Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Check material cabinet?

- SS and IP55, no issue from YIN to supply.


- Segretation Analog and Digital shall shall be install HVAC.
be applied.
- The cabinet shall be front and rear. cann't meet with IP55, due to
humadity will effect moisture
inside the panel.

it is not correct, and have limitation


connection in the controller (max 2
hop, 14 node including CPU node)

24 VDC power supply, voltage drop to be consider.

- Confirm the distance RIO from FAR, it shall be more than 1200 m.
- Confirm about signal segregation for Analog and Digital, the segregation for DCS/FGS/SIS
- Reliability and maintenance.
- Environment (HVAC, protect from water, sun)
- Terminal Board connect to the IO module. --> short KS cable or direct to terminal.
- 24 VDC power supply for Terminal Board. --> Voltage drop.
- Hardware --> G3 coated from ICSS hardware, 3rd party hardware. extended temp required from 50 to 70 degC (cost will
increase)
- SIS --> in remote node site, it must use slot 7 & 8 for FO module communication.
what the brand?

You might also like