KONTRAK :
CIVIL SP3MK-
005/PG3400/2022-S7
TRI 25/11/22
AK 25/11/22
REVISION TABLE
1
2
3
4
5
6
7
8
9
10
11
JASA PERANCANGAN, PENGADAAN, DAN
KONSTRUKSI PEMBANGUNAN PIPA GAS
SENIPAH – BALIKPAPAN
RECORD OF REVISION
Rev. Implemented
Page Client Comment Explanation
Code (Y/N)
JASA PERANCANGAN, PENGADAAN, DAN
KONSTRUKSI PEMBANGUNAN PIPA GAS
SENIPAH – BALIKPAPAN
TABLE OF CONTENT
1 INTRODUCTION .................................................................................................................................... 4
1.1 Project Overview ........................................................................................................................ 4
1.2 Scope .......................................................................................................................................... 4
2 DEFINITION ........................................................................................................................................... 5
3 CONFLICTING REQUIREMENT ........................................................................................................... 5
4 CODES, STANDARD, AND REFERENCES ......................................................................................... 5
5 MTO CIVIL AND STRUCTURES ........................................................................................................... 7
JASA PERANCANGAN, PENGADAAN, DAN
KONSTRUKSI PEMBANGUNAN PIPA GAS
SENIPAH – BALIKPAPAN
1 INTRODUCTION
PT Pertamina Gas (Pertagas) plans to deliver gas from Senipah KP 7.2 (tap off from 42”
pipeline) that is operated by Pertamina Hulu Mahakan to PT Pertamina (Persero) Refinery Unit
(RU) V Balikpapan, East Kalimantan, to fulfill the gas demand at Refinery Unit (RU) V
Balikpapan as part of the RDMP program.
The Onshore Pipeline Senipah – RU V Balikpapan scope will comprise of development of mini
facility in Senipah and RU V Balikpapan area consist of gas metering, pigging facilities, utilities
and an onshore gas pipeline.
Figure 1-1 Pipeline Route from Senipah to Refinery Unit (RU) V Balikpapan
1.2 Scope
This document is intended to present the Material Take Off of project Jasa Perancangan,
Pengadaan, dan Konstruksi Pembangunan Pipa Gas Senipah – Balikpapan.
JASA PERANCANGAN, PENGADAAN, DAN
KONSTRUKSI PEMBANGUNAN PIPA GAS
SENIPAH – BALIKPAPAN
2 DEFINITION
3 CONFLICTING REQUIREMENT
In the event of conflict, inconsistency, or ambiguity between Data sheets, drawings, this
procedure, standards, codes, and regulations referenced herein, or other documents, the
VENDOR or CONTRACTOR shall refer to COMPANY, whose decision shall prevail. In
principle, the requirements of the most stringent document shall apply.
The following documents shall be complied with, unless stated otherwise in this Standard
specification. The latest editions and revisions of each Code and/or specification, as of the
Contract Document date, shall apply, unless otherwise specifically noted on the Contract
Documents or approved, in writing, by the Company.
1. ASME B16.5 Standard specification for Pipe Flanges and Flanged Fittings:
covers pressure-temperature ratings, materials, dimensions
2. ASME B36.10 Standard specification for welded and seamless wrought steel
pipes which are used for high or low temperatures and
pressures.
3. ASTM A105 Standards for forged carbon steel piping components, that is,
flanges, fittings, valves, and similar parts, for use in pressure
systems at ambient and higher-temperature service conditions
JASA PERANCANGAN, PENGADAAN, DAN
KONSTRUKSI PEMBANGUNAN PIPA GAS
SENIPAH – BALIKPAPAN
4. ASTM A193 Standard covers alloy steel and stainless steel bolting materials
for high temperature or high-pressure service. This
specification includes fasteners intended for use in pressure
vessels, valves, flanges, and fittings.
5. References Document
SNBP-EPC-00-CIV-DRW-002 LBCV House Foundation Plan, Structure Detail & Section
.
SNBP-EPC-00-CIV-DRW-010 Typical Drawing for Retaining Wall/ Slope Protection
SNBP-EPC-10-CIV-DRW-006 Senipah Gas Metering Package Foundation Plan And Section
SNBP-EPC-10-CIV-DRW-007 Senipah Pig Launcher Foundation Plan And Section
SNBP-EPC-10-CIV-DRW-008 Senipah Air Compressor & Air Dryer Package Foundation Plan
And Section
SNBP-EPC-10-CIV-DRW-009 Diesel Storage Foundation Plan And Section
SNBP-EPC-10-CIV-DRW-010 Metering Control Foundation Plan And Section
SNBP-EPC-10-CIV-DRW-012 Security Gate House Foundation Plan And Section
SNBP-EPC-10-CIV-DRW-014 Emergency Diesel Generator Foundation Plan And Section
SNBP-EPC-10-CIV-DRW-016 Gas Metering Shelter Foundation Plan And Section
SNBP-EPC-10-CIV-DRW-027 Lighting Protection Foundation Plan And Section
SNBP-EPC-10-CIV-DRW-031 Windsock & Flag Pole Foundation Plan And Section
SNBP EPC 10 CIV DRW 036 Co2 Snuffing Package Foundation Plan And Section
- - - - -
Formwork m2 11,2
SNBP-EPC-10-CIV-DRW-016 GAS METERING SHELTER FOUNDATION PLAN AND
9
SECTION
Footing
Concrete m3 5,76
Reinforcement Bar kg 869,61
Formwork m 2
19,2
Pedestal
Concrete m3 2,6
Reinforcement Bar kg 571,2
Formwork m 2
23
Tiebeam Arah X
Concrete m3 3,84
Reinforcement Bar kg 389,68
Formwork m 2
35,2
Tiebeam Arah Y
Concrete m3 1,4
Reinforcement Bar kg 137,1
Formwork m 2
12,76
SNBP-EPC-10-CIV-DRW-027 LIGHTING PROTECTION FOUNDATION PLAN AND
10
SECTION
Footing
Concrete m3 0,68
Reinforcement Bar kg 78,77
Formwork m 2
1,8
Pedestal
Concrete m3 0,38
Reinforcement Bar kg 55,09
Formwork m 2 3
SNBP-EPC-10-CIV-DRW-031 WINDSOCK & FLAG POLE FOUNDATION PLAN AND
11
SECTION
Footing
Concrete m3 0,3
Reinforcement Bar kg 40,55
Formwork m 2 1,2
Pedestal
Concrete m3 0,16
Reinforcement Bar kg 32,27
Formwork m 2 1,8
JASA PERANCANGAN, PENGADAAN, DAN
KONSTRUKSI PEMBANGUNAN PIPA GAS
SENIPAH – BALIKPAPAN
Formwork m2 37,5
SNBP-EPC-20-CIV-DRW-008 GAS METERING SHELTER FOUNDATION PLAN AND
19
SECTION
Footing
Concrete m3 6
Reinforcement Bar kg 744,61
Formwork m 2
24
Pedestal
Concrete m3 3,4
Reinforcement Bar kg 577,9
Formwork m 2
26,8
Tiebeam Arah X
Concrete m3 4,32
Reinforcement Bar kg 431,84
Formwork m 2
39,6
Tiebeam Arah Y
Concrete m3 1,44
Reinforcement Bar kg 139,6
Formwork m 2
13,2
20 SNBP-EPC-20-CIV-DRW-009 PIG RECEIVER FOUNDATION PLAN AND SECTION
Footing
Concrete m3 1,8
Reinforcement Bar kg 247,59
Formwork m 2
6
Pedestal
Concrete m3 0,24
Reinforcement Bar kg 46,4
Formwork m2 2,56
Tiebeam
Concrete m3 1,81
Reinforcement Bar kg 132,16
Formwork m 2 12,08
21 SNBP-EPC-20-CIV-DRW-010 GAS RECEIVER FOUNDATION PLAN AND SECTION
Footing
Concrete m3 4,05
Reinforcement Bar kg 274,37
Formwork m2 5,4
Pedestal
Concrete m3 2,42
Reinforcement Bar kg 592,62
Formwork m2 4,4
JASA PERANCANGAN, PENGADAAN, DAN
KONSTRUKSI PEMBANGUNAN PIPA GAS
SENIPAH – BALIKPAPAN
Formwork m2 10,2
Pedestal Stair
Concrete m3 0,08
Reinforcement Bar kg 21,16
Formwork m 2
0,96
SNBP-EPC-20-CIV-DRW-026 LIGHTING PROTECTION FOUNDATION PLAN AND
26
SECTION
Footing
Concrete m3 0,68
Reinforcement Bar kg 78,77
Formwork m 2
1,8
Pedestal
Concrete m3 0,38
Reinforcement Bar kg 51,06
Formwork m 2
3
27 SNBP-EPC-20-CIV-DRW-027 LIGHTING POLE FOUNDATION PLAN AND SECTION
Footing
Concrete m3 0,3
Reinforcement Bar kg 40,55
Formwork m2 1,2
Pedestal
Concrete m3 0,38
Reinforcement Bar kg 51,06
Formwork m 2 3,00
SNBP-EPC-20-CIV-DRW-030 WIND SHOCK & FLAG POLE FOUNDATION PLAN AND
28
SECTION
Footing
Concrete m3 0,12
Reinforcement Bar kg 27,11
Formwork m 2
1,35
Pedestal
Concrete m3 0,38
Reinforcement Bar kg 51,06
Formwork m2 3,00
29 SNBP-EPC-20-CIV-DRW-033 FIRE WATER SYSTEM FOUNDATION
Slab
Concrete m3 0,18
Reinforcement Bar kg 19,21
Formwork m2 1,17
30 SNBP-EPC-20-CIV-DRW-035 MISCELLANEOUS DRAWING
Footing
Concrete m3 0,24
JASA PERANCANGAN, PENGADAAN, DAN
KONSTRUKSI PEMBANGUNAN PIPA GAS
SENIPAH – BALIKPAPAN