CLIENT : PT.

PERTAMINA GAS
PROJECT : JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA GAS. SENIPAH – BALIKPAPAN

SENIPAH
RETAINING WALL
SNBP-EPC-10-CIV-DRW-054 DOCUMENT REVIEW STATUS

X 1. APPROVED
Work May Proceed

2. APPROVED WITH COMMENTS


May Proceed to the next stage, resubmit
corrected document for final approval

3. REVIEWED / COMMENTED
Resubmit corrected document for approval

4. FOR INFORMATION ONLY


Review not required for this document

5. REJECTED
Work may not proceed on the basis
DA KD in the document
11/12/22 11/12/22
CHECK BY
TRI 07/12/2022
Initial Sign Date

APP'D BY
AK 11/12/22
Initial Sign Date

SOLUTION
action for excellence
°
36.2

N = 9898681.304
N = 9898634.649
E = 520002.810
E = 520066.562
DRAWING LIMIT

DOCUMENT REVIEW STATUS

X 1. APPROVED
Work May Proceed

2. APPROVED WITH COMMENTS


May Proceed to the next stage, resubmit
corrected document for final approval

3. REVIEWED / COMMENTED
Resubmit corrected document for approval

4. FOR INFORMATION ONLY


Review not required for this document

5. REJECTED
Work may not proceed on the basis
in the document

CHECK BY
TRI 07/12/2022
Initial Sign Date

APP'D BY
AK 11/12/22
Initial Sign Date

79000,01

N = 9898601.563
E = 520042.349
N = 9898648.217
E = 519978.596

SOLUTION
action for excellence

JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI


PEMBANGUNAN PIPA GAS
SENIPAH – BALIKPAPAN

SENIPAH
RETAINING WALL
DOCUMENT REVIEW STATUS

x 1. APPROVED
Work May Proceed

2. APPROVED WITH COMMENTS


May Proceed to the next stage, resubmit
corrected document for final approval

3. REVIEWED / COMMENTED
Resubmit corrected document for approval

4. FOR INFORMATION ONLY


Review not required for this document

5. REJECTED
Work may not proceed on the basis
in the document

CHECK BY
TRI 07/12/2022
Initial Sign Date
AK 11/12/22
APP'D BY
Initial Sign Date

SOLUTION

JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI

SENIPAH – BALIKPAPAN

SENIPAH
RETAINING WALL
DOCUMENT REVIEW STATUS
X 1. APPROVED
Work May Proceed

2. APPROVED WITH COMMENTS


May Proceed to the next stage, resubmit
corrected document for final approval

3. REVIEWED / COMMENTED
Resubmit corrected document for approval

4. FOR INFORMATION ONLY


Review not required for this document

5. REJECTED
Work may not proceed on the basis
in the document

CHECK BY
TRI 07/12/2022
Initial Sign Date
AK 11/12/22
APP'D BY
Initial Sign Date

SOLUTION

JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI

SENIPAH – BALIKPAPAN

SENIPAH
RETAINING WALL
DOCUMENT REVIEW STATUS

X 1. APPROVED
Work May Proceed

2. APPROVED WITH COMMENTS


May Proceed to the next stage, resubmit
corrected document for final approval

3. REVIEWED / COMMENTED
Resubmit corrected document for approval

4. FOR INFORMATION ONLY


Review not required for this document

5. REJECTED
Work may not proceed on the basis
in the document

CHECK BY TRI 07/12/2022


Initial Sign Date

APP'D BY
AK 11/12/22
Initial Sign Date

SOLUTION

JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI

SENIPAH – BALIKPAPAN

SENIPAH
RETAINING WALL
SNBP-EPC-00-ELE-DRW-006_Rev 0 Overall Ligthing Layout (1)

DOCUMENT REVIEW STATUS

x 1. APPROVED
Work May Proceed

2. APPROVED WITH COMMENTS


May Proceed to the next stage, resubmit
corrected document for final approval

3. REVIEWED / COMMENTED
Resubmit corrected document for approval

4. FOR INFORMATION ONLY


Review not required for this document

5. REJECTED
Work may not proceed on the basis
in the document

TRI 07/12/2022
CHECK BY
Initial Sign Date

APP'D BY
AK 11/12/22
Initial Sign Date

SOLUTION

JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI

SENIPAH – BALIKPAPAN

SENIPAH
RETAINING WALL
DOCUMENT REVIEW STATUS

X 1. APPROVED
Work May Proceed

2. APPROVED WITH COMMENTS


May Proceed to the next stage, resubmit
corrected document for final approval

3. REVIEWED / COMMENTED
Resubmit corrected document for approval

4. FOR INFORMATION ONLY


Review not required for this document

5. REJECTED
Work may not proceed on the basis
in the document

CHECK BY
TRI 07/12/2022
Initial Sign Date

APP'D BY AK 11/12/22
Initial Sign Date

SOLUTION

JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI

SENIPAH – BALIKPAPAN

SENIPAH
RETAINING WALL
DOCUMENT REVIEW STATUS

X 1. APPROVED
Work May Proceed

2. APPROVED WITH COMMENTS


May Proceed to the next stage, resubmit
corrected document for final approval

3. REVIEWED / COMMENTED
Resubmit corrected document for approval

4. FOR INFORMATION ONLY


Review not required for this document

5. REJECTED
Work may not proceed on the basis
in the document

TRI 07/12/2022
CHECK BY
Initial Sign Date

APP'D BY
AK 11/12/22
Initial Sign Date

SOLUTION

JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI

SENIPAH – BALIKPAPAN

SENIPAH
RETAINING WALL