hour LOS is predicted
to be A with delays less than 10 seconds for all approaches.
Queue lengths are expected to less than three car lengths for all approaches.
Gannett Fleming recommends that this intersection be constructed as shown on the plans with
at least 100 feet of stem length as per NCDOT Guidelines.
Table 16 displays the Level of Service and Delay for the subject intersection for the 2022 Existing
conditions, 2026 Background conditions, and 2026 Future Buildout conditions. Table 17 displays
projected queueing for the intersection.
35
Old Charlotte Highway
Traffic Impact Analysis
36
Old Charlotte Highway
Traffic Impact Analysis
37
Old Charlotte Highway
Traffic Impact Analysis
VIII. Recommendations
To mitigate the traffic-related impacts caused by the Old Charlotte Highway multifamily
residential development and to provide for safe, efficient, and reliable traffic flow, Gannett
Fleming recommends the following:
38
Old Charlotte Highway
Traffic Impact Analysis
39
Old Charlotte Highway
Traffic Impact Analysis
IX. Conclusions
This Traffic Impact Analysis shows that the proposed Old Charlotte Highway development
impacts on the traffic operations at the study area intersections will be mitigated by the
recommended improvements. With the recommended improvements in place, the proposed
development will not negatively impact the health, safety, and welfare of the travelling public.
Additionally, based on projected volumes and NCDOT Left and Right Turn Lane Warrants,
Gannett Fleming does not recommend left or right turn lanes at any of the proposed accesses.
X. References
1Highway Capacity Manual, Special Report 209, Transportation Research Board, National
Research Council, Washington, D.C., 1998.
40
Old Charlotte Highway
Traffic Impact Analysis
A
Old Charlotte Highway
Traffic Impact Analysis
B
Old Charlotte Highway
Traffic Impact Analysis
C
Old Charlotte Highway
Traffic Impact Analysis
D
Old Charlotte Highway
Traffic Impact Analysis
E
E
Old Charlotte Highway
Traffic Impact Analysis
F
Old Charlotte Highway
Traffic Impact Analysis
G
Old Charlotte Highway
Traffic Impact Analysis
Appendix A: Traffic Data
Charlotte Hwy @ June Sayles Rd
Report Title 2
Report Title 3
Grand
0 13 0 1 0 14 0 17 2560 4 0 2581 0 11 0 80 0 91 0 20 1219 8 0 1247 3933
Total
Appr
92.9 0 7.1 0 0.7 99.2 0.2 0 12.1 0 87.9 0 1.6 97.8 0.6 0
%
Total
0.3 0 0 0 0.4 65.1 0.1 0 0.3 0 2 0 0.5 31 0.2 0
%
AM
07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15
Pk Hr
AM
6 0 1 0 7 13 1553 4 0 1570 8 0 43 0 51 13 608 6 0 627 2255
Pk Vol
AM
0.750 NaN 0.250 NaN 0.583 0.542 0.861 0.333 NaN 0.857 0.667 NaN 0.896 NaN 0.850 0.542 0.826 0.750 NaN 0.834 0.861
PHF
08:00 0 0 0 0 0 2 0 2 0 0 0 0 0 6 0 6 8
08:15 0 0 0 0 0 4 0 4 0 0 0 0 0 6 0 6 10
08:30 0 0 0 0 0 4 0 4 0 0 0 0 0 3 0 3 7
08:45 0 0 0 0 0 6 0 6 0 0 0 0 0 2 0 2 8
Total 0 0 0 0 0 0 0 0 16 0 0 16 0 0 0 0 0 0 0 0 17 0 0 17 33
Grand
0 0 0 0 0 0 0 0 29 0 0 29 0 0 0 0 0 0 0 0 28 0 0 28 57
Total
Appr
-2 -2 -2 -2 0 100 0 0 -2 -2 -2 -2 0 100 0 0
%
Total
0 0 0 0 0 50.9 0 0 0 0 0 0 0 49.1 0 0
%
AM
07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30 07:30
Pk Hr
AM
0 0 0 0 0 0 15 0 0 15 0 0 0 0 0 0 19 0 0 19 34
Pk Vol
AM
NaN NaN NaN NaN NaN NaN 0.750 NaN NaN 0.750 NaN NaN NaN NaN NaN NaN 0.792 NaN NaN 0.792 0.850
PHF
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
13 0 1 0 14 17 2589 4 0 2610 11 0 80 0 91 20 1247 8 0 1275 3990
Total
Appr
92.9 00.0 07.1 00.0 00.7 99.2 00.2 00.0 12.1 00.0 87.9 00.0 01.6 97.8 00.6 00.0
%
Total
00.3 00.0 00.0 00.0 00.4 64.9 00.1 00.0 00.3 00.0 02.0 00.0 00.5 31.3 00.2 00.0
%
%
00.0 - 00.0 - 00.0 00.0 01.1 00.0 - 01.1 00.0 - 00.0 - 00.0 00.0 02.2 00.0 - 02.2 01.4
Trucks
AM
07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15
Pk Hr
AM
6 0 1 0 7 13 1565 4 0 1582 8 0 43 0 51 13 622 6 0 641 2281
Pk Vol
AM
0.750 NaN 0.250 NaN 0.583 0.542 0.858 0.333 NaN 0.854 0.667 NaN 0.896 NaN 0.850 0.542 0.836 0.750 NaN 0.843 0.861
PHF
June Sayles Rd
In = 25 Out = 14
13 0 1 0
Right
17
Out = 1275
In = 1259
Charlotte Hwy
Charlotte Hwy
Thru
2589
Left
8
Total Volumes
07:00 to 09:00
Volume = 3990
1247
Thru
Left
Out = 2610
4
In = 2682
U-Turn
Right
20
0
U-Turn Left Thru Right
0 80 0 11
In = 24 Out = 91
June Sayles Rd
6 0 1 0
Right
13
0
Charlotte Hwy
Charlotte Hwy
1565
Thru
Left
Left
AM Peak Hour Factor: 0.861
4
U-Turn
Right
13
0
U-Turn Left Thru Right
0 43 0 8
4,000
Vehicles
3,600
3,200
2,800
2,400
2,000
1,600
1,200
800
400
0
07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00
Time
Grand
0 9 1 5 0 15 0 14 1770 9 0 1793 0 15 0 49 0 64 0 87 2713 17 0 2817 4689
Total
Appr
60 6.7 33.3 0 0.8 98.7 0.5 0 23.4 0 76.6 0 3.1 96.3 0.6 0
%
Total
0.2 0 0.1 0 0.3 37.7 0.2 0 0.3 0 1 0 1.9 57.9 0.4 0
%
PM
16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45
Pk Hr
PM
4 1 2 0 7 6 843 4 0 853 8 0 28 0 36 58 1481 8 0 1547 2443
Pk Vol
PM
0.500 0.250 0.500 NaN 0.875 0.300 0.912 0.500 NaN 0.919 0.500 NaN 0.778 NaN 0.818 0.690 0.935 0.667 NaN 0.921 0.923
PHF
17:00 0 0 0 0 0 4 0 4 0 0 0 0 0 3 0 3 7
17:15 0 0 0 0 0 3 0 3 0 0 0 0 0 0 0 0 3
17:30 0 0 0 0 0 1 0 1 0 0 0 0 0 2 0 2 3
17:45 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1 2
Total 0 0 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 0 0 6 0 0 6 15
Grand
0 0 0 0 0 0 0 0 23 1 0 24 0 0 0 0 0 0 0 0 17 0 0 17 41
Total
Appr
-2 -2 -2 -2 0 95.8 4.2 0 -2 -2 -2 -2 0 100 0 0
%
Total
0 0 0 0 0 56.1 2.4 0 0 0 0 0 0 41.5 0 0
%
PM
16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15
Pk Hr
PM
0 0 0 0 0 0 17 1 0 18 0 0 0 0 0 0 13 0 0 13 31
Pk Vol
PM
NaN NaN NaN NaN NaN NaN 0.850 0.250 NaN 0.750 NaN NaN NaN NaN NaN NaN 0.542 NaN NaN 0.542 0.861
PHF
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
9 1 5 0 15 14 1793 10 0 1817 15 0 49 0 64 87 2730 17 0 2834 4730
Total
Appr
60.0 06.7 33.3 00.0 00.8 98.7 00.6 00.0 23.4 00.0 76.6 00.0 03.1 96.3 00.6 00.0
%
Total
00.2 00.0 00.1 00.0 00.3 37.9 00.2 00.0 00.3 00.0 01.0 00.0 01.8 57.7 00.4 00.0
%
%
00.0 00.0 00.0 - 00.0 00.0 01.3 10.0 - 01.3 00.0 - 00.0 - 00.0 00.0 00.6 00.0 - 00.6 00.9
Trucks
PM
16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45
Pk Hr
PM
4 1 2 0 7 6 854 4 0 864 8 0 28 0 36 58 1492 8 0 1558 2465
Pk Vol
PM
0.500 0.250 0.500 NaN 0.875 0.300 0.909 0.500 NaN 0.915 0.500 NaN 0.778 NaN 0.818 0.690 0.935 0.667 NaN 0.927 0.927
PHF
June Sayles Rd
In = 31 Out = 15
9 1 5 0
Right
14
Out = 2834
In = 2750
Charlotte Hwy
Charlotte Hwy
Thru
1793
Left
17
Total Volumes
16:00 to 18:00
Volume = 4730
2730
Thru
Left
10
Out = 1817
In = 1851
U-Turn
Right
87
0
U-Turn Left Thru Right
0 49 0 15
In = 98 Out = 64
June Sayles Rd
4 1 2 0
Right
6
0
Charlotte Hwy
Charlotte Hwy
854
Thru
Left
Thru
Left
PM Peak Hour Factor: 0.927
4
U-Turn
Right
58
0
U-Turn Left Thru Right
0 28 0 8
6,000
Vehicles
5,400
4,800
4,200
3,600
3,000
2,400
1,800
1,200
600
0
04:00 04:15 04:30 04:45 05:00 05:15 05:30 05:45 06:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
04:00 04:15 04:30 04:45 05:00 05:15 05:30 05:45 06:00
Time
Grand
0 51 3 18 0 72 0 8 2591 29 0 2628 0 41 6 52 0 99 0 101 1132 55 0 1288 4087
Total
Appr
70.8 4.2 25 0 0.3 98.6 1.1 0 41.4 6.1 52.5 0 7.8 87.9 4.3 0
%
Total
1.2 0.1 0.4 0 0.2 63.4 0.7 0 1 0.1 1.3 0 2.5 27.7 1.3 0
%
AM
07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15
Pk Hr
AM
34 1 12 0 47 5 1567 15 0 1587 20 3 28 0 51 55 595 29 0 679 2364
Pk Vol
AM
0.773 0.250 0.600 NaN 0.839 0.417 0.801 0.750 NaN 0.803 0.833 0.750 0.636 NaN 0.708 0.529 0.836 0.604 NaN 0.797 0.808
PHF
08:00 0 0 0 0 0 4 0 4 0 0 0 0 0 7 0 7 11
08:15 0 0 0 0 0 4 0 4 0 0 1 1 2 3 0 5 10
08:30 0 0 0 0 0 5 0 5 0 0 1 1 0 10 0 10 16
08:45 0 0 0 0 0 9 0 9 1 0 0 1 0 9 0 9 19
Total 0 0 0 0 0 0 0 0 22 0 0 22 0 1 0 2 0 3 0 2 29 0 0 31 56
Grand
0 0 0 0 0 0 0 0 38 0 0 38 0 3 0 2 0 5 0 2 44 0 0 46 89
Total
Appr
-2 -2 -2 -2 0 100 0 0 60 0 40 0 4.3 95.7 0 0
%
Total
0 0 0 0 0 42.7 0 0 3.4 0 2.2 0 2.2 49.4 0 0
%
AM
08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00
Pk Hr
AM
0 0 0 0 0 0 22 0 0 22 1 0 2 0 3 2 29 0 0 31 56
Pk Vol
AM
NaN NaN NaN NaN NaN NaN 0.611 NaN NaN 0.611 0.250 NaN 0.500 NaN 0.750 0.250 0.725 NaN NaN 0.775 0.737
PHF
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
51 3 18 0 72 8 2629 29 0 2666 44 6 54 0 104 103 1176 55 0 1334 4176
Total
Appr
70.8 04.2 25.0 00.0 00.3 98.6 01.1 00.0 42.3 05.8 51.9 00.0 07.7 88.2 04.1 00.0
%
Total
01.2 00.1 00.4 00.0 00.2 63.0 00.7 00.0 01.1 00.1 01.3 00.0 02.5 28.2 01.3 00.0
%
%
00.0 00.0 00.0 - 00.0 00.0 01.4 00.0 - 01.4 06.8 00.0 03.7 - 04.8 01.9 03.7 00.0 - 03.4 02.1
Trucks
AM
07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15
Pk Hr
AM
34 1 12 0 47 5 1585 15 0 1605 22 3 28 0 53 55 614 29 0 698 2403
Pk Vol
AM
0.773 0.250 0.600 NaN 0.839 0.417 0.809 0.750 NaN 0.811 0.786 0.750 0.636 NaN 0.736 0.529 0.839 0.604 NaN 0.800 0.815
PHF
In = 69 Out = 72
51 3 18 0
Right
Out = 1334
8
0
In = 1238
Charlotte Hwy
Charlotte Hwy
Thru
2629
Left
55
Total Volumes
07:00 to 09:00
Volume = 4176
1176
Thru
Left
29
Out = 2666
In = 2734
U-Turn
Right
103
0
U-Turn Left Thru Right
0 54 6 44
Ingles Driveway
34 1 12 0
Right
5
0
Charlotte Hwy
Charlotte Hwy
1585
Thru
Left
29
Left
AM Peak Hour Factor: 0.815
15
U-Turn
Right
55
0
U-Turn Left Thru Right
0 28 3 22
Ingles Driveway
6,000
Vehicles
5,400
4,800
4,200
3,600
3,000
2,400
1,800
1,200
600
0
07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00
Time
Grand
0 73 10 45 0 128 0 10 1729 86 0 1825 0 194 14 136 0 344 0 263 2561 115 0 2939 5236
Total
Appr
57 7.8 35.2 0 0.5 94.7 4.7 0 56.4 4.1 39.5 0 8.9 87.1 3.9 0
%
Total
1.4 0.2 0.9 0 0.2 33 1.6 0 3.7 0.3 2.6 0 5 48.9 2.2 0
%
PM
16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45
Pk Hr
PM
40 5 25 0 70 5 807 45 0 857 110 6 71 0 187 140 1393 61 0 1594 2708
Pk Vol
PM
0.714 0.417 0.568 NaN 0.729 0.625 0.851 0.703 NaN 0.871 0.859 0.500 0.740 NaN 0.806 0.854 0.891 0.610 NaN 0.906 0.939
PHF
17:00 0 0 0 0 0 3 0 3 0 0 0 0 0 3 0 3 6
17:15 0 0 0 0 0 4 0 4 0 0 0 0 0 0 0 0 4
17:30 0 0 0 0 0 1 0 1 0 0 0 0 0 3 0 3 4
17:45 0 0 0 0 0 2 0 2 0 0 0 0 0 2 0 2 4
Total 0 0 0 0 0 0 0 0 10 0 0 10 0 0 0 0 0 0 0 0 8 0 0 8 18
Grand
0 0 0 0 0 0 0 0 25 0 0 25 0 1 0 0 0 1 0 0 22 0 0 22 48
Total
Appr
-2 -2 -2 -2 0 100 0 0 100 0 0 0 0 100 0 0
%
Total
0 0 0 0 0 52.1 0 0 2.1 0 0 0 0 45.8 0 0
%
PM
16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00 16:00
Pk Hr
PM
0 0 0 0 0 0 15 0 0 15 1 0 0 0 1 0 14 0 0 14 30
Pk Vol
PM
NaN NaN NaN NaN NaN NaN 0.750 NaN NaN 0.750 0.250 NaN NaN NaN 0.250 NaN 0.500 NaN NaN 0.500 0.625
PHF
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
73 10 45 0 128 10 1754 86 0 1850 195 14 136 0 345 263 2583 115 0 2961 5284
Total
Appr
57.0 07.8 35.2 00.0 00.5 94.8 04.6 00.0 56.5 04.1 39.4 00.0 08.9 87.2 03.9 00.0
%
Total
01.4 00.2 00.9 00.0 00.2 33.2 01.6 00.0 03.7 00.3 02.6 00.0 05.0 48.9 02.2 00.0
%
%
00.0 00.0 00.0 - 00.0 00.0 01.4 00.0 - 01.4 00.5 00.0 00.0 - 00.3 00.0 00.9 00.0 - 00.7 00.9
Trucks
PM
16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45
Pk Hr
PM
40 5 25 0 70 5 820 45 0 870 110 6 71 0 187 140 1406 61 0 1607 2734
Pk Vol
PM
0.714 0.417 0.568 NaN 0.729 0.625 0.854 0.703 NaN 0.873 0.859 0.500 0.740 NaN 0.806 0.854 0.899 0.610 NaN 0.913 0.943
PHF
73 10 45 0
Right
10
Out = 2961
In = 2823
Charlotte Hwy
Charlotte Hwy
Thru
1754
Left
115
Total Volumes
16:00 to 18:00
Volume = 5284
2583
Thru
Left
86
Out = 1850
In = 1963
U-Turn
Right
263
0
U-Turn Left Thru Right
0 136 14 195
Ingles Driveway
40 5 25 0
Right
5
0
Charlotte Hwy
Charlotte Hwy
820
Thru
Left
61
Thru
Left
PM Peak Hour Factor: 0.943
45
U-Turn
Right
140
0
U-Turn Left Thru Right
0 71 6 110
Ingles Driveway
6,000
Vehicles
5,400
4,800
4,200
3,600
3,000
2,400
1,800
1,200
600
0
04:00 04:15 04:30 04:45 05:00 05:15 05:30 05:45 06:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
04:00 04:15 04:30 04:45 05:00 05:15 05:30 05:45 06:00
Time
Time Right Thru Left Appr Total Right Thru Left Appr Total Right Thru Left Appr Total Right Thru Left Appr Total Int Total
7:00 4 0 0 4 0 62 4 66 2 1 2 5 3 51 4 58 133
7:05 5 2 3 10 0 66 10 76 2 0 11 13 7 36 4 47 146
7:10 3 1 0 4 1 81 12 94 6 1 16 23 5 41 6 52 173
7:15 7 6 2 15 1 74 10 85 1 1 20 22 10 42 3 55 177
7:20 10 6 1 17 2 102 20 124 8 1 20 29 11 43 2 56 226
7:25 3 8 0 11 0 101 20 121 13 0 20 33 35 41 5 81 246
7:30 13 6 1 20 1 104 17 122 9 3 30 42 35 36 2 73 257
7:35 9 3 0 12 1 134 32 167 11 11 23 45 29 37 2 68 292
7:40 12 3 1 16 0 132 25 157 5 2 25 32 15 52 1 68 273
7:45 4 3 3 10 1 142 35 178 8 1 25 34 16 41 3 60 282
7:50 10 1 0 11 1 133 25 159 12 1 17 30 17 73 4 94 294
7:55 1 2 4 7 1 121 26 148 13 3 25 41 11 64 8 83 279
8:00 6 0 2 8 1 112 5 118 16 2 18 36 5 58 1 64 226
8:05 8 1 1 10 0 111 1 112 6 0 3 9 3 47 4 54 185
8:10 5 1 0 6 2 112 0 114 2 2 3 7 3 62 4 69 196
8:15 4 0 1 5 0 120 2 122 3 0 3 6 3 49 5 57 190
8:20 4 1 5 10 0 96 2 98 0 1 2 3 4 68 1 73 184
8:25 6 1 2 9 0 81 2 83 3 0 1 4 3 42 6 51 147
8:30 6 1 5 12 0 60 2 62 3 0 3 6 5 43 2 50 130
8:35 4 0 3 7 0 96 1 97 1 0 5 6 1 71 3 75 185
8:40 5 0 3 8 1 86 0 87 0 0 3 3 5 46 3 54 152
8:45 3 1 4 8 0 95 1 96 0 0 2 2 5 72 0 77 183
8:50 7 1 3 11 0 107 2 109 0 0 2 2 1 56 0 57 179
8:55 2 0 0 2 0 70 3 73 0 0 1 1 1 54 5 60 136
Period Total 141 48 44 233 13 2398 257 2668 124 30 280 434 233 1225 78 1536 4871
Hour Totals
7:00 81 41 15 137 9 1252 236 1497 90 25 234 349 194 557 44 795 2778
7:05 83 41 17 141 10 1302 237 1549 104 26 250 380 196 564 41 801 2871
7:10 86 40 15 141 10 1347 228 1585 108 26 242 376 192 575 41 808 2910
7:15 88 40 15 143 11 1378 216 1605 104 27 229 360 190 596 39 825 2933
7:20 85 34 14 133 10 1424 208 1642 106 26 212 344 183 603 41 827 2946
7:25 79 29 18 126 8 1418 190 1616 98 26 194 318 176 628 40 844 2904
7:30 82 22 20 124 8 1398 172 1578 88 26 175 289 144 629 41 814 2805
7:35 75 17 24 116 7 1354 157 1518 82 23 148 253 114 636 41 791 2678
7:40 70 14 27 111 6 1316 126 1448 72 12 130 214 86 670 42 798 2571
7:45 63 11 29 103 7 1270 101 1378 67 10 108 185 76 664 44 784 2450
7:50 62 9 30 101 6 1223 67 1296 59 9 85 153 65 695 41 801 2351
7:55 59 9 33 101 5 1197 44 1246 47 8 70 125 49 678 37 764 2236
8:00 60 7 29 96 4 1146 21 1171 34 5 46 85 39 668 34 741 2093
AM Pk Hr
7:20 85 34 14 133 10 1424 208 1642 106 26 212 344 183 603 41 827 2946
Charlotte Hwy @ Rocket Dr
Grand
0 32 23 6 0 61 0 4 483 74 0 561 0 32 4 86 0 122 0 70 248 24 0 342 1086
Total
Appr
52.5 37.7 9.8 0 0.7 86.1 13.2 0 26.2 3.3 70.5 0 20.5 72.5 7 0
%
Total
2.9 2.1 0.6 0 0.4 44.5 6.8 0 2.9 0.4 7.9 0 6.4 22.8 2.2 0
%
AM
07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10
Pk Hr
AM
23 21 3 0 47 4 357 61 0 422 28 3 75 0 106 60 162 16 0 238 813
Pk Vol
AM
0.575 0.656 0.375 NaN 0.691 0.500 0.875 0.763 NaN 0.858 0.538 0.750 0.938 NaN 0.803 0.429 0.988 0.667 NaN 0.744 0.833
PHF
Grand
0 0 0 0 0 0 0 0 3 2 0 5 0 0 0 3 0 3 0 1 6 0 0 7 15
Total
Appr
-2 -2 -2 -2 0 60 40 0 0 0 100 0 14.3 85.7 0 0
%
Total
0 0 0 0 0 20 13.3 0 0 0 20 0 6.7 40 0 0
%
AM
07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05 07:05
Pk Hr
AM
0 0 0 0 0 0 2 2 0 4 0 0 3 0 3 1 4 0 0 5 12
Pk Vol
AM
NaN NaN NaN NaN NaN NaN 0.250 0.500 NaN 0.333 NaN NaN 0.375 NaN 0.375 0.250 0.500 NaN NaN 0.417 0.600
PHF
AM
07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10 07:10
Pk Hr
AM
23 21 3 0 47 4 358 62 0 424 28 3 76 0 107 61 167 16 0 244 822
Pk Vol
AM
0.575 0.656 0.375 NaN 0.691 0.500 0.877 0.775 NaN 0.855 0.538 0.750 0.950 NaN 0.811 0.436 0.971 0.667 NaN 0.753 0.835
PHF
Cedar Ridge Dr
In = 32 Out = 61
32 23 6 0
Right
4
0
Out = 349
In = 292
Charlotte Hwy
Charlotte Hwy
Thru
Left
486
24
Total Volumes
07:00 to 07:30
Volume = 1101
Thru
Left
254
76
Out = 566
In = 607
U-Turn
Right
71
0
U-Turn Left Thru Right
0 89 4 32
Rocket Dr
Cedar Ridge Dr
23 21 3 0
Right
4
0
Charlotte Hwy
Charlotte Hwy
358
Thru
Left
16
Left
AM Peak Hour Factor: 0.835
62
U-Turn
Right
61
0
U-Turn Left Thru Right
0 76 3 28
Rocket Dr
2,000
Vehicles
1,800
1,600
1,400
1,200
1,000
800
600
400
200
0
07:15 07:30
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
07:15 07:30
Time
Grand
0 49 18 9 0 76 0 5 754 159 0 918 0 58 11 142 0 211 0 121 292 20 0 433 1638
Total
Appr
64.5 23.7 11.8 0 0.5 82.1 17.3 0 27.5 5.2 67.3 0 27.9 67.4 4.6 0
%
Total
3 1.1 0.5 0 0.3 46 9.7 0 3.5 0.7 8.7 0 7.4 17.8 1.2 0
%
AM
07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35
Pk Hr
AM
35 10 4 0 49 3 534 116 0 653 36 5 90 0 131 76 196 10 0 282 1115
Pk Vol
AM
0.729 0.833 0.333 NaN 0.766 0.750 0.954 0.829 NaN 0.928 0.750 0.625 0.900 NaN 0.936 0.679 0.681 0.625 NaN 0.758 0.961
PHF
Grand
0 0 0 0 0 0 0 0 12 1 0 13 0 0 0 3 0 3 0 2 11 0 0 13 29
Total
Appr
-2 -2 -2 -2 0 92.3 7.7 0 0 0 100 0 15.4 84.6 0 0
%
Total
0 0 0 0 0 41.4 3.4 0 0 0 10.3 0 6.9 37.9 0 0
%
AM
07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40 07:40
Pk Hr
AM
0 0 0 0 0 0 9 1 0 10 0 0 2 0 2 0 8 0 0 8 20
Pk Vol
AM
NaN NaN NaN NaN NaN NaN 0.750 0.250 NaN 0.833 NaN NaN 0.250 NaN 0.250 NaN 0.667 NaN NaN 0.667 0.625
PHF
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
49 18 9 0 76 5 766 160 0 931 58 11 145 0 214 123 303 20 0 446 1667
Total
Appr
64.5 23.7 11.8 00.0 00.5 82.3 17.2 00.0 27.1 05.1 67.8 00.0 27.6 67.9 04.5 00.0
%
Total
02.9 01.1 00.5 00.0 00.3 46.0 09.6 00.0 03.5 00.7 08.7 00.0 07.4 18.2 01.2 00.0
%
%
00.0 00.0 00.0 - 00.0 00.0 01.6 00.6 - 01.4 00.0 00.0 02.1 - 01.4 01.6 03.6 00.0 - 02.9 01.7
Trucks
AM
07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35 07:35
Pk Hr
AM
35 10 4 0 49 3 541 117 0 661 36 5 90 0 131 77 203 10 0 290 1131
Pk Vol
AM
0.729 0.833 0.333 NaN 0.766 0.750 0.952 0.836 NaN 0.928 0.750 0.625 0.900 NaN 0.936 0.664 0.695 0.625 NaN 0.771 0.962
PHF
Cedar Ridge Dr
In = 36 Out = 76
49 18 9 0
Right
5
0
Out = 446
In = 370
Charlotte Hwy
Charlotte Hwy
Thru
Left
766
20
Total Volumes
07:30 to 08:00
Volume = 1667
Thru
Left
160
303
Out = 931
In = 960
U-Turn
Right
123
0
U-Turn Left Thru Right
0 145 11 58
Rocket Dr
Cedar Ridge Dr
35 10 4 0
Right
3
0
Charlotte Hwy
Charlotte Hwy
541
Thru
Left
10
117
Thru
203
Left
AM Peak Hour Factor: 0.962
U-Turn
Right
77
0
U-Turn Left Thru Right
0 90 5 36
Rocket Dr
2,000
Vehicles
1,800
1,600
1,400
1,200
1,000
800
600
400
200
0
07:30 07:45 08:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
07:30 07:45 08:00
Time
Grand
0 33 4 11 0 48 0 3 625 12 0 640 0 30 5 28 0 63 0 18 313 21 0 352 1103
Total
Appr
68.8 8.3 22.9 0 0.5 97.7 1.9 0 47.6 7.9 44.4 0 5.1 88.9 6 0
%
Total
3 0.4 1 0 0.3 56.7 1.1 0 2.7 0.5 2.5 0 1.6 28.4 1.9 0
%
AM
08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00
Pk Hr
AM
23 2 4 0 29 3 453 8 0 464 27 4 25 0 56 12 204 14 0 230 779
Pk Vol
AM
0.719 0.500 0.500 NaN 0.725 0.375 0.944 0.400 NaN 0.951 0.422 0.500 0.347 NaN 0.389 0.750 0.879 0.700 NaN 0.898 0.869
PHF
Grand
0 0 0 0 0 0 0 0 7 0 0 7 0 0 0 2 0 2 0 3 13 0 0 16 25
Total
Appr
-2 -2 -2 -2 0 100 0 0 0 0 100 0 18.8 81.3 0 0
%
Total
0 0 0 0 0 28 0 0 0 0 8 0 12 52 0 0
%
AM
08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00
Pk Hr
AM
0 0 0 0 0 0 2 0 0 2 0 0 2 0 2 2 12 0 0 14 18
Pk Vol
AM
NaN NaN NaN NaN NaN NaN 0.250 NaN NaN 0.250 NaN NaN 0.250 NaN 0.250 0.500 0.750 NaN NaN 0.700 0.643
PHF
AM
08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00
Pk Hr
AM
23 2 4 0 29 3 455 8 0 466 27 4 27 0 58 14 216 14 0 244 797
Pk Vol
AM
0.719 0.500 0.500 NaN 0.725 0.375 0.948 0.400 NaN 0.955 0.422 0.500 0.375 NaN 0.403 0.700 0.871 0.700 NaN 0.884 0.882
PHF
Cedar Ridge Dr
In = 29 Out = 48
33 4 11 0
Right
3
0
Out = 368
In = 367
Charlotte Hwy
Charlotte Hwy
Thru
Left
632
21
Total Volumes
08:00 to 08:30
Volume = 1128
Thru
Left
326
12
Out = 647
In = 695
U-Turn
Right
21
0
U-Turn Left Thru Right
0 30 5 30
In = 37 Out = 65
Rocket Dr
Cedar Ridge Dr
23 2 4 0
Right
3
0
Charlotte Hwy
Charlotte Hwy
455
Thru
Left
14
Left
AM Peak Hour Factor: 0.882
8
U-Turn
Right
14
0
U-Turn Left Thru Right
0 27 4 27
Rocket Dr
2,000
Vehicles
1,800
1,600
1,400
1,200
1,000
800
600
400
200
0
08:00 08:15 08:30
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
08:00 08:15 08:30
Time
Grand
0 27 3 18 0 48 0 1 504 9 0 514 0 4 0 14 0 18 0 17 336 13 0 366 946
Total
Appr
56.3 6.3 37.5 0 0.2 98.1 1.8 0 22.2 0 77.8 0 4.6 91.8 3.6 0
%
Total
2.9 0.3 1.9 0 0.1 53.3 1 0 0.4 0 1.5 0 1.8 35.5 1.4 0
%
AM
08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35
Pk Hr
AM
19 2 13 0 34 1 378 4 0 383 1 0 10 0 11 12 241 6 0 259 687
Pk Vol
AM
0.679 0.500 0.813 NaN 0.773 0.250 0.892 0.500 NaN 0.887 0.250 NaN 0.625 NaN 0.550 0.600 0.849 0.500 NaN 0.863 0.954
PHF
Grand
0 0 0 0 0 0 0 0 10 0 0 10 0 0 0 2 0 2 0 1 6 0 0 7 19
Total
Appr
-2 -2 -2 -2 0 100 0 0 0 0 100 0 14.3 85.7 0 0
%
Total
0 0 0 0 0 52.6 0 0 0 0 10.5 0 5.3 31.6 0 0
%
AM
08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30 08:30
Pk Hr
AM
0 0 0 0 0 0 8 0 0 8 0 0 1 0 1 0 4 0 0 4 13
Pk Vol
AM
NaN NaN NaN NaN NaN NaN 0.500 NaN NaN 0.500 NaN NaN 0.250 NaN 0.250 NaN 0.333 NaN NaN 0.333 0.650
PHF
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
27 3 18 0 48 1 514 9 0 524 4 0 16 0 20 18 342 13 0 373 965
Total
Appr
56.3 06.3 37.5 00.0 00.2 98.1 01.7 00.0 20.0 00.0 80.0 00.0 04.8 91.7 03.5 00.0
%
Total
02.8 00.3 01.9 00.0 00.1 53.3 00.9 00.0 00.4 00.0 01.7 00.0 01.9 35.4 01.3 00.0
%
%
00.0 00.0 00.0 - 00.0 00.0 01.9 00.0 - 01.9 00.0 - 12.5 - 10.0 05.6 01.8 00.0 - 01.9 02.0
Trucks
AM
08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35 08:35
Pk Hr
AM
19 2 13 0 34 1 384 4 0 389 1 0 12 0 13 12 245 6 0 263 699
Pk Vol
AM
0.679 0.500 0.813 NaN 0.773 0.250 0.897 0.500 NaN 0.892 0.250 NaN 0.600 NaN 0.542 0.600 0.851 0.500 NaN 0.854 0.945
PHF
Cedar Ridge Dr
In = 14 Out = 48
27 3 18 0
Right
1
0
Out = 373
In = 364
Charlotte Hwy
Charlotte Hwy
Thru
Left
514
13
Total Volumes
08:30 to 09:00
Volume = 965
Thru
Left
342
Out = 524
In = 557
U-Turn
Right
18
0
U-Turn Left Thru Right
0 16 0 4
In = 30 Out = 20
Rocket Dr
Cedar Ridge Dr
19 2 13 0
Right
1
0
Charlotte Hwy
Charlotte Hwy
384
Thru
Left
Left
AM Peak Hour Factor: 0.945
4
U-Turn
Right
12
0
U-Turn Left Thru Right
0 12 0 1
Rocket Dr
1,000
Vehicles
900
800
700
600
500
400
300
200
100
0
08:45 09:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
08:45 09:00
Time
Grand
0 69 11 37 0 117 6 17 1802 88 0 1907 0 101 7 107 0 215 0 82 2824 80 0 2986 5225
Total
Appr
59 9.4 31.6 0 0.9 94.5 4.6 0 47 3.3 49.8 0 2.7 94.6 2.7 0
%
Total
1.3 0.2 0.7 0 0.3 34.5 1.7 0 1.9 0.1 2 0 1.6 54 1.5 0
%
PM
16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45 16:45
Pk Hr
PM
32 4 18 0 54 8 846 51 0 905 54 3 46 0 103 56 1532 46 0 1634 2696
Pk Vol
PM
0.727 0.500 0.750 NaN 0.844 0.667 0.846 0.638 NaN 0.844 0.587 0.375 0.719 NaN 0.660 0.824 0.930 0.605 NaN 0.920 0.940
PHF
17:00 0 0 0 0 0 4 0 4 0 0 0 0 0 3 0 3 7
17:15 0 0 0 0 0 4 0 4 0 0 0 0 0 0 0 0 4
17:30 0 0 0 0 0 1 0 1 0 0 1 1 0 3 0 3 5
17:45 0 0 0 0 0 1 0 1 0 0 0 0 0 3 0 3 4
Total 0 0 0 0 0 0 0 0 10 0 0 10 0 0 0 1 0 1 0 0 9 0 0 9 20
Grand
0 0 0 0 0 0 0 0 20 5 0 25 0 0 0 4 0 4 0 6 21 0 0 27 56
Total
Appr
-2 -2 -2 -2 0 80 20 0 0 0 100 0 22.2 77.8 0 0
%
Total
0 0 0 0 0 35.7 8.9 0 0 0 7.1 0 10.7 37.5 0 0
%
PM
16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15 16:15
Pk Hr
PM
0 0 0 0 0 0 13 4 0 17 0 0 2 0 2 5 13 0 0 18 37
Pk Vol
PM
NaN NaN NaN NaN NaN NaN 0.813 0.250 NaN 0.708 NaN NaN 0.500 NaN 0.500 0.313 0.464 NaN NaN 0.643 0.712
PHF
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
69 11 37 0 117 17 1822 93 0 1932 101 7 111 0 219 88 2845 80 0 3013 5281
Total
Appr
59.0 09.4 31.6 00.0 00.9 94.3 04.8 00.0 46.1 03.2 50.7 00.0 02.9 94.4 02.7 00.0
%
Total
01.3 00.2 00.7 00.0 00.3 34.5 01.8 00.0 01.9 00.1 02.1 00.0 01.7 53.9 01.5 00.0
%
%
00.0 00.0 00.0 - 00.0 00.0 01.1 05.4 - 01.3 00.0 00.0 03.6 - 01.8 06.8 00.7 00.0 - 00.9 01.1
Trucks
PM
16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30 16:30
Pk Hr
PM
33 6 19 0 58 7 909 53 0 969 55 4 52 0 111 54 1484 48 0 1586 2724
Pk Vol
PM
0.750 0.750 0.792 NaN 0.906 0.583 0.895 0.663 NaN 0.891 0.598 0.500 0.765 NaN 0.712 0.794 0.900 0.632 NaN 0.893 0.945
PHF
Cedar Ridge Dr
69 11 37 0
Right
17
Out = 3013
In = 2983
Charlotte Hwy
Charlotte Hwy
Thru
1822
Left
80
Total Volumes
16:00 to 18:00
Volume = 5281
2845
Thru
Left
93
Out = 1932
In = 2002
U-Turn
Right
88
0
U-Turn Left Thru Right
0 111 7 101
Rocket Dr
Cedar Ridge Dr
33 6 19 0
Right
7
0
Charlotte Hwy
Charlotte Hwy
909
Thru
Left
48
Thru
Left
PM Peak Hour Factor: 0.945
53
U-Turn
Right
54
0
U-Turn Left Thru Right
0 52 4 55
Rocket Dr
6,000
Vehicles
5,400
4,800
4,200
3,600
3,000
2,400
1,800
1,200
600
0
04:00 04:15 04:30 04:45 05:00 05:15 05:30 05:45 06:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
04:00 04:15 04:30 04:45 05:00 05:15 05:30 05:45 06:00
Time
08:00 0 2 0 2 0 0 0 3 3 1 0 0 1 6
08:15 0 1 0 1 0 0 0 2 2 0 0 0 0 3
08:30 0 3 0 3 0 0 0 1 1 0 0 1 1 5
08:45 0 0 0 0 0 0 0 1 1 0 0 0 0 1
Total 0 0 6 0 0 6 0 0 0 0 0 0 0 0 0 7 0 7 0 1 0 1 0 2 15
Grand
0 5 12 0 0 17 0 0 0 0 0 0 0 0 5 17 0 22 0 1 0 2 0 3 42
Total
Appr
29.4 70.6 0 0 -2 -2 -2 -2 0 22.7 77.3 0 33.3 0 66.7 0
%
Total
11.9 28.6 0 0 0 0 0 0 0 11.9 40.5 0 2.4 0 4.8 0
%
AM
07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15
Pk Hr
AM
5 6 0 0 11 0 0 0 0 0 0 5 12 0 17 1 0 1 0 2 30
Pk Vol
AM
0.417 0.500 NaN NaN 0.688 NaN NaN NaN NaN NaN NaN 0.417 0.600 NaN 0.708 0.250 NaN 0.250 NaN 0.500 0.750
PHF
08:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
08:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0
08:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0
08:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total
Appr
-2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2
%
Total
-3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3
%
AM
06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30 06:30
Pk Hr
AM
0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1
Pk Vol
AM
NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 0.250 NaN 0.250 NaN NaN NaN NaN NaN 0.250
PHF
08:00 0 2 0 0 2 0 0 0 0 0 0 0 3 0 3 1 0 0 0 1 6
08:15 0 1 0 0 1 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0 3
08:30 0 3 0 0 3 0 0 0 0 0 0 0 1 0 1 0 0 1 0 1 5
08:45 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1
Total 0 6 0 0 6 0 0 0 0 0 0 0 7 0 7 1 0 1 0 2 15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
5 12 0 0 17 0 0 0 0 0 0 5 17 0 22 1 0 2 0 3 42
Total
Appr
29.4 70.6 00.0 00.0 NaN NaN NaN NaN 00.0 22.7 77.3 00.0 33.3 00.0 66.7 00.0
%
Total
11.9 28.6 00.0 00.0 00.0 00.0 00.0 00.0 00.0 11.9 40.5 00.0 02.4 00.0 04.8 00.0
%
%
00.0 00.0 - - 00.0 - - - - - - 00.0 00.0 - 00.0 00.0 - 00.0 - 00.0 00.0
Trucks
AM
07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15 07:15
Pk Hr
AM
5 6 0 0 11 0 0 0 0 0 0 5 12 0 17 1 0 1 0 2 30
Pk Vol
AM
0.417 0.500 NaN NaN 0.688 NaN NaN NaN NaN NaN NaN 0.417 0.600 NaN 0.708 0.250 NaN 0.250 NaN 0.500 0.750
PHF
June Sayles Rd
In = 7 Out = 17
5 12 0 0
Right
0
0
Out = 3
In = 0
Old Charlotte Hwy
Thru
Left
0
2
Total Volumes
07:00 to 09:00
Volume = 42
Thru
Left
0
0
Out = 0
In = 22
U-Turn
Right
0
1
0 17 5 0
In = 13 Out = 22
June Sayles Rd
June Sayles Rd
5 6 0 0
Right
0
0
Old Charlotte Hwy
Thru
Left
0
1
Left
AM Peak Hour Factor: 0.750
0
0
U-Turn
Right
0
1
0 12 5 0
June Sayles Rd
100
Vehicles
90
80
70
60
50
40
30
20
10
0
07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00
Time
17:00 0 1 0 1 0 0 2 0 2 1 0 1 2 5
17:15 0 0 0 0 0 0 3 1 4 1 0 0 1 5
17:30 0 2 0 2 0 0 1 0 1 0 0 0 0 3
17:45 2 0 0 2 0 0 2 0 2 2 0 1 3 7
Total 0 2 3 0 0 5 0 0 0 0 0 0 0 0 8 1 0 9 0 4 0 2 0 6 20
Grand
0 3 8 0 0 11 0 0 0 0 0 0 0 0 17 13 0 30 0 7 0 3 0 10 51
Total
Appr
27.3 72.7 0 0 -2 -2 -2 -2 0 56.7 43.3 0 70 0 30 0
%
Total
5.9 15.7 0 0 0 0 0 0 0 33.3 25.5 0 13.7 0 5.9 0
%
PM
15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30
Pk Hr
PM
0 9 0 0 9 0 0 0 0 0 0 7 11 0 18 5 0 0 0 5 32
Pk Vol
PM
NaN 0.450 NaN NaN 0.450 NaN NaN NaN NaN NaN NaN 0.583 0.688 NaN 0.643 0.417 NaN NaN NaN 0.417 0.727
PHF
17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total
Appr
-2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2
%
Total
-3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3
%
PM
15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45
Pk Hr
PM
0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1
Pk Vol
PM
NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 0.250 NaN 0.250 NaN NaN NaN NaN NaN 0.250
PHF
17:00 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 1 0 1 0 2 5
17:15 0 0 0 0 0 0 0 0 0 0 0 3 1 0 4 1 0 0 0 1 5
17:30 0 2 0 0 2 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 3
17:45 2 0 0 0 2 0 0 0 0 0 0 2 0 0 2 2 0 1 0 3 7
Total 2 3 0 0 5 0 0 0 0 0 0 8 1 0 9 4 0 2 0 6 20
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
3 8 0 0 11 0 0 0 0 0 0 17 13 0 30 7 0 3 0 10 51
Total
Appr
27.3 72.7 00.0 00.0 NaN NaN NaN NaN 00.0 56.7 43.3 00.0 70.0 00.0 30.0 00.0
%
Total
05.9 15.7 00.0 00.0 00.0 00.0 00.0 00.0 00.0 33.3 25.5 00.0 13.7 00.0 05.9 00.0
%
%
00.0 00.0 - - 00.0 - - - - - - 00.0 00.0 - 00.0 00.0 - 00.0 - 00.0 00.0
Trucks
PM
15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30 15:30
Pk Hr
PM
0 9 0 0 9 0 0 0 0 0 0 7 12 0 19 5 0 0 0 5 33
Pk Vol
PM
NaN 0.450 NaN NaN 0.450 NaN NaN NaN NaN NaN NaN 0.583 0.750 NaN 0.679 0.417 NaN NaN NaN 0.417 0.750
PHF
June Sayles Rd
In = 20 Out = 11
3 8 0 0
Right
0
0
Out = 10
In = 0
Old Charlotte Hwy
Thru
Left
0
3
Total Volumes
16:00 to 18:00
Volume = 51
Thru
Left
0
0
Out = 0
In = 16
U-Turn
Right
0
7
0 13 17 0
In = 15 Out = 30
June Sayles Rd
June Sayles Rd
0 9 0 0
Right
0
0
Old Charlotte Hwy
Thru
Left
0
0
Left
PM Peak Hour Factor: 0.750
0
0
U-Turn
Right
0
5
0 12 7 0
June Sayles Rd
100
Vehicles
90
80
70
60
50
40
30
20
10
0
04:00 04:15 04:30 04:45 05:00 05:15 05:30 05:45 06:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
04:00 04:15 04:30 04:45 05:00 05:15 05:30 05:45 06:00
Time
Olde Eastwood Village Blvd Old Charlotte Hwy Olde Eastwood Village Blvd Old Charlotte Hwy
Southbound Westbound Northbound Eastbound
U- Appr U- Appr U- Appr Appr
Time Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left U-Turn Int Total
Turn Total Turn Total Turn Total Total
06:00 0 3 1 0 4 0 0 0 0 0 0 0 1 0 1 0 1 0 0 1 6
06:15 0 5 3 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 11
06:30 0 2 7 0 9 0 0 0 0 0 0 0 2 0 2 0 1 1 1 3 14
06:45 0 2 6 0 8 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 10
Total 0 12 17 0 0 29 0 0 0 0 0 0 0 0 3 0 0 3 0 4 1 4 0 9 41
07:00 0 2 9 0 11 0 0 1 0 1 0 0 1 3 4 0 0 0 0 0 16
07:15 0 7 7 0 14 0 1 2 0 3 0 0 1 3 4 0 0 1 3 4 25
07:30 1 11 9 0 20 0 0 4 0 4 0 0 2 1 3 0 0 3 4 7 34
07:45 2 12 8 0 20 0 3 3 0 6 0 0 4 0 4 0 0 0 7 7 37
Total 3 32 33 0 0 65 0 4 10 0 0 14 0 0 8 7 0 15 0 0 4 14 0 18 112
08:00 0 9 3 0 12 0 2 1 1 4 0 0 5 2 7 0 0 1 4 5 28
08:15 0 4 4 0 8 0 0 0 0 0 0 0 7 0 7 0 1 0 3 4 19
08:30 0 3 5 0 8 0 0 1 0 1 0 0 4 1 5 0 0 1 3 4 18
08:45 0 2 10 0 12 0 0 1 0 1 0 0 5 0 5 0 0 0 2 2 20
Total 0 18 22 0 0 40 0 2 3 1 0 6 0 0 21 3 0 24 0 1 2 12 0 15 85
09:00 0 4 5 0 9 0 0 1 0 1 0 2 4 1 7 0 0 1 2 3 20
09:15 0 2 8 0 10 0 0 2 0 2 0 0 3 0 3 0 0 2 3 5 20
09:30 0 8 12 0 20 0 0 1 0 1 0 1 4 0 5 0 0 3 3 6 32
09:45 0 8 5 0 13 0 0 3 0 3 0 1 4 0 5 0 2 2 2 6 27
Total 0 22 30 0 0 52 0 0 7 0 0 7 0 4 15 1 0 20 0 2 8 10 0 20 99
10:00 0 2 6 0 8 0 0 0 0 0 0 0 0 1 1 0 2 0 7 9 18
10:15 0 9 4 0 13 0 0 1 0 1 0 2 7 1 10 0 0 2 3 5 29
10:30 0 8 9 0 17 0 0 1 0 1 0 2 4 1 7 0 0 2 3 5 30
10:45 0 4 4 0 8 0 0 1 1 2 0 0 2 0 2 0 0 1 2 3 15
Total 0 23 23 0 0 46 0 0 3 1 0 4 0 4 13 3 0 20 0 2 5 15 0 22 92
12:00 0 5 8 0 13 0 0 1 0 1 0 1 11 0 12 0 0 0 3 3 29
12:15 0 4 10 0 14 0 1 3 0 4 0 2 2 0 4 0 2 2 4 8 30
12:30 0 11 11 0 22 0 0 1 0 1 0 3 3 1 7 0 0 3 10 13 43
12:45 0 9 5 0 14 0 1 3 0 4 1 1 1 1 3 0 3 2 6 11 32
Total 0 29 34 0 0 63 0 2 8 0 0 10 1 7 17 2 0 26 0 5 7 23 0 35 134
13:00 0 3 7 0 10 0 1 0 0 1 0 3 7 3 13 0 1 1 6 8 32
13:15 0 2 4 0 6 0 0 2 0 2 0 0 1 0 1 0 1 0 1 2 11
Total 0 34 45 0 0 79 0 3 10 0 0 13 1 10 25 5 0 40 0 7 8 30 0 45 177
Grand
3 171 199 0 0 370 0 10 35 4 0 49 1 23 100 22 0 145 0 18 32 101 0 151 715
Total
Appr
46.2 53.8 0 0 20.4 71.4 8.2 0 15.9 69 15.2 0 11.9 21.2 66.9 0
%
Total
23.9 27.8 0 0 1.4 4.9 0.6 0 3.2 14 3.1 0 2.5 4.5 14.1 0
%
AM
11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45
Pk Hr
AM
33 36 0 0 69 2 7 0 0 9 7 20 2 0 29 3 6 22 0 31 138
Pk Vol
AM
0.635 0.818 NaN NaN 0.784 0.500 0.583 NaN NaN 0.563 0.583 0.455 0.500 NaN 0.604 0.375 0.500 0.550 NaN 0.596 0.802
PHF
Olde Eastwood Village Blvd Old Charlotte Hwy Olde Eastwood Village Blvd Old Charlotte Hwy
Southbound Westbound Northbound Eastbound
U- Appr U- Appr U- Appr Appr
Time Bikes Right Thru Left Bikes Right Thru Left Bikes Right Thru Left Bikes Right Thru Left U-Turn Int Total
Turn Total Turn Total Turn Total Total
06:00 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 1
06:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
06:30 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 1
06:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 1 0 0 0 0 0 0 2
07:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
07:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
07:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
07:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
08:00 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 2
08:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
08:30 0 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2
08:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 2 0 0 2 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 4
09:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
09:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
09:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
09:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1
10:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 1
12:00 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 1
12:15 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1
12:30 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 1
12:45 0 1 0 1 0 0 0 0 0 1 0 1 0 0 0 0 2
Total 0 0 1 0 0 1 0 0 0 0 0 0 0 1 2 0 0 3 0 1 0 0 0 1 5
13:00 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 1
13:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 1 0 0 1 0 0 0 0 0 0 0 2 2 0 0 4 0 1 0 0 0 1 6
Grand
0 0 4 0 0 4 0 0 1 0 0 1 0 2 5 0 0 7 0 1 0 1 0 2 14
Total
Appr
0 100 0 0 0 100 0 0 28.6 71.4 0 0 50 0 50 0
%
Total
0 28.6 0 0 0 7.1 0 0 14.3 35.7 0 0 7.1 0 7.1 0
%
AM
12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00 12:00
Pk Hr
AM
0 1 0 0 1 0 0 0 0 0 1 2 0 0 3 1 0 0 0 1 5
Pk Vol
AM
NaN 0.250 NaN NaN 0.250 NaN NaN NaN NaN NaN 0.250 0.500 NaN NaN 0.750 0.250 NaN NaN NaN 0.250 0.625
PHF
Olde Eastwood Village Blvd Old Charlotte Hwy Olde Eastwood Village Blvd Old Charlotte Hwy
Southbound Westbound Northbound Eastbound
U- Appr U- Appr U- Appr Appr
Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left U-Turn Int Total
Turn Total Turn Total Turn Total Total
06:00 3 1 0 0 4 0 0 0 0 0 0 2 0 0 2 1 0 0 0 1 7
06:15 5 3 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 3 0 3 11
06:30 2 7 0 0 9 0 1 0 0 1 0 2 0 0 2 1 1 1 0 3 15
06:45 2 6 0 0 8 0 0 0 0 0 0 0 0 0 0 2 0 0 0 2 10
Total 12 17 0 0 29 0 1 0 0 1 0 4 0 0 4 4 1 4 0 9 43
07:00 2 9 0 0 11 0 1 0 0 1 0 1 3 0 4 0 0 0 0 0 16
07:15 7 7 0 0 14 1 2 0 0 3 0 1 3 0 4 0 1 3 0 4 25
07:30 11 9 0 0 20 0 4 0 0 4 0 2 1 0 3 0 3 4 0 7 34
07:45 12 8 0 0 20 3 3 0 0 6 0 4 0 0 4 0 0 7 0 7 37
Total 32 33 0 0 65 4 10 0 0 14 0 8 7 0 15 0 4 14 0 18 112
08:00 9 3 0 0 12 2 1 1 0 4 0 7 2 0 9 0 1 4 0 5 30
08:15 4 4 0 0 8 0 0 0 0 0 0 7 0 0 7 1 0 3 0 4 19
08:30 3 7 0 0 10 0 1 0 0 1 0 4 1 0 5 0 1 3 0 4 20
08:45 2 10 0 0 12 0 1 0 0 1 0 5 0 0 5 0 0 2 0 2 20
Total 18 24 0 0 42 2 3 1 0 6 0 23 3 0 26 1 2 12 0 15 89
09:00 4 5 0 0 9 0 1 0 0 1 2 4 1 0 7 0 1 2 0 3 20
09:15 2 8 0 0 10 0 2 0 0 2 0 3 0 0 3 0 2 3 0 5 20
09:30 8 12 0 0 20 0 1 0 0 1 1 4 0 0 5 0 3 3 0 6 32
09:45 8 5 0 0 13 0 3 0 0 3 1 4 0 0 5 2 2 2 0 6 27
Total 22 30 0 0 52 0 7 0 0 7 4 15 1 0 20 2 8 10 0 20 99
10:00 2 6 0 0 8 0 0 0 0 0 0 0 1 0 1 2 0 7 0 9 18
10:15 9 4 0 0 13 0 1 0 0 1 2 7 1 0 10 0 2 4 0 6 30
10:30 8 9 0 0 17 0 1 0 0 1 2 4 1 0 7 0 2 3 0 5 30
10:45 4 4 0 0 8 0 1 1 0 2 0 2 0 0 2 0 1 2 0 3 15
Total 23 23 0 0 46 0 3 1 0 4 4 13 3 0 20 2 5 16 0 23 93
12:00 5 8 0 0 13 0 1 0 0 1 1 12 0 0 13 0 0 3 0 3 30
12:15 4 10 0 0 14 1 3 0 0 4 2 2 0 0 4 3 2 4 0 9 31
12:30 11 11 0 0 22 0 1 0 0 1 4 3 1 0 8 0 3 10 0 13 44
12:45 9 6 0 0 15 1 3 0 0 4 1 2 1 0 4 3 2 6 0 11 34
Total 29 35 0 0 64 2 8 0 0 10 8 19 2 0 29 6 7 23 0 36 139
13:00 3 7 0 0 10 1 0 0 0 1 4 7 3 0 14 1 1 6 0 8 33
13:15 2 4 0 0 6 0 2 0 0 2 0 1 0 0 1 1 0 1 0 2 11
Total 34 46 0 0 80 3 10 0 0 13 12 27 5 0 44 8 8 30 0 46 183
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
171 203 0 0 374 10 36 4 0 50 25 105 22 0 152 19 32 102 0 153 729
Total
Appr
45.7 54.3 00.0 00.0 20.0 72.0 08.0 00.0 16.4 69.1 14.5 00.0 12.4 20.9 66.7 00.0
%
Total
23.5 27.8 00.0 00.0 01.4 04.9 00.5 00.0 03.4 14.4 03.0 00.0 02.6 04.4 14.0 00.0
%
%
00.0 02.0 - - 01.1 00.0 02.8 00.0 - 02.0 08.0 04.8 00.0 - 04.6 05.3 00.0 01.0 - 01.3 01.9
Trucks
AM
11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45 11:45
Pk Hr
AM
33 36 0 0 69 2 7 0 0 9 8 21 2 0 31 4 6 22 0 32 141
Pk Vol
AM
0.635 0.818 NaN NaN 0.784 0.500 0.583 NaN NaN 0.563 0.500 0.438 0.500 NaN 0.596 0.333 0.500 0.550 NaN 0.615 0.801
PHF
171 203 0 0
Right
10
0
Out = 153
In = 57
Old Charlotte Hwy
Old Charlotte Hwy
Thru
Left
102
36
Total Volumes
06:00 to 13:30
Volume = 729
Thru
Left
32
Out = 50
In = 229
U-Turn
Right
19
0
U-Turn Left Thru Right
0 22 105 25
33 36 0 0
Right
2
0
Thru
Left
22
7
AM Peak Hour Begins: 11:45
AM Peak Hour Volume: 141
Thru
Left
AM Peak Hour Factor: 0.801
0
6
U-Turn
Right
0
4
0 2 21 8
500
Vehicles
450
400
350
300
250
200
150
100
50
0
06:00 07:00 08:00 09:00 10:00 11:00 12:00 01:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
06:00 07:00 08:00 09:00 10:00 11:00 12:00 01:00
Time
Olde Eastwood Village Blvd Old Charlotte Hwy Olde Eastwood Village Blvd Old Charlotte Hwy
Southbound Westbound Northbound Eastbound
U- Appr U- Appr U- Appr Appr
Time Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left U-Turn Int Total
Turn Total Turn Total Turn Total Total
14:30 0 6 14 0 20 1 0 0 0 0 0 3 7 0 10 0 1 1 7 9 39
14:45 0 6 5 0 11 0 0 1 0 1 0 1 7 1 9 0 1 3 10 14 35
Total 0 12 19 0 0 31 1 0 1 0 0 1 0 4 14 1 0 19 0 2 4 17 0 23 74
15:00 0 9 6 0 15 0 0 2 0 2 0 0 6 1 7 0 0 2 6 8 32
15:15 0 7 6 1 14 0 0 1 0 1 0 1 1 2 4 0 2 0 10 12 31
15:30 0 7 10 2 19 0 0 2 0 2 1 2 8 2 12 0 0 3 9 12 45
15:45 2 9 8 0 17 0 1 1 0 2 0 1 7 0 8 0 0 1 3 4 31
Total 2 32 30 3 0 65 0 1 6 0 0 7 1 4 22 5 0 31 0 2 6 28 0 36 139
16:00 0 4 6 1 11 0 2 2 0 4 0 0 6 1 7 0 0 1 6 7 29
16:15 0 7 5 0 12 0 2 1 1 4 0 4 5 3 12 0 2 0 6 8 36
16:30 0 5 7 0 12 0 0 1 0 1 0 2 9 1 12 0 1 3 9 13 38
16:45 0 5 11 0 16 0 0 3 0 3 0 2 7 4 13 0 1 3 6 10 42
Total 0 21 29 1 0 51 0 4 7 1 0 12 0 8 27 9 0 44 0 4 7 27 0 38 145
17:00 0 12 13 1 26 0 0 0 0 0 0 0 7 4 11 0 0 2 4 6 43
17:15 0 6 7 1 14 0 0 0 0 0 0 0 10 3 13 0 1 1 7 9 36
17:30 0 2 5 0 7 0 0 0 0 0 0 0 12 1 13 0 1 1 15 17 37
17:45 0 5 8 0 13 0 0 2 0 2 0 0 9 3 12 0 1 4 12 17 44
Total 0 25 33 2 0 60 0 0 2 0 0 2 0 0 38 11 0 49 0 3 8 38 0 49 160
18:00 1 6 8 0 14 0 0 0 0 0 0 1 6 1 8 0 0 0 9 9 31
18:15 0 8 7 0 15 0 0 1 0 1 0 0 8 1 9 0 0 0 10 10 35
18:30 0 4 7 0 11 0 1 1 0 2 0 0 10 3 13 0 1 1 17 19 45
18:45 0 3 5 1 9 0 0 1 0 1 0 0 15 2 17 0 1 0 7 8 35
Total 1 21 27 1 0 49 0 1 3 0 0 4 0 1 39 7 0 47 0 2 1 43 0 46 146
PM
17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00
Pk Hr
PM
25 33 2 0 60 0 2 0 0 2 0 38 11 0 49 3 8 38 0 49 160
Pk Vol
PM
0.521 0.635 0.500 NaN 0.577 NaN 0.250 NaN NaN 0.250 NaN 0.792 0.688 NaN 0.942 0.750 0.500 0.633 NaN 0.721 0.889
PHF
Olde Eastwood Village Blvd Old Charlotte Hwy Olde Eastwood Village Blvd Old Charlotte Hwy
Southbound Westbound Northbound Eastbound
U- Appr U- Appr U- Appr Appr
Time Bikes Right Thru Left Bikes Right Thru Left Bikes Right Thru Left Bikes Right Thru Left U-Turn Int Total
Turn Total Turn Total Turn Total Total
14:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15:45 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 1
Total 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
16:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
16:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
16:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PM
15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45 15:45
Pk Hr
PM
0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1
Pk Vol
PM
NaN NaN NaN NaN NaN NaN 0.250 NaN NaN 0.250 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 0.250
PHF
Olde Eastwood Village Blvd Old Charlotte Hwy Olde Eastwood Village Blvd Old Charlotte Hwy
Southbound Westbound Northbound Eastbound
U- Appr U- Appr U- Appr Appr
Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left U-Turn Int Total
Turn Total Turn Total Turn Total Total
14:30 6 14 0 0 20 0 0 0 0 0 3 7 0 0 10 1 1 7 0 9 39
14:45 6 5 0 0 11 0 1 0 0 1 1 7 1 0 9 1 3 10 0 14 35
Total 12 19 0 0 31 0 1 0 0 1 4 14 1 0 19 2 4 17 0 23 74
15:00 9 6 0 0 15 0 2 0 0 2 0 6 1 0 7 0 2 6 0 8 32
15:15 7 6 1 0 14 0 1 0 0 1 1 1 2 0 4 2 0 10 0 12 31
15:30 7 10 2 0 19 0 2 0 0 2 2 8 2 0 12 0 3 9 0 12 45
15:45 9 8 0 0 17 1 2 0 0 3 1 7 0 0 8 0 1 3 0 4 32
Total 32 30 3 0 65 1 7 0 0 8 4 22 5 0 31 2 6 28 0 36 140
16:00 4 6 1 0 11 2 2 0 0 4 0 6 1 0 7 0 1 6 0 7 29
16:15 7 5 0 0 12 2 1 1 0 4 4 5 3 0 12 2 0 6 0 8 36
16:30 5 7 0 0 12 0 1 0 0 1 2 9 1 0 12 1 3 9 0 13 38
16:45 5 11 0 0 16 0 3 0 0 3 2 7 4 0 13 1 3 6 0 10 42
Total 21 29 1 0 51 4 7 1 0 12 8 27 9 0 44 4 7 27 0 38 145
17:00 12 13 1 0 26 0 0 0 0 0 0 7 4 0 11 0 2 4 0 6 43
17:15 6 7 1 0 14 0 0 0 0 0 0 10 3 0 13 1 1 7 0 9 36
17:30 2 5 0 0 7 0 0 0 0 0 0 12 1 0 13 1 1 15 0 17 37
17:45 5 8 0 0 13 0 2 0 0 2 0 9 3 0 12 1 4 12 0 17 44
Total 25 33 2 0 60 0 2 0 0 2 0 38 11 0 49 3 8 38 0 49 160
18:00 6 8 0 0 14 0 0 0 0 0 1 6 1 0 8 0 0 9 0 9 31
18:15 8 7 0 0 15 0 1 0 0 1 0 8 1 0 9 0 0 10 0 10 35
18:30 4 7 0 0 11 1 1 0 0 2 0 10 3 0 13 1 1 17 0 19 45
18:45 3 5 1 0 9 0 1 0 0 1 0 15 2 0 17 1 0 7 0 8 35
Total 21 27 1 0 49 1 3 0 0 4 1 39 7 0 47 2 1 43 0 46 146
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand
111 138 7 0 256 6 20 1 0 27 17 140 33 0 190 13 26 153 0 192 665
Total
COUNTpro Turning Movement Report: Page 5 of 10 CountingCars.com
Olde Eastwood Village Blvd Old Charlotte Hwy Olde Eastwood Village Blvd Old Charlotte Hwy
Southbound Westbound Northbound Eastbound
U- Appr U- Appr U- Appr Appr
Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left U-Turn Int Total
Turn Total Turn Total Turn Total Total
Appr
43.4 53.9 02.7 00.0 22.2 74.1 03.7 00.0 08.9 73.7 17.4 00.0 06.8 13.5 79.7 00.0
%
Total
16.7 20.8 01.1 00.0 00.9 03.0 00.2 00.0 02.6 21.1 05.0 00.0 02.0 03.9 23.0 00.0
%
%
00.0 00.0 00.0 - 00.0 00.0 05.0 00.0 - 03.7 00.0 00.0 00.0 - 00.0 00.0 00.0 00.0 - 00.0 00.2
Trucks
PM
17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00 17:00
Pk Hr
PM
25 33 2 0 60 0 2 0 0 2 0 38 11 0 49 3 8 38 0 49 160
Pk Vol
PM
0.521 0.635 0.500 NaN 0.577 NaN 0.250 NaN NaN 0.250 NaN 0.792 0.688 NaN 0.942 0.750 0.500 0.633 NaN 0.721 0.889
PHF
111 138 7 0
Right
6
0
Out = 192
In = 50
Old Charlotte Hwy
Old Charlotte Hwy
Thru
Left
153
20
Total Volumes
14:30 to 19:00
Volume = 665
Thru
Left
26
Out = 27
In = 164
U-Turn
Right
13
0
U-Turn Left Thru Right
0 33 140 17
25 33 2 0
Right
0
0
Thru
Left
38
2
PM Peak Hour Begins: 17:00
PM Peak Hour Volume: 160
Thru
Left
PM Peak Hour Factor: 0.889
0
8
U-Turn
Right
0
3
0 11 38 0
500
Vehicles
450
400
350
300
250
200
150
100
50
0
03:00 04:00 05:00 06:00 07:00
Time
100
Vehicles
90
80
70
60
50
40
30
20
10
0
03:00 04:00 05:00 06:00 07:00
Time
Appendix B: Capacity Software Reports
Lanes, Volumes, Timings
1: Rocket Drive/Cedar Ridge Dr & US 74 08/25/2022
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 41 603 183 208 1429 10 212 26 106 14 34 85
Future Volume (vph) 41 603 183 208 1429 10 212 26 106 14 34 85
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 110 0 195 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.947 0.999 0.896 0.929
Flt Protected 0.950 0.950 0.950 0.996
Satd. Flow (prot) 1770 3352 0 1770 3536 0 1770 1669 0 0 1724 0
Flt Permitted 0.950 0.950 0.950 0.996
Satd. Flow (perm) 1770 3352 0 1770 3536 0 1770 1669 0 0 1724 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 1031 413 774 1023
Travel Time (s) 15.6 6.3 17.6 23.3
Peak Hour Factor 0.90 0.90 0.50 0.50 0.90 0.90 0.50 0.50 0.90 0.90 0.50 0.90
Adj. Flow (vph) 46 670 366 416 1588 11 424 52 118 16 68 94
Shared Lane Traffic (%)
Lane Group Flow (vph) 46 1036 0 416 1599 0 424 170 0 0 178 0
Turn Type Prot NA Prot NA Split NA Split NA
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases
Detector Phase 5 2 1 6 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0
Total Split (s) 14.0 56.0 41.0 83.0 42.0 42.0 21.0 21.0
Total Split (%) 8.8% 35.0% 25.6% 51.9% 26.3% 26.3% 13.1% 13.1%
Maximum Green (s) 7.0 49.0 34.0 76.0 35.0 35.0 14.0 14.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None
Act Effct Green (s) 9.0 51.0 36.0 80.8 37.0 37.0 16.0
Actuated g/C Ratio 0.06 0.32 0.22 0.50 0.23 0.23 0.10
v/c Ratio 0.46 0.97 1.05 0.90 1.04 0.44 1.03
Control Delay 88.8 74.5 105.9 37.3 112.6 56.9 145.4
Queue Delay 0.0 0.0 21.0 9.9 0.0 0.0 0.0
Total Delay 88.8 74.5 127.0 47.1 112.6 56.9 145.4
LOS F E F D F E F
Approach Delay 75.1 63.6 96.6 145.4
Approach LOS E E F F
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 48 564 ~471 819 ~475 154 ~199
Queue Length 95th (ft) 94 #711 249 936 285 120 147
Internal Link Dist (ft) 951 333 694 943
Turn Bay Length (ft) 110 195
Base Capacity (vph) 99 1068 398 1785 409 385 172
Starvation Cap Reductn 0 0 58 186 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.46 0.97 1.22 1.00 1.04 0.44 1.03
Intersection Summary
Area Type: Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green, Master Intersection
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.05
Intersection Signal Delay: 75.6 Intersection LOS: E
Intersection Capacity Utilization 78.0% ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 29 639 55 15 1585 5 28 3 22 12 4 34
Future Volume (vph) 29 639 55 15 1585 5 28 3 22 12 4 34
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 125 0 150 0 0 0 0 0
Storage Lanes 1 0 1 0 0 1 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.988 0.999 0.850 0.907
Flt Protected 0.950 0.950 0.956 0.988
Satd. Flow (prot) 1770 3497 0 1770 3536 0 0 1781 1583 0 1669 0
Flt Permitted 0.950 0.950 0.659 0.908
Satd. Flow (perm) 1770 3497 0 1770 3536 0 0 1228 1583 0 1534 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 413 428 1012 510
Travel Time (s) 6.3 6.5 23.0 11.6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 32 710 61 17 1761 6 31 3 24 13 4 38
Shared Lane Traffic (%)
Lane Group Flow (vph) 32 771 0 17 1767 0 0 34 24 0 55 0
Turn Type Prot NA Prot NA Perm NA Perm Perm NA
Protected Phases 5 2 1 6 8 4
Permitted Phases 8 8 4
Detector Phase 5 2 1 6 8 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0 14.0
Total Split (s) 16.0 125.0 16.0 125.0 19.0 19.0 19.0 19.0 19.0
Total Split (%) 10.0% 78.1% 10.0% 78.1% 11.9% 11.9% 11.9% 11.9% 11.9%
Maximum Green (s) 9.0 118.0 9.0 118.0 12.0 12.0 12.0 12.0 12.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None None
Act Effct Green (s) 10.1 132.1 10.1 129.3 12.2 12.2 12.2
Actuated g/C Ratio 0.06 0.83 0.06 0.81 0.08 0.08 0.08
v/c Ratio 0.29 0.27 0.15 0.62 0.37 0.20 0.47
Control Delay 51.7 1.4 73.8 9.1 80.6 72.4 84.6
Queue Delay 0.0 0.3 0.0 0.8 0.0 0.0 0.0
Total Delay 51.7 1.7 73.8 9.9 80.6 72.4 84.6
LOS D A E A F E F
Approach Delay 3.7 10.5 77.2 84.6
Approach LOS A B E F
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 35 54 17 417 34 24 56
Queue Length 95th (ft) m42 m45 45 502 73 56 106
Internal Link Dist (ft) 333 348 932 430
Turn Bay Length (ft) 125 150
Base Capacity (vph) 121 2887 121 2857 107 138 134
Starvation Cap Reductn 0 1394 0 0 0 0 0
Spillback Cap Reductn 0 0 0 681 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.26 0.52 0.14 0.81 0.32 0.17 0.41
Intersection Summary
Area Type: Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 98 (61%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.62
Intersection Signal Delay: 11.4 Intersection LOS: B
Intersection Capacity Utilization 61.9% ICU Level of Service B
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Intersection
Int Delay, s/veh 6.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 6 654 13 4 1556 13 43 4 8 4 4 6
Future Vol, veh/h 6 654 13 4 1556 13 43 4 8 4 4 6
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 100 - 100 100 - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 7 727 14 4 1729 14 48 4 9 4 4 7
Approach EB WB NB SB
HCM Control Delay, s 0.1 0 227.5 134.4
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 61 357 - - 862 - - 42
HCM Lane V/C Ratio 1.002 0.019 - - 0.005 - - 0.37
HCM Control Delay (s) 227.5 15.3 - - 9.2 - - 134.4
HCM Lane LOS F C - - A - - F
HCM 95th %tile Q(veh) 4.8 0.1 - - 0 - - 1.3
Intersection
Int Delay, s/veh 7.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 22 6 4 4 7 4 4 21 8 4 36 33
Future Vol, veh/h 22 6 4 4 7 4 4 21 8 4 36 33
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 24 7 4 4 8 4 4 23 9 4 40 37
Approach EB WB NB SB
HCM Control Delay, s 5 1.9 9.4 9.4
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 850 1607 - - 1608 - - 906
HCM Lane V/C Ratio 0.043 0.015 - - 0.003 - - 0.09
HCM Control Delay (s) 9.4 7.3 0 - 7.2 0 - 9.4
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0.3
Intersection
Int Delay, s/veh 4.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 4 12 7 5 6
Future Vol, veh/h 4 4 12 7 5 6
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 4 13 8 6 7
Approach EB NB SB
HCM Control Delay, s 8.6 4.6 0
HCM LOS A
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 48 1533 54 53 909 7 52 4 55 19 6 33
Future Volume (vph) 48 1533 54 53 909 7 52 4 55 19 6 33
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 110 0 195 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.995 0.999 0.859 0.923
Flt Protected 0.950 0.950 0.950 0.984
Satd. Flow (prot) 1770 3522 0 1770 3536 0 1770 1600 0 0 1692 0
Flt Permitted 0.950 0.950 0.950 0.984
Satd. Flow (perm) 1770 3522 0 1770 3536 0 1770 1600 0 0 1692 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 1031 413 774 1023
Travel Time (s) 15.6 6.3 17.6 23.3
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 53 1703 60 59 1010 8 58 4 61 21 7 37
Shared Lane Traffic (%)
Lane Group Flow (vph) 53 1763 0 59 1018 0 58 65 0 0 65 0
Turn Type Prot NA Prot NA Split NA Split NA
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases
Detector Phase 5 2 1 6 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0
Total Split (s) 14.0 78.0 14.0 78.0 14.0 14.0 14.0 14.0
Total Split (%) 11.7% 65.0% 11.7% 65.0% 11.7% 11.7% 11.7% 11.7%
Maximum Green (s) 7.0 71.0 7.0 71.0 7.0 7.0 7.0 7.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None
Act Effct Green (s) 9.0 82.4 9.0 82.4 9.0 9.0 9.0
Actuated g/C Ratio 0.08 0.69 0.08 0.69 0.08 0.08 0.08
v/c Ratio 0.40 0.73 0.45 0.42 0.44 0.54 0.52
Control Delay 62.5 18.3 61.1 11.5 64.1 70.8 68.4
Queue Delay 0.0 0.0 0.0 0.8 0.0 0.0 0.0
Total Delay 62.5 18.3 61.1 12.3 64.1 70.8 68.4
LOS E B E B E E E
Approach Delay 19.6 14.9 67.6 68.4
Approach LOS B B E E
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 40 529 39 248 44 50 49
Queue Length 95th (ft) 83 637 83 304 89 #103 98
Internal Link Dist (ft) 951 333 694 943
Turn Bay Length (ft) 110 195
Base Capacity (vph) 132 2418 132 2428 132 120 126
Starvation Cap Reductn 0 0 0 995 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.40 0.73 0.45 0.71 0.44 0.54 0.52
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green, Master Intersection
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.73
Intersection Signal Delay: 20.9 Intersection LOS: C
Intersection Capacity Utilization 62.5% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 61 1406 140 71 6 110 71 6 110 25 5 40
Future Volume (vph) 61 1406 140 71 6 110 71 6 110 25 5 40
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 125 0 150 0 0 0 0 0
Storage Lanes 1 0 1 0 0 1 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.986 0.858 0.850 0.924
Flt Protected 0.950 0.950 0.956 0.982
Satd. Flow (prot) 1770 3490 0 1770 3037 0 0 1781 1583 0 1690 0
Flt Permitted 0.950 0.950 0.676 0.854
Satd. Flow (perm) 1770 3490 0 1770 3037 0 0 1259 1583 0 1470 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 413 428 1012 510
Travel Time (s) 6.3 6.5 23.0 11.6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 68 1562 156 79 7 122 79 7 122 28 6 44
Shared Lane Traffic (%)
Lane Group Flow (vph) 68 1718 0 79 129 0 0 86 122 0 78 0
Turn Type Prot NA Prot NA Perm NA Perm Perm NA
Protected Phases 5 2 1 6 8 4
Permitted Phases 8 8 4
Detector Phase 5 2 1 6 8 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0 14.0
Total Split (s) 15.0 82.0 16.0 83.0 22.0 22.0 22.0 22.0 22.0
Total Split (%) 12.5% 68.3% 13.3% 69.2% 18.3% 18.3% 18.3% 18.3% 18.3%
Maximum Green (s) 8.0 75.0 9.0 76.0 15.0 15.0 15.0 15.0 15.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None None
Act Effct Green (s) 9.8 82.1 10.6 82.9 15.1 15.1 15.1
Actuated g/C Ratio 0.08 0.68 0.09 0.69 0.13 0.13 0.13
v/c Ratio 0.47 0.72 0.51 0.06 0.54 0.62 0.42
Control Delay 57.8 3.1 63.9 7.2 62.1 63.0 55.4
Queue Delay 0.0 0.1 0.0 0.0 0.0 0.0 0.0
Total Delay 57.8 3.2 63.9 7.2 62.1 63.0 55.4
LOS E A E A E E E
Approach Delay 5.3 28.7 62.6 55.4
Approach LOS A C E E
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 56 36 59 17 63 90 56
Queue Length 95th (ft) m78 40 111 29 117 154 m106
Internal Link Dist (ft) 333 348 932 430
Turn Bay Length (ft) 125 150
Base Capacity (vph) 147 2388 162 2099 178 224 208
Starvation Cap Reductn 0 90 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.46 0.75 0.49 0.06 0.48 0.54 0.38
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 2 (2%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.72
Intersection Signal Delay: 14.3 Intersection LOS: B
Intersection Capacity Utilization 72.4% ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Intersection
Int Delay, s/veh 11.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 11 1472 58 4 870 8 28 4 8 4 4 10
Future Vol, veh/h 11 1472 58 4 870 8 28 4 8 4 4 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 100 - 100 100 - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 12 1636 64 4 967 9 31 4 9 4 4 11
Approach EB WB NB SB
HCM Control Delay, s 0.1 0.1 $ 666.4 101.4
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 26 703 - - 371 - - 56
HCM Lane V/C Ratio 1.709 0.017 - - 0.012 - - 0.357
HCM Control Delay (s) $ 666.4 10.2 - - 14.8 - - 101.4
HCM Lane LOS F B - - B - - F
HCM 95th %tile Q(veh) 5.4 0.1 - - 0 - - 1.3
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Intersection
Int Delay, s/veh 8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 38 8 4 4 4 4 11 38 4 4 33 25
Future Vol, veh/h 38 8 4 4 4 4 11 38 4 4 33 25
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 42 9 4 4 4 4 12 42 4 4 37 28
Approach EB WB NB SB
HCM Control Delay, s 5.5 2.4 10 9.5
HCM LOS B A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 774 1612 - - 1606 - - 861
HCM Lane V/C Ratio 0.076 0.026 - - 0.003 - - 0.08
HCM Control Delay (s) 10 7.3 0 - 7.2 0 - 9.5
HCM Lane LOS B A A - A A - A
HCM 95th %tile Q(veh) 0.2 0.1 - - 0 - - 0.3
Intersection
Int Delay, s/veh 4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 5 12 7 9 4
Future Vol, veh/h 4 5 12 7 9 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 6 13 8 10 4
Approach EB NB SB
HCM Control Delay, s 8.6 4.6 0
HCM LOS A
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 43 627 190 216 1487 10 221 27 110 15 35 88
Future Volume (vph) 43 627 190 216 1487 10 221 27 110 15 35 88
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 110 0 195 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.947 0.999 0.880 0.928
Flt Protected 0.950 0.950 0.950 0.995
Satd. Flow (prot) 1770 3352 0 1770 3536 0 1770 1639 0 0 1720 0
Flt Permitted 0.950 0.950 0.950 0.995
Satd. Flow (perm) 1770 3352 0 1770 3536 0 1770 1639 0 0 1720 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 1031 413 774 1023
Travel Time (s) 15.6 6.3 17.6 23.3
Peak Hour Factor 0.90 0.90 0.50 0.50 0.90 0.90 0.50 0.50 0.50 0.90 0.50 0.90
Adj. Flow (vph) 48 697 380 432 1652 11 442 54 220 17 70 98
Shared Lane Traffic (%)
Lane Group Flow (vph) 48 1077 0 432 1663 0 442 274 0 0 185 0
Turn Type Prot NA Prot NA Split NA Split NA
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases
Detector Phase 5 2 1 6 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0
Total Split (s) 14.0 59.0 44.0 89.0 45.0 45.0 22.0 22.0
Total Split (%) 8.2% 34.7% 25.9% 52.4% 26.5% 26.5% 12.9% 12.9%
Maximum Green (s) 7.0 52.0 37.0 82.0 38.0 38.0 15.0 15.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None
Act Effct Green (s) 9.0 54.0 39.0 86.8 40.0 40.0 17.0
Actuated g/C Ratio 0.05 0.32 0.23 0.51 0.24 0.24 0.10
v/c Ratio 0.52 1.01 1.06 0.92 1.06 0.71 1.08
Control Delay 98.1 87.0 113.3 41.1 121.5 71.2 158.3
Queue Delay 0.0 0.0 15.2 18.3 0.0 0.0 0.0
Total Delay 98.1 87.0 128.5 59.3 121.5 71.2 158.3
LOS F F F E F E F
Approach Delay 87.5 73.6 102.2 158.3
Approach LOS F E F F
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 53 ~648 ~531 926 ~539 283 ~228
Queue Length 95th (ft) 102 #802 276 #1097 312 196 161
Internal Link Dist (ft) 951 333 694 943
Turn Bay Length (ft) 110 195
Base Capacity (vph) 93 1064 406 1805 416 385 172
Starvation Cap Reductn 0 0 72 193 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.52 1.01 1.29 1.03 1.06 0.71 1.08
Intersection Summary
Area Type: Other
Cycle Length: 170
Actuated Cycle Length: 170
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green, Master Intersection
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.08
Intersection Signal Delay: 86.2 Intersection LOS: F
Intersection Capacity Utilization 84.2% ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 30 665 57 16 1649 5 29 4 23 12 4 35
Future Volume (vph) 30 665 57 16 1649 5 29 4 23 12 4 35
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 125 0 150 0 0 0 0 0
Storage Lanes 1 0 1 0 0 1 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.988 0.850 0.906
Flt Protected 0.950 0.950 0.957 0.989
Satd. Flow (prot) 1770 3497 0 1770 3539 0 0 1783 1583 0 1669 0
Flt Permitted 0.950 0.950 0.639 0.909
Satd. Flow (perm) 1770 3497 0 1770 3539 0 0 1190 1583 0 1534 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 413 428 1012 510
Travel Time (s) 6.3 6.5 23.0 11.6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 33 739 63 18 1832 6 32 4 26 13 4 39
Shared Lane Traffic (%)
Lane Group Flow (vph) 33 802 0 18 1838 0 0 36 26 0 56 0
Turn Type Prot NA Prot NA Perm NA pm+ov Perm NA
Protected Phases 5 2 1 6 8 1 4
Permitted Phases 8 8 4
Detector Phase 5 2 1 6 8 8 1 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0 14.0
Total Split (s) 16.0 134.0 16.0 134.0 20.0 20.0 16.0 20.0 20.0
Total Split (%) 9.4% 78.8% 9.4% 78.8% 11.8% 11.8% 9.4% 11.8% 11.8%
Maximum Green (s) 9.0 127.0 9.0 127.0 13.0 13.0 9.0 13.0 13.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None None
Act Effct Green (s) 10.2 138.6 10.2 138.6 12.8 25.2 12.8
Actuated g/C Ratio 0.06 0.82 0.06 0.82 0.08 0.15 0.08
v/c Ratio 0.31 0.28 0.17 0.64 0.40 0.11 0.49
Control Delay 65.3 2.0 79.4 9.4 87.5 60.0 90.2
Queue Delay 0.0 0.6 0.0 0.9 0.7 0.0 0.7
Total Delay 65.3 2.6 79.4 10.3 88.2 60.0 91.0
LOS E A E B F E F
Approach Delay 5.1 11.0 76.4 91.0
Approach LOS A B E F
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 39 80 19 463 39 25 61
Queue Length 95th (ft) m42 m64 49 554 80 57 112
Internal Link Dist (ft) 333 348 932 430
Turn Bay Length (ft) 125 150
Base Capacity (vph) 114 2851 114 2886 105 223 135
Starvation Cap Reductn 0 1532 0 0 0 0 0
Spillback Cap Reductn 0 0 0 690 9 0 11
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.29 0.61 0.16 0.84 0.38 0.12 0.45
Intersection Summary
Area Type: Other
Cycle Length: 170
Actuated Cycle Length: 170
Offset: 106 (62%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.64
Intersection Signal Delay: 12.3 Intersection LOS: B
Intersection Capacity Utilization 63.8% ICU Level of Service B
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Intersection
Int Delay, s/veh 8.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 6 681 14 4 1619 14 45 4 8 4 4 6
Future Vol, veh/h 6 681 14 4 1619 14 45 4 8 4 4 6
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 100 - 100 100 - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 7 757 16 4 1799 16 50 4 9 4 4 7
Approach EB WB NB SB
HCM Control Delay, s 0.1 0 $ 302.1 173.1
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 54 334 - - 838 - - 35
HCM Lane V/C Ratio 1.173 0.02 - - 0.005 - - 0.444
HCM Control Delay (s) $ 302.1 16 - - 9.3 - - 173.1
HCM Lane LOS F C - - A - - F
HCM 95th %tile Q(veh) 5.5 0.1 - - 0 - - 1.5
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Intersection
Int Delay, s/veh 7.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 23 6 4 4 7 4 4 22 8 4 37 34
Future Vol, veh/h 23 6 4 4 7 4 4 22 8 4 37 34
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 26 7 4 4 8 4 4 24 9 4 41 38
Approach EB WB NB SB
HCM Control Delay, s 5.1 1.9 9.5 9.4
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 844 1607 - - 1608 - - 903
HCM Lane V/C Ratio 0.045 0.016 - - 0.003 - - 0.092
HCM Control Delay (s) 9.5 7.3 0 - 7.2 0 - 9.4
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0.3
Intersection
Int Delay, s/veh 3.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 4 12 7 9 4
Future Vol, veh/h 4 4 12 7 9 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 4 13 8 10 4
Approach EB NB SB
HCM Control Delay, s 8.6 4.6 0
HCM LOS A
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 50 1595 56 55 946 7 54 4 57 20 6 34
Future Volume (vph) 50 1595 56 55 946 7 54 4 57 20 6 34
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 110 0 195 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.995 0.999 0.859 0.923
Flt Protected 0.950 0.950 0.950 0.984
Satd. Flow (prot) 1770 3522 0 1770 3536 0 1770 1600 0 0 1692 0
Flt Permitted 0.950 0.950 0.950 0.984
Satd. Flow (perm) 1770 3522 0 1770 3536 0 1770 1600 0 0 1692 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 1031 413 774 1023
Travel Time (s) 15.6 6.3 17.6 23.3
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 56 1772 62 61 1051 8 60 4 63 22 7 38
Shared Lane Traffic (%)
Lane Group Flow (vph) 56 1834 0 61 1059 0 60 67 0 0 67 0
Turn Type Prot NA Prot NA Split NA Split NA
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases
Detector Phase 5 2 1 6 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0
Total Split (s) 14.0 88.0 14.0 88.0 14.0 14.0 14.0 14.0
Total Split (%) 10.8% 67.7% 10.8% 67.7% 10.8% 10.8% 10.8% 10.8%
Maximum Green (s) 7.0 81.0 7.0 81.0 7.0 7.0 7.0 7.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None
Act Effct Green (s) 9.0 88.6 9.0 88.6 9.0 9.0 9.0
Actuated g/C Ratio 0.07 0.68 0.07 0.68 0.07 0.07 0.07
v/c Ratio 0.46 0.76 0.50 0.44 0.49 0.61 0.57
Control Delay 70.8 18.4 70.9 5.0 72.5 82.0 78.1
Queue Delay 0.0 0.0 0.0 0.1 0.0 0.0 0.0
Total Delay 70.8 18.4 70.9 5.1 72.5 82.0 78.1
LOS E B E A E F E
Approach Delay 20.0 8.7 77.5 78.1
Approach LOS B A E E
Scenario 1 Gannett Flemming 8:56 pm 08/16/2022 2026 Background PM Peak Synchro 11 Report
Jeffrey H. Moore Page 1
Lanes, Volumes, Timings
1: Rocket Drive/Cedar Ridge Dr & US 74 08/28/2022
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 46 573 53 93 50 56 56
Queue Length 95th (ft) 93 681 103 105 97 #120 #115
Internal Link Dist (ft) 951 333 694 943
Turn Bay Length (ft) 110 195
Base Capacity (vph) 122 2400 122 2409 122 110 117
Starvation Cap Reductn 0 0 0 305 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.46 0.76 0.50 0.50 0.49 0.61 0.57
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green, Master Intersection
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.76
Intersection Signal Delay: 19.5 Intersection LOS: B
Intersection Capacity Utilization 64.4% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Scenario 1 Gannett Flemming 8:56 pm 08/16/2022 2026 Background PM Peak Synchro 11 Report
Jeffrey H. Moore Page 2
Lanes, Volumes, Timings
2: Ingle's/Old Charlotte Hwy & US 74 08/28/2022
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 63 1463 146 47 893 5 74 6 114 26 5 42
Future Volume (vph) 63 1463 146 47 893 5 74 6 114 26 5 42
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 125 0 150 0 0 0 0 0
Storage Lanes 1 0 1 0 0 1 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.986 0.999 0.850 0.923
Flt Protected 0.950 0.950 0.956 0.983
Satd. Flow (prot) 1770 3490 0 1770 3536 0 0 1781 1583 0 1690 0
Flt Permitted 0.950 0.950 0.650 0.856
Satd. Flow (perm) 1770 3490 0 1770 3536 0 0 1211 1583 0 1472 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 413 428 1012 510
Travel Time (s) 6.3 6.5 23.0 11.6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 70 1626 162 52 992 6 82 7 127 29 6 47
Shared Lane Traffic (%)
Lane Group Flow (vph) 70 1788 0 52 998 0 0 89 127 0 82 0
Turn Type Prot NA Prot NA Perm NA Perm Perm NA
Protected Phases 5 2 1 6 8 4
Permitted Phases 8 8 4
Detector Phase 5 2 1 6 8 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0 14.0
Total Split (s) 16.0 92.0 14.0 90.0 24.0 24.0 24.0 24.0 24.0
Total Split (%) 12.3% 70.8% 10.8% 69.2% 18.5% 18.5% 18.5% 18.5% 18.5%
Maximum Green (s) 9.0 85.0 7.0 83.0 17.0 17.0 17.0 17.0 17.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None None
Act Effct Green (s) 10.6 92.3 9.0 90.7 16.5 16.5 16.5
Actuated g/C Ratio 0.08 0.71 0.07 0.70 0.13 0.13 0.13
v/c Ratio 0.49 0.72 0.43 0.40 0.58 0.63 0.44
Control Delay 62.2 2.0 69.3 9.8 68.4 67.9 59.4
Queue Delay 0.0 0.1 0.0 0.0 0.0 0.0 0.0
Total Delay 62.2 2.2 69.3 9.8 68.4 67.9 59.4
LOS E A E A E E E
Approach Delay 4.4 12.8 68.1 59.4
Approach LOS A B E E
Scenario 1 Gannett Flemming 8:56 pm 08/16/2022 2026 Background PM Peak Synchro 11 Report
Jeffrey H. Moore Page 1
Lanes, Volumes, Timings
2: Ingle's/Old Charlotte Hwy & US 74 08/28/2022
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 63 40 43 191 71 102 64
Queue Length 95th (ft) m83 35 87 241 129 170 m117
Internal Link Dist (ft) 333 348 932 430
Turn Bay Length (ft) 125 150
Base Capacity (vph) 149 2477 122 2467 176 231 215
Starvation Cap Reductn 0 100 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.47 0.75 0.43 0.40 0.51 0.55 0.38
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 2 (2%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.72
Intersection Signal Delay: 12.8 Intersection LOS: B
Intersection Capacity Utilization 71.6% ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Scenario 1 Gannett Flemming 8:56 pm 08/16/2022 2026 Background PM Peak Synchro 11 Report
Jeffrey H. Moore Page 2
HCM 6th TWSC
3: Beech Ridge Trl/June Sayles Rd & US 74 08/30/2022
Intersection
Int Delay, s/veh 14.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 11 1532 60 4 905 8 29 4 8 4 4 10
Future Vol, veh/h 11 1532 60 4 905 8 29 4 8 4 4 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 100 - 100 100 - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 12 1702 67 4 1006 9 32 4 9 4 4 11
Approach EB WB NB SB
HCM Control Delay, s 0.1 0.1 $ 868.4 125.6
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 22 679 - - 348 - - 48
HCM Lane V/C Ratio 2.071 0.018 - - 0.013 - - 0.417
HCM Control Delay (s) $ 868.4 10.4 - - 15.5 - - 125.6
HCM Lane LOS F B - - C - - F
HCM 95th %tile Q(veh) 5.9 0.1 - - 0 - - 1.5
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Intersection
Int Delay, s/veh 8.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 40 8 4 4 4 4 11 40 4 4 34 26
Future Vol, veh/h 40 8 4 4 4 4 11 40 4 4 34 26
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 9 4 4 4 4 12 44 4 4 38 29
Approach EB WB NB SB
HCM Control Delay, s 5.6 2.4 10.1 9.6
HCM LOS B A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 767 1612 - - 1606 - - 858
HCM Lane V/C Ratio 0.08 0.028 - - 0.003 - - 0.083
HCM Control Delay (s) 10.1 7.3 0 - 7.2 0 - 9.6
HCM Lane LOS B A A - A A - A
HCM 95th %tile Q(veh) 0.3 0.1 - - 0 - - 0.3
Scenario 1 Gannett Flemming 8:56 pm 08/16/2022 2026 Background PM Peak Synchro 11 Report
Jeffrey H. Moore Page 1
HCM 6th TWSC
5: June Sayles Rd & Old Charlotte Hwy 08/28/2022
Intersection
Int Delay, s/veh 4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 5 12 7 9 4
Future Vol, veh/h 4 5 12 7 9 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 6 13 8 10 4
Approach EB NB SB
HCM Control Delay, s 8.6 4.6 0
HCM LOS A
Scenario 1 Gannett Flemming 8:56 pm 08/16/2022 2026 Background PM Peak Synchro 11 Report
Jeffrey H. Moore Page 1
Lanes, Volumes, Timings
1: Rocket Drive/Cedar Ridge Dr & US 74 08/30/2022
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 43 664 190 233 1588 10 221 27 116 15 35 88
Future Volume (vph) 43 664 190 233 1588 10 221 27 116 15 35 88
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 110 0 195 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.949 0.999 0.894 0.928
Flt Protected 0.950 0.950 0.950 0.995
Satd. Flow (prot) 1770 3359 0 1770 3536 0 1770 1665 0 0 1720 0
Flt Permitted 0.101 0.090 0.950 0.995
Satd. Flow (perm) 188 3359 0 168 3536 0 1770 1665 0 0 1720 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 1031 413 774 1023
Travel Time (s) 15.6 6.3 17.6 23.3
Peak Hour Factor 0.90 0.90 0.50 0.50 0.90 0.90 0.50 0.50 0.90 0.90 0.50 0.90
Adj. Flow (vph) 48 738 380 466 1764 11 442 54 129 17 70 98
Shared Lane Traffic (%)
Lane Group Flow (vph) 48 1118 0 466 1775 0 442 183 0 0 185 0
Turn Type pm+pt NA pm+pt NA Split NA Split NA
Protected Phases 5 2 1 6 8 8 4 4
Permitted Phases 2 6
Detector Phase 5 2 1 6 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0
Total Split (s) 14.0 46.0 28.0 60.0 31.0 31.0 15.0 15.0
Total Split (%) 11.7% 38.3% 23.3% 50.0% 25.8% 25.8% 12.5% 12.5%
Maximum Green (s) 7.0 39.0 21.0 53.0 24.0 24.0 8.0 8.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None
Act Effct Green (s) 50.0 41.0 69.0 57.8 26.0 26.0 10.0
Actuated g/C Ratio 0.42 0.34 0.58 0.48 0.22 0.22 0.08
v/c Ratio 0.24 0.97 1.16 1.04 1.15 0.51 1.29
Control Delay 23.3 60.5 121.2 55.6 137.3 47.1 217.7
Queue Delay 0.0 0.0 7.2 23.5 0.0 0.0 0.0
Total Delay 23.3 60.5 128.4 79.1 137.3 47.1 217.7
LOS C E F E F D F
Approach Delay 58.9 89.4 110.9 217.7
Approach LOS E F F F
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 15 447 ~376 ~804 ~403 126 ~183
Queue Length 95th (ft) 33 #596 173 #952 235 103 #133
Internal Link Dist (ft) 951 333 694 943
Turn Bay Length (ft) 110 195
Base Capacity (vph) 196 1147 403 1703 383 360 143
Starvation Cap Reductn 0 0 182 134 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.24 0.97 2.11 1.13 1.15 0.51 1.29
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 0 (0%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green, Master Intersection
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.29
Intersection Signal Delay: 89.8 Intersection LOS: F
Intersection Capacity Utilization 87.0% ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 61 677 57 16 1683 5 29 4 23 12 4 120
Future Volume (vph) 61 677 57 16 1683 5 29 4 23 12 4 120
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 125 0 150 0 0 0 0 0
Storage Lanes 1 0 1 0 0 1 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.988 0.850 0.880
Flt Protected 0.950 0.950 0.957 0.996
Satd. Flow (prot) 1770 3497 0 1770 3539 0 0 1783 1583 0 1633 0
Flt Permitted 0.950 0.950 0.501 0.973
Satd. Flow (perm) 1770 3497 0 1770 3539 0 0 933 1583 0 1595 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 413 428 1012 510
Travel Time (s) 6.3 6.5 23.0 11.6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 68 752 63 18 1870 6 32 4 26 13 4 133
Shared Lane Traffic (%)
Lane Group Flow (vph) 68 815 0 18 1876 0 0 36 26 0 150 0
Turn Type Prot NA Prot NA Perm NA pm+ov Perm NA
Protected Phases 5 2 1 6 8 1 4
Permitted Phases 8 8 4
Detector Phase 5 2 1 6 8 8 1 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0 14.0
Total Split (s) 14.0 82.0 14.0 82.0 24.0 24.0 14.0 24.0 24.0
Total Split (%) 11.7% 68.3% 11.7% 68.3% 20.0% 20.0% 11.7% 20.0% 20.0%
Maximum Green (s) 7.0 75.0 7.0 75.0 17.0 17.0 7.0 17.0 17.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None None
Act Effct Green (s) 9.0 84.7 9.0 81.9 16.9 28.1 16.9
Actuated g/C Ratio 0.08 0.71 0.08 0.68 0.14 0.23 0.14
v/c Ratio 0.52 0.33 0.14 0.78 0.27 0.07 0.67
Control Delay 72.0 3.3 46.0 10.8 50.8 33.1 63.3
Queue Delay 0.0 0.6 0.0 2.8 1.5 0.0 10.5
Total Delay 72.0 3.9 46.0 13.6 52.3 33.1 73.8
LOS E A D B D C E
Approach Delay 9.1 13.9 44.3 73.8
Approach LOS A B D E
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 56 58 13 259 25 15 108
Queue Length 95th (ft) m64 m61 m21 181 59 38 m178
Internal Link Dist (ft) 333 348 932 430
Turn Bay Length (ft) 125 150
Base Capacity (vph) 132 2468 132 2415 147 370 252
Starvation Cap Reductn 0 1149 0 0 0 0 0
Spillback Cap Reductn 0 0 0 412 43 0 74
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.52 0.62 0.14 0.94 0.35 0.07 0.84
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 2 (2%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 16.1 Intersection LOS: B
Intersection Capacity Utilization 74.0% ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 6 681 14 4 1619 14 45 4 8 52 4 40
Future Volume (vph) 6 681 14 4 1619 14 45 4 8 52 4 40
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 100 100 100 0 0 0 0 0
Storage Lanes 1 1 1 0 0 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.999 0.981 0.944
Flt Protected 0.950 0.950 0.962 0.973
Satd. Flow (prot) 1770 3539 1583 1770 3536 0 0 1758 0 0 1711 0
Flt Permitted 0.950 0.950 0.679 0.823
Satd. Flow (perm) 1770 3539 1583 1770 3536 0 0 1241 0 0 1447 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1126 1098 1011 107
Travel Time (s) 25.6 25.0 23.0 2.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 7 757 16 4 1799 16 50 4 9 58 4 44
Shared Lane Traffic (%)
Lane Group Flow (vph) 7 757 16 4 1815 0 0 63 0 0 106 0
Turn Type Prot NA Perm Prot NA Perm NA Perm NA
Protected Phases 5 2 1 6 8 4
Permitted Phases 2 8 4
Detector Phase 5 2 2 1 6 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 20.0 20.0 14.0 20.0 20.0 20.0 20.0 20.0
Total Split (s) 14.0 85.0 85.0 14.0 85.0 21.0 21.0 21.0 21.0
Total Split (%) 11.7% 70.8% 70.8% 11.7% 70.8% 17.5% 17.5% 17.5% 17.5%
Maximum Green (s) 7.0 78.0 78.0 7.0 78.0 14.0 14.0 14.0 14.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max C-Max None C-Max None None None None
Act Effct Green (s) 9.0 92.8 92.8 9.0 92.8 14.4 14.4
Actuated g/C Ratio 0.08 0.77 0.77 0.08 0.77 0.12 0.12
v/c Ratio 0.05 0.28 0.01 0.03 0.66 0.43 0.62
Control Delay 24.5 1.5 1.6 52.2 9.0 57.6 65.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 24.5 1.5 1.6 52.2 9.0 57.6 65.5
LOS C A A D A E E
Approach Delay 1.7 9.1 57.6 65.5
Approach LOS A A E E
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 4 12 1 3 273 45 78
Queue Length 95th (ft) m13 24 m2 15 558 92 139
Internal Link Dist (ft) 1046 1018 931 27
Turn Bay Length (ft) 100 100 100
Base Capacity (vph) 132 2738 1224 132 2735 165 192
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.05 0.28 0.01 0.03 0.66 0.38 0.55
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.66
Intersection Signal Delay: 10.2 Intersection LOS: B
Intersection Capacity Utilization 59.4% ICU Level of Service B
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Intersection
Int Delay, s/veh 4.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 23 37 4 4 92 4 4 22 8 4 37 34
Future Vol, veh/h 23 37 4 4 92 4 4 22 8 4 37 34
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 26 41 4 4 102 4 4 24 9 4 41 38
Approach EB WB NB SB
HCM Control Delay, s 2.7 0.3 10.2 10.2
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 728 1485 - - 1563 - - 778
HCM Lane V/C Ratio 0.052 0.017 - - 0.003 - - 0.107
HCM Control Delay (s) 10.2 7.5 0 - 7.3 0 - 10.2
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0.2 0.1 - - 0 - - 0.4
Intersection
Int Delay, s/veh 4.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 52 31 19 40 31
Future Vol, veh/h 10 52 31 19 40 31
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 58 34 21 44 34
Approach EB NB SB
HCM Control Delay, s 9 4.6 0
HCM LOS A
Intersection
Int Delay, s/veh 5.9
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 21 11 43 18 51 59
Future Vol, veh/h 21 11 43 18 51 59
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 23 12 48 20 57 66
Approach EB WB SB
HCM Control Delay, s 4.8 0 9.4
HCM LOS A
Intersection
Int Delay, s/veh 6.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 59 21 6 4 11
Future Vol, veh/h 4 59 21 6 4 11
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 66 23 7 4 12
Approach EB NB SB
HCM Control Delay, s 8.6 5.7 0
HCM LOS A
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 50 1689 56 55 1008 7 54 4 57 20 6 34
Future Volume (vph) 50 1689 56 55 1008 7 54 4 57 20 6 34
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 110 0 195 0 0 0 0 0
Storage Lanes 1 0 1 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.995 0.999 0.859 0.923
Flt Protected 0.950 0.950 0.950 0.984
Satd. Flow (prot) 1770 3522 0 1770 3536 0 1770 1600 0 0 1692 0
Flt Permitted 0.950 0.950 0.950 0.865
Satd. Flow (perm) 1770 3522 0 1770 3536 0 1770 1600 0 0 1487 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 1031 413 774 1023
Travel Time (s) 15.6 6.3 17.6 23.3
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 56 1877 62 61 1120 8 60 4 63 22 7 38
Shared Lane Traffic (%)
Lane Group Flow (vph) 56 1939 0 61 1128 0 60 67 0 0 67 0
Turn Type Prot NA Prot NA Prot NA Perm NA
Protected Phases 5 2 1 6 3 8 4
Permitted Phases 4
Detector Phase 5 2 1 6 3 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0
Total Split (s) 14.0 88.0 14.0 88.0 14.0 28.0 14.0 14.0
Total Split (%) 10.8% 67.7% 10.8% 67.7% 10.8% 21.5% 10.8% 10.8%
Maximum Green (s) 7.0 81.0 7.0 81.0 7.0 21.0 7.0 7.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lead Lead Lag Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None
Act Effct Green (s) 9.0 92.4 9.0 92.4 9.0 20.2 9.0
Actuated g/C Ratio 0.07 0.71 0.07 0.71 0.07 0.16 0.07
v/c Ratio 0.46 0.77 0.50 0.45 0.49 0.27 0.66
Control Delay 70.8 19.2 70.1 2.4 72.5 49.7 88.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 70.8 19.2 70.1 2.4 72.5 49.7 88.0
LOS E B E A E D F
Approach Delay 20.6 5.9 60.5 88.0
Approach LOS C A E F
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 46 646 55 83 50 49 56
Queue Length 95th (ft) 93 769 m104 83 97 94 #127
Internal Link Dist (ft) 951 333 694 943
Turn Bay Length (ft) 110 195
Base Capacity (vph) 122 2503 122 2513 122 283 102
Starvation Cap Reductn 0 0 0 116 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.46 0.77 0.50 0.47 0.49 0.24 0.66
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green, Master Intersection
Natural Cycle: 100
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.77
Intersection Signal Delay: 18.3 Intersection LOS: B
Intersection Capacity Utilization 67.0% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 141 1494 146 47 914 5 74 6 114 26 5 94
Future Volume (vph) 141 1494 146 47 914 5 74 6 114 26 5 94
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 125 0 150 0 0 0 0 0
Storage Lanes 1 0 1 0 0 1 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.987 0.999 0.850 0.899
Flt Protected 0.950 0.950 0.956 0.990
Satd. Flow (prot) 1770 3493 0 1770 3536 0 0 1781 1583 0 1658 0
Flt Permitted 0.950 0.950 0.485 0.913
Satd. Flow (perm) 1770 3493 0 1770 3536 0 0 903 1583 0 1529 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 45 45 30 30
Link Distance (ft) 413 428 1012 510
Travel Time (s) 6.3 6.5 23.0 11.6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 157 1660 162 52 1016 6 82 7 127 29 6 104
Shared Lane Traffic (%)
Lane Group Flow (vph) 157 1822 0 52 1022 0 0 89 127 0 139 0
Turn Type Prot NA Prot NA Perm NA Perm Perm NA
Protected Phases 5 2 1 6 8 4
Permitted Phases 8 8 4
Detector Phase 5 2 1 6 8 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 19.0 14.0 19.0 14.0 14.0 14.0 14.0 14.0
Total Split (s) 25.0 89.0 14.0 78.0 27.0 27.0 27.0 27.0 27.0
Total Split (%) 19.2% 68.5% 10.8% 60.0% 20.8% 20.8% 20.8% 20.8% 20.8%
Maximum Green (s) 18.0 82.0 7.0 71.0 20.0 20.0 20.0 20.0 20.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max None C-Max None None None None None
Act Effct Green (s) 18.5 90.5 9.0 78.2 18.3 18.3 18.3
Actuated g/C Ratio 0.14 0.70 0.07 0.60 0.14 0.14 0.14
v/c Ratio 0.62 0.75 0.43 0.48 0.70 0.57 0.65
Control Delay 55.0 3.4 62.6 15.3 80.8 61.8 68.4
Queue Delay 0.0 0.3 0.0 0.0 0.0 0.0 0.0
Total Delay 55.0 3.7 62.6 15.3 80.8 61.8 68.4
LOS D A E B F E E
Approach Delay 7.7 17.6 69.6 68.4
Approach LOS A B E E
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 140 47 42 231 72 101 112
Queue Length 95th (ft) m185 52 87 282 #133 165 181
Internal Link Dist (ft) 333 348 932 430
Turn Bay Length (ft) 125 150
Base Capacity (vph) 272 2431 122 2125 152 267 258
Starvation Cap Reductn 0 151 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.58 0.80 0.43 0.48 0.59 0.48 0.54
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 4 (3%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.75
Intersection Signal Delay: 17.2 Intersection LOS: B
Intersection Capacity Utilization 78.4% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 43 1532 60 4 905 55 29 4 8 35 4 31
Future Volume (vph) 43 1532 60 4 905 55 29 4 8 35 4 31
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 100 100 100 0 0 0 0 0
Storage Lanes 1 1 1 0 0 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.991 0.973 0.940
Flt Protected 0.950 0.950 0.966 0.975
Satd. Flow (prot) 1770 3539 1583 1770 3507 0 0 1751 0 0 1707 0
Flt Permitted 0.950 0.950 0.726 0.849
Satd. Flow (perm) 1770 3539 1583 1770 3507 0 0 1316 0 0 1487 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1126 1098 1011 107
Travel Time (s) 25.6 25.0 23.0 2.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 48 1702 67 4 1006 61 32 4 9 39 4 34
Shared Lane Traffic (%)
Lane Group Flow (vph) 48 1702 67 4 1067 0 0 45 0 0 77 0
Turn Type Prot NA Perm Prot NA Perm NA Perm NA
Protected Phases 5 2 1 6 8 4
Permitted Phases 2 8 4
Detector Phase 5 2 2 1 6 8 8 4 4
Switch Phase
Minimum Initial (s) 7.0 12.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0
Minimum Split (s) 14.0 20.0 20.0 14.0 20.0 20.0 20.0 20.0 20.0
Total Split (s) 16.0 94.0 94.0 14.0 92.0 22.0 22.0 22.0 22.0
Total Split (%) 12.3% 72.3% 72.3% 10.8% 70.8% 16.9% 16.9% 16.9% 16.9%
Maximum Green (s) 9.0 87.0 87.0 7.0 85.0 15.0 15.0 15.0 15.0
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None C-Max C-Max None C-Max None None None None
Act Effct Green (s) 10.6 107.3 107.3 9.0 97.3 13.7 13.7
Actuated g/C Ratio 0.08 0.83 0.83 0.07 0.75 0.11 0.11
v/c Ratio 0.33 0.58 0.05 0.03 0.41 0.33 0.49
Control Delay 48.5 1.3 0.7 57.2 8.6 59.2 65.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 48.5 1.3 0.7 57.2 8.6 59.2 65.1
LOS D A A E A E E
Approach Delay 2.5 8.8 59.2 65.1
Approach LOS A A E E
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 40 15 1 3 191 36 62
Queue Length 95th (ft) m53 80 m7 15 251 74 113
Internal Link Dist (ft) 1046 1018 931 27
Turn Bay Length (ft) 100 100 100
Base Capacity (vph) 149 2922 1307 122 2625 172 194
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.32 0.58 0.05 0.03 0.41 0.26 0.40
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 36 (28%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.58
Intersection Signal Delay: 7.2 Intersection LOS: A
Intersection Capacity Utilization 56.5% ICU Level of Service B
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Intersection
Int Delay, s/veh 5.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 40 86 4 4 54 4 11 40 4 4 34 26
Future Vol, veh/h 40 86 4 4 54 4 11 40 4 4 34 26
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 96 4 4 60 4 12 44 4 4 38 29
Approach EB WB NB SB
HCM Control Delay, s 2.3 0.5 11.3 10.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 635 1538 - - 1493 - - 737
HCM Lane V/C Ratio 0.096 0.029 - - 0.003 - - 0.096
HCM Control Delay (s) 11.3 7.4 0 - 7.4 0 - 10.4
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0.3 0.1 - - 0 - - 0.3
Intersection
Int Delay, s/veh 4.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 23 36 59 38 30 16
Future Vol, veh/h 23 36 59 38 30 16
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 26 40 66 42 33 18
Approach EB NB SB
HCM Control Delay, s 9.4 4.5 0
HCM LOS A
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 55 29 47 28 31 36
Future Vol, veh/h 55 29 47 28 31 36
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 61 32 52 31 34 40
Approach EB WB SB
HCM Control Delay, s 4.9 0 9.6
HCM LOS A
Intersection
Int Delay, s/veh 6.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 36 55 7 9 4
Future Vol, veh/h 4 36 55 7 9 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 4 40 61 8 10 4
Approach EB NB SB
HCM Control Delay, s 8.6 6.5 0
HCM LOS A
Network Summary
Network wide Queuing Penalty: 2387
Network Summary
Network wide Queuing Penalty: 64
Network Summary
Network wide Queuing Penalty: 2653
Intersection: 16: US 74
Movement EB WB WB SB
Directions Served L T TR LR
Maximum Queue (ft) 53 29 22 95
Average Queue (ft) 17 1 1 43
95th Queue (ft) 45 9 7 83
Link Distance (ft) 1065 1065 86
Upstream Blk Time (%) 1
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 100
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 30
Network Summary
Network wide Queuing Penalty: 2330
Network Summary
Network wide Queuing Penalty: 231
Appendix C: Site Plan
Old Charlotte Highway
Traffic Impact Analysis
Appendix D: NCDOT TIA Checklist and MOA
NCDOT Traffic Impact Analysis Need Screening / Scoping Request
A Traffic Impact Analysis (TIA) may be required for developments based on the site trip generation
estimates, site context, or at the discretion of the NCDOT District Engineer. The Applicant or the TIA
Consultant shall submit this form along with the site plan to the District Engineer to determine the TIA
need and, if a TIA is required, initiate the TIA scoping process. Without an approved scope, the TIA is
incomplete and will be rejected until the study is revised to conform to NCDOT’s TIA requirements.
Project Name: Old Charlotte Highway Previous Name: If Applicable
Location: 113 & 107 Old Charlotte Highway County: Buncombe Municipality:
Project Description: Residential Development consisting of 402 duplexes and 175 units multifamily mid-rise
Site Plan Prepared By: Doran Architecture Site Plan Date: 8/1/2022
See site plan/vicinity map requirements on page 2.
Parcel Size: 97.8 Acre(s) Anticipated Build-Out Year: 2026
Weekday Site Trip Generation - Do NOT adjust for mode split, pass-by, internal capture, or diverted trips.
ITE Peak Hour AM Peak Hour Trips PM Peak Hour Trips Data
Proposed Land Use Size Unit Daily Trips
LUC Type Enter Exit Total Enter Exit Total Source
215 Single Family Attch 218 Units 1611 Adj. Street 33 75 108 72 55 127 ITE Equation
220 Multifamily Low 88 Units 639 Adj. Street 12 38 50 36 22 58 ITE Equation
221 Multifamily Mid 210 Units 955 Adj. Street 19 62 81 50 32 82 ITE Equation
Site Plan/Vicinity Map Requirement for TIA Need Screening: While the site plan may not be finalized
during the TIA scoping stage, the graphic representation of the proposed development shall provide
adequate details on the development scope and context. More specifically, the site plan/map shall clearly
show the location and type of each access point, spacing to adjacent and opposing driveways or
intersections, internal street network, proposed buildings/parcels with their anticipated uses and sizes at full
build-out and, if applicable, any nearby interstate, US, NC or Secondary Roads (SR).
܈A TIA is Required by the Local Government. In addition, the study area is expected to include
NCDOT maintained transportation facilities.
܈A TIA is Required by NCDOT, per the Policy on Street and Driveway Access to North Carolina Highways.
If either or both of the boxes above are checked, the Applicant/TIA Consultant is hereby requested to
fill out as much as possible of the following TIA scoping checklist, and return it along with the
supporting documents to NCDOT prior to the scoping meeting.
܆A TIA is NOT required. This decision is based on the development information presented above.
Changes in the development plan will require re-evaluation of the TIA need, and may necessitate a TIA.
The Applicant should inform the District Engineer of any significant changes in a timely fashion to avoid
delays or rejections of the driveway permit / encroachment agreement applications.
Effective Date: 10/01/2017 (Version 17-721) Page 2 of 2
NCDOT Traffic Impact Analysis Need Screening / Scoping Request
Additional Comments:
The TIA need decision is made by the NCDOT Division 13 District 2 on .
܆Additional access clarifications and provisions (e.g., proposed control-of-access or median breaks,
modifications of existing access, loading/unloading area access, bike/pedestrian accommodation).
܆
܈Trip Generation
The TIA Consultant shall prepare trip generation estimates following the current NCDOT Congestion
Management Capacity Analysis Guidelines, and submit the calculation sheets and supporting information
to the District Engineer for approval prior to capacity analysis.
܆Existing Site Trip Information for Redevelopment Projects (Attach separate sheets as needed)
ITE Peak Hour AM Peak Hour Trips PM Peak Hour Trips
Existing Land Use Size Unit Daily Trips Data Source
LUC Type Enter Exit Total Enter Exit Total
Please Select Please Select
܈Trip Distribution
܈ Trip distribution diagrams are submitted concurrently with this document (attach separate sheets).
܆ Trip distribution diagrams will be submitted separately, along with supporting information, to the
District Engineer for review and approval prior to capacity analysis. The trip distribution shall be
based on the current and anticipated traffic patterns, as well as instructions noted below.
If required by the District Engineer, the following additional diagrams shall also be submitted:
܆Mixed-Use Developments (separate diagrams for residential, commercial, and office trips)
܆Inter-Development Trips (if ‘internal” trips cross public streets)
܆Pass-By Trips
܆Diverted Trips
܆Each Analysis Period
܆Mode Split
܆Provide Data Source and Justification
Mode
Auto
Period
AM Peak % % %
PM Peak % % %
Daily % % %
% % %
܈Study Method
The traffic analysis shall follow the current NCDOT Congestion Management Capacity Analysis Guidelines,
Policy on Street and Driveway Access to North Carolina Highways, and use the current approved version of
analysis software (e.g. Synchro/SimTraffic, HCS, Sidra Intersection, TransModeler).
The study shall include the following analysis scenarios for each analysis period.
1. Existing Conditions
2. Future No-Build Conditions (existing + background growth + approved developments + committed
or funded improvements)
3. Future Build Conditions (future no-build + site trips)
4. Future Build with Improvements Conditions (future build traffic with improvements to mitigate
the proposed development’s impacts) and, if applicable:
܆5. TIP Design Year Analysis
܆6. Alternative Access Scenario (without proposed control-of-access or median break / modification)
܈Submittals
In addition to the hardcopies required below, the TIA Consultant shall provide the District Engineer and, if
required, the local government an electronic copy of the study documents, including the latest site plan,
figures and appendices, in searchable PDF files and the original traffic analysis files (e.g., Synchro, HCS).
To expedite review, the NCDOT electronic submittals shall also be delivered concurrently to:
܆Div. Traffic Engr ܆Regional Traffic Engr ܈Congestion Management ܈Other Buncombe County
NCDOT Local Government
Submittals
Electronic Hardcopy Electronic Hardcopy
Trip Generation & Distribution Required Required
Draft TIA Report Required Required
Final Sealed TIA Report Required Required
܆Additional Comments (municipal TIA requirements, approved variations from NCDOT guidelines)
The undersigned agree to the contents and methodology described above for completing the required traffic
impact analysis for the proposed development identified herein. Any changes to the above methodology
contemplated by the Applicant or the TIA Consultant must be submitted to the District Engineer in writing.
If approved by NCDOT, then such changes may be accepted for the TIA report. Subsequent revisions to the
development plan (e.g. land use, density, site access, or schedule) may require additional scoping and analysis,
and may modify the TIA requirements.
This agreement shall become effective on the date approved by NCDOT, and shall expire months after
the effective date or upon significant changes to the roadway network and/or development assumptions,
whichever occurs first. Once expired, renewal or re-scoping will be required for subsequent TIA submittals.
APPLICANT
Tony Kuechle
Signature Print Name Date
TIA CONSULTANT
Jeff Moore, P. E.
Signature Print Name Date
The undersigned affirms that, except for the deviations noted below, the TIA submittal conforms to the
current NCDOT Congestion Management Capacity Analysis Guidelines, Policy on Street and Driveway
Access to North Carolina Highways, and the TIA Scoping Checklist approved by the NCDOT District
Office. The undersigned also acknowledges that the TIA will be rejected if the deviations and justifications
are not properly documented and approved by NCDOT.
Deviations and Justifications (e.g., changes in site plan, development schedule, site trip and off-site trip
estimates, study area, data collection, analysis period and method. Attached separate sheets if needed.)
Jeffrey H. Moore, P. E.
TIA Consultant’s Signature Print Name Date
(Professional Engineer of TIA Record)
August 1, 2022
To: Nathan Pennington, Buncombe County
Chris Medlin, NCDOT District Engineer
Tony Kuechle, Doran
INTRODUCTION
Old Charlotte Highway, a proposed residential development, is planned to be constructed on the north
side of Old Charlotte Highway (SR 2771) in Buncombe County, NC (refer to Figure 1 – Project and
Count Locations).
The proposed 97.8-acre residential development is planned to consist of the following land uses:
The Site Plan, prepared by Doran Architecture, dated, 8/1/22, illustrates two (2) proposed access points
with one on SR 2771 (Old Charlotte Highway) and the other on SR 2772 (June Sayles Road) (See Figure
2).
Capacity Analysis
Capacity analysis, using Synchro/SimTraffic Version 11, will be performed for the AM and PM peak
hours at the study area intersections for existing and study year scenarios.
Trip Generation
Preliminary trip generation estimates for the proposed mixed-use development has been developed using
the ITE Trip Generation Manual, 11th Edition. Table 1 below illustrates the trip generation estimates
itemized by proposed land use.
The trip generation noted in Table 1 was developed using the suggested method as outlined in the
NCDOT Congestion Management Rate vs Equation Spreadsheet, dated July 1, 2018 and the draft August
1, 2021 update, with the following parameters.
Growth Rates
According to NCDOT AADT Volumes
(http://ncdot.maps.arcgis.com/apps/webappviewer/index.html?id=5f6fe58c1d90482ab9107ccc03026280),
the following are the historical annual daily traffic (AADT) on study area roadways.
As illustrated in the table above, the traffic on study area roadways have stayed virtually the same or
increased slightly over the past 12 years. Gannett Fleming recommends a 1% compounded annual growth
2
rate is to be used on study area and intersections. This annual growth rate is typical for suburban areas in
North Carolina.
Approved Developments
No major approved developments have been identified in the study area.
Traffic distribution above is based on review of NCDOT AADT, and Gannett Fleming’s local knowledge
of the area. When Gannett Fleming obtains the existing traffic counts for the study area intersections, the
directions of approach and departure will be reviewed and adjusted as necessary before submitting to
Buncombe County and NCDOT for concurrence. The proposed directions of approach and departure are
illustrated in Figure 3.
Other Issues
The TIA will address Finding of Fact in the Conclusion section.
This concludes the Memorandum of Understanding. Please review and provide your concurrence at
our earliest convenience. If you have any questions, please feel free to contact me at rtipton@gfnet.com
or 828.776.2971.
3