Professional Documents
Culture Documents
Invoice Sering Ukay 2022
Invoice Sering Ukay 2022
Customer
Unit Price
No Description Qty TOTAL (RM)
(RM)
HOUSE MAINTENANCE IN SERING UKAY
GROUND FLOOR
1 LIVING AREA
1.1 Install lighting application 5 22.00 110.00
1.2 Cable organiser 1 16.00 16.00
2 Dining Area
2.1 Install lighting application 3 22.00 66.00
3 Store
3.1 Install lighting application 1 22.00 22.00
FIRST FLOOR
4 Master Bedroom
4.1 Install lighting application 4 22.00 88.00
4.2 Hacking Aircond copper pipe 1 60.00 60.00
4.3 Reassemble Aircond 1.5hp 1 100.00 100.00
5 Toilet
5.1 Install lighting application 2 22.00 44.00
6 Room 1
6.1 Install lighting application 2 22.00 44.00
7 Rooftop
7.1 Reassemble Astro antenna 1 25.00 25.00
8 Kitchen Area
8.1 Water sink clogged 1 25.00 25.00
______________ _______________
NAIM SISWAZAIR MOHD FARID