10 Nov 2017 - Weekly Site Mgt. Joint Inspection - Result
10 Nov 2017 - Weekly Site Mgt. Joint Inspection - Result
10 Nov 2017 - Weekly Site Mgt. Joint Inspection - Result
RESULT
(Mech) LDY - 8 & 10 10 November 2017 – 08:30 ~ 09:30
No Date Location Observations Photos Subcon Photo Post Action Photo Status
required
2 Nov ground. An undue rust formation JEL muddy ground and/or ACTION
LDY- 8
2017 potential. 2. Expedite construction of drainage ditch
accumulations.
HAZARDOUS MATERIALS
NO partition wall
6 Nov cable secured on to rebar by JEL 2. DO NOT USE Conductive material to ACTION
LDY - 8
2017 tie-wire. secure electrical cables.
short circuits
7 Nov installation above ground near to JEL operation…(somewhere along the ACTION
LDY - 8
2017 operational area. i.e. material perimeter drainage ditch, so as not to
unloading/storage. A potential of be exposed to mechanical contact
being hit during material handling damage during material movements
UNSAFE CONDITION
10 Generator shed with dilapidated 1. Remove dangling piece and fix the
9 Nov corrugated GI sheets in a verge of JEL roof ACTION
LDY - 8
2017 falling off, scattered materials around 2. Upgrade house-keeping
left not attended.
FIRE PREVENTION / PROTECTION
12 Nov protection to isolate live internal parts JEL - ALWAYS lock the panel cover to ACTION
LDY - 8
2017 and termination points. avoid illegal tapping by
by anybody
Nov Access cable installed on an unstable scaffold JEL Advise BTG on schedule and method ACTION
13 2017 Road pipe and in a verge to collapse. statement of the activity for onwards
REQUIRED Partners.
Signs
ACCESS / EGRESS
15 Nov access-way leading to LDY 10 working JEL PROVIDE PROPER ACCESS FOR ACTION
LDY-10
2017 areas PERSONNEL USING THIS
A FALL of person hazard PASSAGE WAY
(especially when wet)
Nov Welding identified. JEL - SMOKING AREA sign posting needed ACTION
18 2017 Training NO Stand-by Fire extinguisher
Area
TEMPORARY ELECTRICS
Nov Welding negating its purpose not to allow anybody IN-CHARGE OF ELECTRICAL PANEL ACTION
21 2017 Training to open this panel without authority. JEL KEYS
22 Nov Welding used as load bearing ledger. JEL immediately to deal with scafffolding ACTION
2017 Training Indication of no qualified scaffolder activity.
General Comments:
- Emphasized that Crane Operators should not sit on crane track (unsafe act) and NOT to allow to rest near and around
- Electrical lockout should be complied if working on electricity. Procedure to send out soon.
- Upgrade “housekeeping” at LDY-9 and 10 and conduct cleaning at work areas daily.
- Trash bins should be provided where necessary, so as not too scatter garbage out of control.
- Several workers at both LDY 9 and 10 not wearing safety glasses or having NONE at all.
17 Nov. 2017 – 08:30 hrs. @ Turbine Gen. #2 ---- Assy. Area: TNJO Rest Shelter U-2