Tasks Details:-
S.No Task Description of Qty Units Rate Labour Skilled/ Material Total Person
Code Item/Task (Rs) component Semi Skilled Cost (Rs) Cost (Rs) Days
(Rs) component
(Rs)
I certify that,I have inspected the work/project site on ........................... date and found the specifications and quantities provided in the
estimate are correct, appropriate and as per the standards and purposefulness of the proposed asset/work.Based on my visit, I am
according technical approval for Rs.193121/-
I certify that, I am responsible for proper preparation of estimate and the estimate is technically approved for Rs.193121/- , with
technical approval number 03/NA/038/2019-2020 dated...........................
I abide to be punished if estimates are found with deviations above 10%.
Name of the technical approval authority: Designation of the technical approval authority:
Diagram:-
Expected income to be accrued per annum out of the asset after creation (in Rs):1000/-
Input Details :-
1 BoysStrength 40
2 GirlsStrength 30
3 School ghanapurschool
4 Schooltype Primary school
Designation of the official filling the details: Name of the Cluster Technical Assistant:
Signature: Signature:
Date: Date:
Certified that the information on land development proposed is correct for the WorkCode: 152032803003170632
Signature: Signature: