16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 Installation
a. Outside Installation
- Install Service Platform
- Install Roof Cover
- Install Evaporative Cooler
b. Inside Installation
- Install Hanger/Support Duct
- Install Duct and Diffuser
3 Electrical Works
- Power Cable for Cooler
4 Test Run

Final Site Inspection Plumbing Work


Material and Fabrication Electrical Work
Project: PT. Asian Isuzu Casting Center
Delivery Test Run
Date: 09 Mei 2022
Outside Installation
Inside Installation