BETON K-175 (UKURAN BOX CULVERT SINGLE 1,5 M X 1,5 M - 6 M)

GALIAN TANAH CADAS

1,8 M
0,30 M

6,00 M

VOLUME = 1.80 M' X 6.00 M'


= 3.24 M3
ANALISA PEKERJAAN GALIAN TANAH DAN PENGURUGAN

A.2.3.1.5. Penggalian 1m3 Tanah Cadas Sedalam 1m


1.500 OH Pekerja Rp 120,000.00
0.060 OH Mandor
1,8 M

A.3.2.1.9. Pemasangan 1m3 batu kosong


1.500 OH Pekerja Rp 120,000
0.060 OH Tukang Rp 150,000
1.200 m3 Batu Belah
X 0.30 M' 0.432 m3 Pasir Urug
RINCIAN HARGA SATUAN BERDASAR VOLUME

Volume : 3.24 M3
Rp 180,000.00 4.860 OH

Rp 180,000.00

Volume :
Rp 180,000.00
Rp 9,000.00

Rp 189,000.00
BACK UP DATA QUANTITY
NAMA KEGIATAN
LOKASI

A. Plat Beton

0,25 M 1,5 M 0,25 M Volume I = Panjang x Lebar x Tebal x Jumlah


= 2.00 x 6.00 x 0.25 x 2.00
= 6.00 M3
I 0,25 M

Volume II = Tinggi x Lebar x Tebal x Jumlah


1,5 M
II II = 2.00 x 6.00 x 0.25 x 2.00
= 6.00 M3

I 0,25 M JUMLAH A = 6.00 M3 + 6.00 M3


= 12.00 M3
Luas = 22 M2 (Plat Lantai)
Luas = 39 M2 (Dinding)

B. Siku Plat Beton


0,15 M
Volume = 0.50 x Tebal x Tebal x Jumlah x
= 0.50 x 0.15 x 0.15 x 4.00 x
0,15 M JUMLAH B = 0.27 M3

C. Dinding Sayap

JUMLAH C = 2.00 X 1.5 X 0.25 X 4.00


= 3.00 M3

1,5 M
1,5 M

D. Kreb / Leneng
(0 , 20+0 , 25 )
0,20 M Volume I = x 0 , 30 x 1,5=0 , 10 M 3
2
= 0.10 x 2.00 = 0.20 M3

0,30 M I Volume II = 0.20 x 0.25 x 1.50 = 0.08 M3

= 0.08 x 2.00 = 0.15 M3


0,20 M II
JUMLAH D = 0.20 M3 + 0.15 M3
0,25 M = 0.35 M3

Luas = 2.58 M2

E. Dinding Penahan Bawah


Panjang = 1.50 M1
Lebar = 0.40 M1
Tinggi = 0.77 M1
Jumlah = 2.00 bh (kiri dan kanan)
0,77 M
Volume = Panjang x Lebar x Tinggi x Jumlah
= 1.50 x 0.40 x 0.77 x 2.00
= 0.92 M3

0,40 M

JUMLAH VOLUME BETON K-250


= 12.00 M3 + 0.27 M3 + 3.00 M3 + 0.35 M3 + 0.92 M3
= 16.55 M3
Lebar
6.00
BACK UP DATA QUANTITY
PAKET KEGIATAN
ITEM PEKERJAAN 7.3 (1) BAJA TULANGAN
LOKASI KM

DAFTAR PENULANGAN BOX CULVERT

1. BOX CULVERT TIPE SINGLE (S 1.5/1.5)


No. Type Sketsa Diameter Ukuran (cm) Panjang Jumlah Berat per m Jumlah Berat
(mm) a b c d (cm) (Kg/m') (Kg)
Box Culvert
1. A a 16 49 49 64 24 186 128 1.578 375.69
d c
b
d
a
2. B d 16 49 49 64 24 186 128 1.578 375.69 Besi 16 751.38
Besi 12
b
Besi 10 716.11
d
1,467.49

a
3. C 10 193 17 430 62 0.616 164.23
b

4. D 10 193 17 430 62 0.616 164.23

b
b

5. E 10 600 600 96 0.616 354.82

6. F 10 43 43 124 0.616 32.85

a SUB JUMLAH 1,467.49


BACK UP DATA QUANTITY
PAKET KEGIATAN
ITEM PEKERJAAN 7.3 (1) BAJA TULANGAN
LOKASI KM

DAFTAR PENULANGAN BOX CULVERT

1. BOX CULVERT TIPE SINGLE (S 1.5/1.5)


No. Type Sketsa Diameter Ukuran (cm) Panjang Jumlah Berat per m Jumlah Berat
(mm) a b c d (cm) (Kg/m') (Kg)
Dinding Sayap (4 bh)
7. A 10 154 19 346 44 0.616 93.78

a Besi 10 1,009.90
Besi 12 0.00
Besi 16 751.38
b 1,761.28

8. B 10 177 19 422 44 0.616 114.38


b
SUB JUMLAH 208.16
variabel
Kerb ( 2 buah )
9. A a 10 15 58 33 32 148 22 0.616 20.06

b
d

10. B 10 150 150 14 0.616 12.94

SUB JUMLAH 32.99


a
Dinding Penahan Bawah (2 buah)
11. A 10 36 92 256 24 0.616 37.85

12. B 10 150 150 16 0.616 14.78

SUB JUMLAH 52.63


JUMLAH 1,761.28
a
ANALISA PERHITUNGAN DAN RAB BOXCULVERT
BOX CULVERT SINGLE 1,5 M X 1,5 M - 6M

No Uraian Analisa Volume Kebutuhan

PEKERJAAN PERSIAPAN
01.6.04 1 M² Pembersihan Lapangan
Pekerja 0.100 36.00 M² 3.600 OH
Mandor 0.050 36.00 M² 1.800 OH

01.6.08 1 M² Pasang Bowplank dan Pengukuran


Pekerja 0.100 36.00 M² 3.600 OH
Tukang Kayu 0.100 36.00 M² 3.600 OH
Kayu Balok Klas II 5/7 0.012 36.00 M² 0.432 M³
Paku 2" - 3" 0.020 36.00 M² 0.720 Kg
Kayu Papan 2/20 0.007 36.00 M² 0.252 M³

PEKERJAAN TANAH
02.6.5 1 M³ Galian tanah cadas sedalam 1 meter.
Pekerja 1.500 3.24 M³ 4.8600 OH
Mandor 1.200 3.24 M³ 3.8880 OH

02.6.9 1 M³ Urugan Kembali


Pekerja 0.300 3.24 M³ 0.9720 OH
Tanah Urug 1.200 3.24 M³ 3.8880 OH

Pekerjaan BOXCULVERT
06.6.27 1 M² Acian
PC (40 Kg) 3.250 2.58 M² 8.39 Kg
Pekerja 0.200 2.58 M² 0.52 OH
Tukang 0.100 2.58 M² 0.26 OH

07.6.13 1 M³ Beton Bertulang 1 : 3 : 6


PC (40 Kg) 8.150 Kg
Pasir beton 0.760 m3
Batu Pecah 2-3 1.029 m3
Tukang 0.270 OH
Pekerja 1.600 OH

07.6.13 1 M³ Beton Bertulang 1 : 2 : 3


PC (40 Kg) 9.600 16.547 m3 158.85 zak
Pasir beton 0.494 16.547 m3 8.18 m3
Batu Pecah 2-3 0.770 16.547 m3 12.73 m3
Tukang 0.275 16.547 hok 4.55 OH
Pekerja 1.650 16.547 hok 27.30 OH

07.6.18 1 Kg Pembesian dengan besi polos/ulir


Besi ø 10 1.050 1,010 kg 1,060 kg
Besi ø 12 1.050 - kg - kg
Besi ø 16 1.050 751 kg 789 kg
Kawat 0.015 1,761 kg 26.42 kg
Tukang Besi 0.007 1,761 hok 12.33 OH
Pekerja 0.007 1,761 hok 12.33 OH

07.6.24 Memasang 1 M² bekesting untuk plat lantai


Kayu Klas III 0.040 22 M² 0.88 m3
Paku 5cm-12 cm 0.400 22 M² 8.80 kg
Balok Kayu Klas II 0.020 22 M² 0.44 m3
Plywood 9mm 0.350 22 M² 7.70 Lbr
Pekerja 0.660 22 hok 14.52 OH
Tukang 0.330 22 hok 7.26 OH

07.6.25 Memasang 1 M² bekesting bekesting untuk Dinding


Kayu Klas III 0.030 39 M² 0.88 m3
Paku 5cm-12 cm 0.400 39 M² 15.60 kg
Balok Kayu Klas II 0.020 39 M² 0.78 m3
Plywood 9mm 0.350 39 M² 13.65 Lbr
Pekerja 0.660 39 hok 25.74 OH
Tukang 0.330 39 hok 12.87 OH

PC 159.000
Pasir 8.000
Batu Pecah 13.000
Pakerja #REF!
Tukang #REF!
Kepala Tukang #REF!
Ketua Kelompok/ Mandor #REF!
BOXCULVERT
1,5 M - 6M
Harga sat Bahan Upah Tot. Kebutuhan Bahan
(Rp) (Rp) (Rp) (Rp)

120,000 - 12,000.00
- - -
- 12,000.00 12,000.00

120,000 12,000.00
150,000 15,000.00
2,200,000 26,400.00
23,500 470.00
2,500,000 17,500.00
44,370.00 27,000.00 71,370.00

120,000 180,000.00
- -
- 180,000.00 180,000.00

150,000 - 45,000.00
20,000 - 24,000.00
- 69,000.00 69,000.00

1,875 6,093.75
120,000 24,000.00
150,000 15,000.00
6,093.75 39,000.00 45,093.75

75,000 720,000.00
280,000 138,400.00
650,000 500,259.26
150,000 41,250.00
120,000 198,000.00
1,358,659.26 239,250.00 1,597,909.26

15,625 16,406.25
15,625 16,406.25
15,625 16,406.25
14,000 210.00
150,000 1,050.00
120,000 840.00
Besi 10 16,616.25 1,890.00 18,506.25
Besi 16 16,616.25 1,890.00 18,506.25

18,000 720.00
20,000 8,000.00
30,000 600.00
165,000 57,750.00
120,000 79,200.00
150,000 49,500.00
67,070.00 128,700.00 195,770.00

18,000 540.00
20,000 8,000.00
30,000 600.00
165,000 57,750.00
120,000 79,200.00
150,000 49,500.00
66,890.00 128,700.00 195,590.00

TOTAL
Tot. Kebutuhan Upah
(Rp)
RENCANA ANGGARAN BIAYA
BIDANG : PEMBANGUNAN DESA
KEGIATAN : BOX CULVERT
LOKASI : DESA SEBUNGSU KEC. TUALAN HULU
TAHUN : 2019

Volume
No. Uraian Pekerjaan Analisa
Satuan
a b c d
1 PEKERJAAN PENDAHULUAN
- Papan Nama Kegiatan Ls 2.000 Bh
- Pembersihan Lapangan 01.6.04 36.000 M²
- Biaya Pengukuran dan Pas. Bowplank 01.6.08 36.000 M²

JUMLAH
2 PEKERJAAN TANAH
- Pek. Galian 02.6.5 3.240 M³
- Pek. Urugan Kembali 02.6.9 3.240 M³

JUMLAH
3 PEKERJAAN BOXCULVERT
a. Pengecoran Beton Campuran 1:2:3 07.6.13 16.547 M³
b. Begesting
Plat Lantai 07.6.24 22.000 M²
Dinding 07.6.25 39.000 M²
c. Pembesian
Besi 10 07.6.18 1,009.895 Kg
Besi 16 07.6.18 751.380 Kg
JUMLAH

REKAPITULASI FISIK

NO. JENIS PEKERJAAN

1 PEKERJAAN PENDAHULUAN ..........................................


2 PEKERJAAN TANAH ..........................................
3 PEKERJAAN BOXCULVERT ..........................................
4 TPK (Input berdasarkan kebutuhan tiap desa)
5 Biaya Desain dan RAB (Kader Teknik dlm Bentuk HOK)
JUMLAH :
DIBULATKAN :
TERBILANG :

Desa Luwuk Sampun


Harga Satuan Jumlah Biaya
(Rp.) (Rp.)
e f

150,000.00 300,000.00
12,000.00 432,000.00
71,370.00 2,569,320.00

3,301,320.00

180,000.00 583,200.00
69,000.00 223,560.00

806,760.00

1,597,909.26 26,439,805.56

195,770.00 4,306,940.00
195,590.00 7,628,010.00

18,506.25 18,689,370.08
18,506.25 13,905,235.01
30,624,320.08

JUMLAH BIAYA

3,301,320.00
806,760.00
30,624,320.08

34,732,400.08 31,431,080.08
34,732,000.00
100,000,000.00
(65,268,000.00)
19.845
Dibuat Oleh
Desa Luwuk Sampun
DAFTAR HARGA SATUAN UNTUK PERENCANAAN
BAHAN - UPAH - ALAT

No J E N I S VOL SATUAN HARGA

A BAHAN
1 Batu Belah gunung 1 m3 Rp 500,000
2 Pasir Pasang/Urug 1 m3 Rp 280,000
3 Tanah Urug 1 m3 Rp 95,000
4 Batu Pecah/Kerikil untuk Cor 1 m3 Rp 650,000
5 Semen Gresik 40 Kg 1 Sak Rp 75,000
6 Kayu Klas II 5/7 1 m3 Rp 2,200,000
7 Kayu Klas III 1 m3 Rp 1,800,000
8 Papan Kayu II 2/20 1 m3 Rp 2,500,000
9 Penerangan Jalan Umum 1 Unit Rp 44,225,000
10 Biaya Pemasangan Penerangan Jalan Umum 1 Unit Rp 2,200,000
11 Besi ø 10 1 Kg Rp 18,625
12 Besi ø 12 1 Kg Rp 18,250
13 Besi ø 16 1 Kg Rp 18,625
14 Kawat Bendrat 1 Kg Rp 24,375
15 Paku 1 Kg Rp 23,500
16 Pagar Jembatan Besi 2,5" 1 m' Rp 550,000

B UPAH
1 Tukang 1 OH Rp 150,000
2 Pekerja 1 OH Rp 120,000
C ALAT / PERLENGKAPAN KERJA
1 Cangkul 1 bh Rp 70,000
2 Ganco 1 bh Rp 60,000
3 Sekop 1 bh Rp 70,000
4 Keranjang 1 bh Rp 20,000
5 Ember 1 bh Rp 15,000
6 Benang 20meter 1 rol Rp 15,000
7 Gerobak Dorong 1 bh Rp 500,000
8 Papan Proyek 1 bh Rp 150,000
9 Sewa Exavator 1 hari Rp 400,000
10 Mobilisasi + Demobilisasi Exavator 2 Ls Rp 1,000,000
11 Kuas 1 bh Rp 20,000
12 Meteran 5 m' 1 bh Rp 45,000
13 Slang timbangan 20 Meter 1 bh Rp 2,000
14 Terpal (4 x 6 ) meter 1 Ls Rp 100,000

Tiron

KETUA TPK
Mushoin
CANAAN

Keterangan

Volume Pembulatan
Terima di tempat Batu Belah gunung #REF! 20 m3
Terima di tempat Pasir Pasang/Urug #REF! 30 m3
Terima di tempat Tanah Urug #REF! 60 m3
Terima di tempat Batu Pecah/Kerikil #REF! 30 m3
Terima di tempat Semen Gresik 40 Kg #REF! 519 Zak
Terima di tempat Kayu Klas II 5/7 #REF! 702 btg
Terima di tempat
Terima di tempat Papan Kayu II 2/20 #REF! 61 btg
Terima di tempat Penerangan Jalan Umum 2.0000 2 Unit
Terima di tempat Biaya Pemasangan Penerangan 2.0000 2 Unit
Terima di tempat Besi ø 10 #REF! 210 btg
Terima di tempat Besi ø 12 #REF! 43 btg
Terima di tempat Besi ø 16 #REF! 52 btg
Terima di tempat Kawat Bendrat #REF! 43 Kg
Terima di tempat Paku #REF! 164 Kg
Pagar Jembatan Besi 2,5" #REF! 2 btg

Pekerja Lokal Tukang #REF! 188 OH


Pekerja Lokal Pekerja #REF! 410 OH

Cangkul 5.0000 5 Bh
Ganco 2.0000 2 Bh
Sekop 4.0000 4 Bh
Keranjang 10.0000 10 Bh
Ember 20.0000 20 Bh
Benang 20meter 2.0000 2 Rol
Gerobak Dorong 4.0000 4 Bh
Papan Proyek 3.0000 4 Bh
Sewa Exavator 1.0000 6 Hari
Mobilisasi + Demobilisasi Exava 2.0000 2 Kali
Kuas 4.0000 4 Bh
Meteran 5 m' 1.0000 1 Bh
Slang timbangan 20 Meter 20.0000 20 M
Terpal (4 x 6 ) meter 2.0000 2 Bh

;__________________

KETUA TPK
Mushoin
Satuan Total
Rp 500,000 Rp 10,000,000
Rp 280,000 Rp 8,400,000
Rp 95,000 Rp 5,700,000
Rp 650,000 Rp 19,500,000
Rp 75,000 Rp 38,925,000
Rp 30,000 Rp 21,060,000 Rp 27,778 71.42857 #REF!

Rp 35,000 Rp 2,135,000 Rp 32,258 62.5 #REF!


Rp 44,225,000 Rp 88,450,000
Rp 2,200,000 Rp 4,400,000
Rp 105,000 Rp 22,050,000 6.51 #REF! 101,719
Rp 150,000 Rp 6,450,000 9.32 #REF! 145,648
Rp 375,000 Rp 19,500,000 23.37 #REF! 365,132
Rp 24,375 Rp 1,048,125
Rp 23,500 Rp 3,854,000
Rp 550,000 Rp 1,100,000

Rp 150,000 Rp 28,200,000
Rp 120,000 Rp 49,200,000 Rp 77,400,000

Rp 70,000 Rp 350,000
Rp 60,000 Rp 120,000
Rp 70,000 Rp 280,000
Rp 20,000 Rp 200,000
Rp 15,000 Rp 300,000
Rp 15,000 Rp 30,000
Rp 500,000 Rp 2,000,000
Rp 150,000 Rp 600,000
Rp 400,000 Rp 2,400,000
Rp 1,000,000 Rp 2,000,000
Rp 20,000 Rp 80,000
Rp 45,000 Rp 45,000
Rp 3,000 Rp 60,000
Rp 100,000 Rp 200,000

Rp 338,637,125 Rp 10,159,114