Client Telengana 

State Power Generation Corporation limited
Project 5x800MW Yadadri TPS, Nalgonda
Cotractor/Vendor BHEL , PEM
Drawing No. PE‐DG‐417‐509‐E001
Title Below Ground earthmat Layout in Main Plant Area

Sl. No. Item/clause/ Page No. TCE Comments  Dt. 25.05.2019 BHEL Reply Dt.16.07.2019 TCE/TSGENCO's comment Dt 23‐7‐19 on rev.01 BHEL Reply Dt.26.07.2019

General 21M space  space between the two conductors is based on the  Noted and spacing b/w conductors has been revised in line  As per document Design Memorandum of Grounding  Noted and accordingly the drawing is 


touch and step potential values obtained through E Tap study  with revised design memorandum. System (PE‐DC‐417‐509‐E002) the spacing assumed for  being updated with 10m spacing.
submitted by you earlier along with design memorandum for the  touch ad step potential is 10M. This drawing is made for 
earthing. We have indicated our comments on the study in respect  10.5 M. Please revise.
of the inputs considered which will have implications on the spacing 
1
between conductors. The drawing shall reflect the revised spacings. 
Kindly revise the study based onour observations and based on the 
finalised result this drawing shall be made.

This drawing being the underground earth mat drawing mainly  For detailed connection and size to individual equipment  Noted. Issue Closed.


showing the grid, earth electrodes,  risers to ground level for  "Typical Below and Above ground earthing details", dwg. 
equipment earthing and building grid interconnections, We  No. PE‐DG‐417‐509‐E004 and E005 shall be referred. This 
presume that  area/ building wise detailed drawings showing all the  drawing shown is schematic and is read by site in 
connections, sizes to individual equipment, local grid etc.,  will be  conjunction with Design Memorandum of Grounding 
prepared and furnished System (PE‐DC‐417‐509‐E002) and above two mentioned 
2 General drawings Above and Below Ground Typical Details for 
further detailing. Further for Offsite areas not covered 
under this main plant drawing seprate Earthmat Drawing 
shall be followed.

Connection from the mat shall be shown to interconnect the grids  Pls. note in Swgr Rooms of TG Building and Other Building  Noted.  However risers is not shown uniformly for all  Noted and acoordingly the drawing is 


to be made within the buildings and areas like pump areas, (eg., ash  Like Pump House area embedded sub mat shall be  buildings/structures. Foe eg., it is shown for ESP control  being updated. However, pls. note the 
related, FGD related etc,). Though the minimum is two, it shall be  provided (Refer Sl. No 3.1.1 of Design Memorandum of  room , ASPH, but for eg., it is not shown for AHP  Earthing System shown is schematic. 
liberally enhanced based on the size of the building. Grounding System (PE‐DC‐417‐509‐E002) which in turn  compressor. (Symbol with arrow head) Exact location shall be determined by site 
shall be connected to Below Ground at two ends through  Please check drawing thoroughly and indicate uniformly for  keeping in view of the note no. 9, 10 and 
3 General risers along column and riser slong columns already  all buildings and structures.  12. Further for complete installation 
shown.  details Typical Below Ground and Above 
Ground Detail Dwgs and a uniform 
philosophy as per the Design 
Memorandum shall be followed at site.

Grid around the building is not shown for certain buildings (eg,  Noted and incoprporated in the revised drawing. Please see FGD MCC/swgear and control building. It is still  Noted and incorporated in the revised 


4 General vacuum pump house) not incorporated. drawing.

Interconnection points with test pit  to coal handling system, farther  Noted and incorporated connection to CHP and AHP with  Noted. Issue Closed.


ash handling related buildings may please be shown. Please clarify  test pit. Pls. note isolation of CHP, AHP is generally 
how the isolation of CH plant system grid  is effected  for earth  provided so that individual earthing system of these 
resistance measurement purpose, while CHP  is partially inside the  auxiliaries areas like CHP, AHP can be checked i.e without 
main plant area and connected to that grid. connecting the same to main plant whether their indivial 
earth resistance is within 1 ohm, however after testing of 
the same connecting these auxilaiary earthing system to 
5 General the main plant is always beneficial for both system as it 
gives more harmony to both system because two 
resistance connected in parallel will always lead to 
resistance which is lesser than both individually.
Chimney's  buried grid interconnections to the main plant earth mat  Pls. note as per the Technical Specification all Lightning  Noted Issue Closed.
may be made through test pits (as many interconnections as  Protection Downcomers are connected to the dedicated 
downcomers). ground electrodes through isolating links and then to the 
grounding system. The same is replicated and accepted in 
6 General the Design Memorandum of Grounding System (PE‐DC‐
417‐509‐E002). The same shall be covered in detailed 
Lightning Protection Drawing of Chimney which shall be 
furnished seprately by Chimney vendor.

Interconnection or isolation of the electronic eathing after their  Noted. Closed Issue Closed.


earth electrodes  from/to main earth mat shall be as per the 
7 General recommendation of PLC/DCS suppliers. Kindly follow their 
requirement.

Note 11  states the leads from neutral of the transformers are  to  Pls. note it is already listed explicitly in the Design  Noted Issue Closed.


be directly connected to test pits, whereas elsewhere term used is  Memorandum for Earthing System PE‐DC‐417‐509‐E002 
treated earth pit. These two are with different detailing  in your  (refer Sh. 3, 4 & 5 of 72: Sl.no 2.1.5, 2.1.6, 3.1.2, 3.1.3 and 
below grade earthing details.  Please make it uniform.  Similar for  3.1.6). Further, note no. 11 is also updated accordingly.
lightning arrester earth electrodes. We suggest for clarity to all 
concerned the design memorandums for earthing and lightning 
8 Note 11 protection can show a consolidated table indicating the type of 
earth electrode for each service (for ex., trf neutral, PTs/CVTs, NGR, 
LA, lightning protection downcomers, trench cable rack/trays, 
outside cableracks, street lighting, electronic earthing and any other 
service where it is used)

In TG building and some of the areas there could be deep  Pls. note the Earthing System shown is schematic. Exact  Noted Issue Closed.


foundations, pits where the conductor is shown diagrammatically  location shall be determined by site keeping in view of the 
going through it.  note no. 9, 10 and 12. Further for complete installation 
9
details Typical Below Ground and Above Ground Detail 
Dwgs shall be referred.

Earth mat conductors are laid below TG pedastal as per drawing.   Noted. Closed Issue Closed.


Kindly ensure that the earthing work is planned and  taken up to 
10 Note 9
suit civil work schedule .

The drawing does not indicate the continuation of the earth mat  Area in main power house has been covered in this  Noted. BHEL shall be ensure that the system of uniform grid  Pls. note BG Earthmat below AHP 


below the AHP buildingss, compressor house,canteen( Owner 's  drawing, earth mat below the AHP buildingss, compressor  as done in the rest of the area of main power house shall be  Building, Compressor House, Canteen, 
building ), transfer points, FGD building. Please clarify. For  house,canteen( Owner 's building ), transfer points, FGD  followed by other units also. Transfer Points, FGD Buildings are already 
uniformity it is preferred to follow same philosophy. building shall be submitted separately by respective BHEL‐ covered in this Main Plant Area dwg only. 
Units. For the SWYD area, CHP area seprate dwg 
11 Note 9 shall be furnished seprately by other BHEL 
units TBEM and ISG repspectively as per 
their respective design document 
furnished by them seprately.

General Kindly ensure all the revisions resulting from the points raised on  Noted. Noted and  closed. Issue Closed.


other   earthing documents reviewed so far are taken care in this 
12
document.