QUOTATION
Dear Sir,
With reference to the above subject we are pleased to give you our best price. We thank you for providing us the
opportunity to submit the quotation.
SN WORK SCOPE UNIT RATE QUANTITY TOTAL
1 FABRICATION WORK WITH PRIMER KG 30 463MT 13890000
2 STRUCTURE ERECTION WORK KG 13 463MT 6019000
3 SHEETING WORK SQ/M 220 11500 2530000
4 MATERIAL TRANSPORTATION KG 1 463MT 463000
TOTAL RS 22902000
NOTE:-
a) During Fabrication 2 hydra will be needed and during jointing 2 crane( 80 ton) will be needed.
b) During erection need 3 crane(80 ton)
Terms and Condition:-
1) Quotation validity is for 1 month.
2) 25% advance payment with order confirmation and balance payment as per site working
progress.
3) Apart from the above scope of work if we do any other work, then we will charge money
separately for that.
4) GST will be applicable.
Mr R k Tiwari
Mob: +919871246471
Email:info@sankalpengg.com