Professional Documents
Culture Documents
Goodluck
Goodluck
PRE HISTORY;
THEORY OF ARCHITECTURE
B. Scope
1. Introduction
a. The nature of architecture
b. Architecture as art and science
c. Processes in architectural design
3. Design Perception
a. Anthropometric basis of architectural design
b. Space articulation and territoriality
c. Visual and perceptual language
d. Psychology of space
e. Proxemics and culture
4. Tropical Architecture
a. Influences and elements of tropical architecture
b. Specific examples of tropical architecture
5. Masters of Architecture
a. Philosophies of Great Architects
b. Examples of great works
ACTUAL EXAM
DICTUMS:
PROPORTION
BALANCE
SYMMETRY
EMPHASIS
SCALE
CONTRAST
HEIRARCHY
RHYTHM
UNITY
ARCHITECT OF :
B. Scope
1. Certification of Architects and Standards of Professional Practice
a. Statutes regulating the practice of architecture in the Philippines
b. Professional organization of architects
c. Architects- Code of Ethics
d. Rights and responsibilities of the profession
e. Spectrum of architectural services
f. Architectural fees and charges
g. Architectural competitions
ACTUAL EXAM
TO THE PUBLIC
TO YOUR COLLEAGUE
TO THE MANUFACTURER
TO THE CONTRACTOR
PROF. PRAC - SPP 207 DESIGN-BUILD SCOPE - WHEN THE VARIOUS PHASES OF
DESIGN SERVICES ARE COMPLETED, THE CONSTRUCTION PHASE GOES BEYOND
PERIODIC INSPECTION
AND ASSESSMENT TO INCLUDE THE FOLLOWING:
PROF. PRAC - SPP 201 PRE-DESIGN SERVICES SCOPE (STUDY THE SCOPE)
THE DETAILED ANALYSIS OF THE SITE INVOLVES THE IDENTIFICATION OF A SITE’S
DEVELOPMENT POTENTIALS THROUGH THE PROPER UTILIZATION OF LAND.
THE ANALYSIS COVERS THE CONTEXT OF THE SITE AS WELL AS THAT OF ITS
SURROUNDING ENVIRONMENT AND THE DEVELOPMENT CONTROLS THAT APPLY TO
THE SITE AND ITS ENVIRONS.
TIPS: MUST STUDY UAP DOC 301, I THINK MORE THAN 5 QUESTIONS ARE IN THIS
PROVISION AND ALSO STUDY CODE OF ETHICS. NO METHOD OF COMPENSATION
THIS JANUARY, HIGH CHANCE LUMABAS NEXT ALE.
THEORY AND PRINCIPLES OF PLANNING
Scope
1. General Principles of Planning
a. Definitions and classification
b. History and scope of planning
c. General planning process
ACTUAL EXAM:
UTILITIES
Design and construction and/or installation of the following utilities systems:
2. Mechanical Systems
a. Heating, ventilating, and air-conditioning systems
b. Conveyors and other building mechanical equipment
6. Communication Systems
a. Electronics system
b. Telephone, intercom, cable TV, audio/video facilities,PA system
7. High-tech Systems
a. Application in buildings and structures
b. Robotics
c. Intelligent buildings
ACTUAL
SANITARY
PICTURES :
PIPILIIN KUNG ALIN ANG THEN ALL OF THEM IS BLACK AND WHITE LILIIT PA NG
PICTURES KAYA I IDENTIFY NIO PAGKAKAIBA IBA NILA
POLYPROPYLENE
POLYVINYL CHLORIDE
BRASS
COPPER
CAST IRON
ELECTRICAL PICTURES
PICTURES:
ATS -
CIRCUIT BREAKER - CAN ACT AS A SWITCH
PANEL BOARD – PUNTAHAN NG LAHAT NG LOAD NG KURYENTE ATA YUN
RATED BOX
FDAS
LED
T5 LED
CFL
FLOURESCENT
PLUMBING TERMS
GATE VALVE
CHECK VALVE
ALIN DAW WINDOW ANG MAY ALMOST 90% NA NAKUKUHANG AIR: ( ALAM
NATIN NA LOUVER PERO ANG CHOICES AY )
A CASEMENT C AWNING
B SLIDING D ALTAIR LOUVER ( TF ) HAHAHA PAG D KA
FAMILIAR MAG OOVERTHINK KA NDI MAN LANG JALOUISE NILAGAY EH OR
LOUVER KASI IBAT IBANG LOUVERS DIN NMAN ANG MERON DBA :D
STRUCTURAL DESIGN
Scope
General application of structural design, including seismic analysis, in the following
building materials and construction systems:
a. Timber
b. Reinforced concrete
c. Structural steel
d. Composite structures
e. Advanced construction methods
ACTUAL EXAM
IMAGES CONNECTION OF :
CONCRETE TO STEEL
STEEL TO STEEL
CONCRETE TO WOOD
WOOD TO STEEL
MAXIMUM LENGTH OF A TIMBER ( ATA YUN HAHAH BSTA ABOUT SIZE NG
TIMER)
DES – NOT A TYPE OF LAP POOL STEP CHOICES ARE: EDGE, CORNER,
CENTERED, OUTWARD
DES – PLOTTING AND GETTING AREA OF IRREGULAR LOTS FROM BEARINGS.
DES – 1 VAN AND 1 SEDAN CAR PARKED ONE AT THE BACK OF ANOTHER
WHAT IS LENGTH? CHOICES ARE: 10M, 12M, 5M, 11M
DES – 2 VANS PARKED ONE BACK OF THE OTHER CHOICES ARE: 10M, 12M, 5M,
11M
DES – 2 SUV PARKED ONE BACK OF THE OTHER CHOICES ARE: 10M, 12M, 5M,
11M
DES – 1 SUV AND 1 VANS PARKED ONE BACK OF THE OTHER CHOICES ARE:
10M, 12M, 5M, 11M