Weekly Site Management Joint Walkthrough

RESULT
(Mech) LDY - 8 & 10 10 November 2017 – 08:30 ~ 09:30
No Date Location Observations Photos Subcon Photo Post Action Photo Status

HOUSEKEEPING Install / Provide

Shelter at this area used as 1. Proper ash-tray w/ fire extinguisher


LDY- 8
10 Smoking, Rest and Eating. Fruit JEL (water bucket is acceptable) ACTION
1
Nov Shelter peelings scattered not collected, No 2. Trash bin

2017 Area fire extinguisher, NO trash-bin Cleaning up around the area

required

MATERIAL MANAGEMENT Material quality preservation required.


10 Ducting materials on muddy 1. Raise these materials up and off

2 Nov ground. An undue rust formation JEL muddy ground and/or ACTION
LDY- 8
2017 potential. 2. Expedite construction of drainage ditch

inside LDY perimeter to reduce water

accumulations.

Personal Protective Eqpt. (PPE) Issue eye protection to all personnel


10 Most personnel working in the area and HSE staffs and Works
Nov not wearing eye protection and not JEL Supervisors to strictly implement ACTION
LDY- 8
3 2017 wearing working gloves. usage, before any eye injury occurs
due to of not putting on eye protection

HAZARDOUS MATERIALS

10 Compressed gas cylinders mixed in RECTIFICATION against each


4 Nov storage shed. JEL observation REQUIRED ACTION
LDY - 8
2017 NO safety sign markings a.m.

NOT identified (Oxygen/Acetylene)

NO partition wall

NOT marked (Full or Empty)


UNSAFE CONDITION

10 Tie-wired Plywood sheets used as Replace with suitable roofing


5 Nov roofing materials for the rest shelter. JEL material i.e. Tarpaulin or similar ACTION
LDY - 8
2017 A hazard of hitting somebody when time material that cannot cause injury
comes out of its deterioration. when blown off or if fallen off

UNSAFE PRACTICE 1. Assign a qualified Electrician to do the

10 Main temporary electrical supply job

6 Nov cable secured on to rebar by JEL 2. DO NOT USE Conductive material to ACTION
LDY - 8
2017 tie-wire. secure electrical cables.

PLASTIC instead to avoid electrical

short circuits

UNSAFE CONDITION Relocate this main power cable away


10 Main electrical supply cable from active areas of

7 Nov installation above ground near to JEL operation…(somewhere along the ACTION
LDY - 8
2017 operational area. i.e. material perimeter drainage ditch, so as not to
unloading/storage. A potential of be exposed to mechanical contact
being hit during material handling damage during material movements

TEMPORARY ELECTRICS - Provide suitable base support to


10 Panel Distribution board (top heavy) its reinforce stability.
8 Nov height is more than its base dimension. JEL - Install Indicator device if “live’ or ACTION
LDY - 8
2017 - A toppling hazard. not
- No indication if “LIVE” or not. - Install safety “Warning Signs”
- No Safety Warning signs

UNSAFE CONDITION

10 Generator shed with dilapidated 1. Remove dangling piece and fix the
9 Nov corrugated GI sheets in a verge of JEL roof ACTION
LDY - 8
2017 falling off, scattered materials around 2. Upgrade house-keeping
left not attended.
FIRE PREVENTION / PROTECTION

10 Fire extinguisher directly placed on the Elevate this fire extinguisher


10 Nov ground. An undue rust/ corrosion on its JEL “off-ground” and install fire ACTION
LDY - 8
2017 bottom side potential. No inspection extinguisher sign with corresponding
monthly inspection tag. cylinder number and Inspection tag.

TEMPORARY ELECTRICS - Provide suitable base support to


10 Panel Distribution board (top heavy) its reinforce stability.
Nov height is more than its base dimension. JEL - Install Indicator device if “live’ or
LDY - 8
11 2017 - A toppling hazard. not ACTION
- No indication if “LIVE” or not. - Install safety “Warning Signs”
No Safety Warning signs

TEMPORARY ELECTRICS - Install transparent plastic board


10 Electrical Panel Board no “plexi-glass” in-front of live parts of the panel.

12 Nov protection to isolate live internal parts JEL - ALWAYS lock the panel cover to ACTION
LDY - 8
2017 and termination points. avoid illegal tapping by

NOT positively locked! Can be opened un-authorized person

by anybody

TEMPORARY ELECTRICS HAVE THIS MAIN SUPPLY CABLE


LDY- 8
09 Overhead electrical power main supply PROPERLY BURIED UNDERGROUND.

Nov Access cable installed on an unstable scaffold JEL Advise BTG on schedule and method ACTION
13 2017 Road pipe and in a verge to collapse. statement of the activity for onwards

Eastside IMMEDIATE RECTIFICATION information sharing with Construction

REQUIRED Partners.

HAZARDOUS MATL / FIRE PREVENTION

09 - Fire extinguisher directly placed on RECTIFICATION AGAINST ALL

14 Nov the ground. JEL MENTIONED ACTION


LDY- 8
2017 - Mixed compressed gas cylinders OBSERVATIONS…REQUIRED

- Absence of Warning / Identification

Signs
ACCESS / EGRESS

10 NO proper means of main common

15 Nov access-way leading to LDY 10 working JEL PROVIDE PROPER ACCESS FOR ACTION
LDY-10
2017 areas PERSONNEL USING THIS
A FALL of person hazard PASSAGE WAY
(especially when wet)

LIFTING MATL/ EQUIPMENT

10 Wire rope sling left on the Practice proper construction lifting


16 Nov LDY-10 ground unattended, exposed to JEL equipment and material storage. ACTION
2017 rust formation and improper HAVE this kept in material store
storage of lifting material for proper storage

HOUSEKEEPING / Fire Prevention

10 LDY-10 Trash drums overfilled with Regular garbage collection and


17 Nov Welding garbage beside smoking shelter JEL disposal required ACTION
2017 Training constitute a fire hazard at this
Area location

FIRE PREVENTION / PROTECTION - Proper ash-tray w/ fire extinguisher


10 LDY-10 Rest and Smoking shelter not required.(water bucket is acceptable)

Nov Welding identified. JEL - SMOKING AREA sign posting needed ACTION
18 2017 Training NO Stand-by Fire extinguisher
Area

TEMPORARY ELECTRICS

10 LDY-10 Tie wires used to secure and


19 Nov Welding suspend electrical power ACTION
2017 Training cables. UNSAFE PRACTICE.
Area Use of non-conductive material
recommended
Fire Prevention / Protection

LDY-10 - Fire extinguisher directly Elevate this fire extinguisher


20 10 Welding placed on the ground. “off-ground” and install fire ACTION
Nov Training - NO Inspection tag extinguisher sign with corresponding
2017 Area cylinder number and Inspection tag.

TEMPORARY ELECTRICS ONLY AUTHORIZED ELECTRICAL

10 LDY-10 - Electrical panel key left in key-hole, MAINTENANCE PERSON SHOULD BE

Nov Welding negating its purpose not to allow anybody IN-CHARGE OF ELECTRICAL PANEL ACTION
21 2017 Training to open this panel without authority. JEL KEYS

Area - NO Voltage marking (Octavianus)


- NO name of person in-charge

SCAFFOLDING This item was previously addressed.

10 LDY-10 Diagonal bracing of H-frame scaffold JEL to assign qualified scaffolder

22 Nov Welding used as load bearing ledger. JEL immediately to deal with scafffolding ACTION
2017 Training Indication of no qualified scaffolder activity.

Area assigned to build/erect scaffolding. DUE DATE; w/in this month.

General Comments:

MR. KOJI IWASAKI (BTG Division SM)

- Emphasized that Crane Operators should not sit on crane track (unsafe act) and NOT to allow to rest near and around

the crane’s body or around its vicinity.

- Electrical lockout should be complied if working on electricity. Procedure to send out soon.

MR. SAIFUL ULYA (TNJO Deputy PM)

- Upgrade “housekeeping” at LDY-9 and 10 and conduct cleaning at work areas daily.

- Trash bins should be provided where necessary, so as not too scatter garbage out of control.

MR. CHRIS VIAJE (BTG Mech SV)

- Several workers at both LDY 9 and 10 not wearing safety glasses or having NONE at all.

Provision of the required PPE to all workers at the earliest required.

THE NEXT JOINT SITE MGT SAFETY INSPECTION WILL BE ON:

17 Nov. 2017 – 08:30 hrs. @ Turbine Gen. #2 ---- Assy. Area: TNJO Rest Shelter U-2