STP For Mapping Building Wiring
STP For Mapping Building Wiring
STP For Mapping Building Wiring
You now need to find out where the wire from each MCB
is going. Start by assign a number to each circuit
breaker on the main service panel.
4. Repeat steps (a) to (c), till all the Use dashed lines for
switchboards are numbered light loads.
On your diagram, trace a line from the
switchboard to the MCB for each numbered tag
Circuit 2&3
Step C r i t e r i a : Operating/ ü/û
Safety/Quality
Circuit 4&5