Professional Documents
Culture Documents
Bor Log - BH 22
Bor Log - BH 22
Bor Log - BH 22
Tipe
Grup Simbol
Weathering
N-SPT N-SPT (Jumlah Pukulan)
RQD (%)
GWL (m)
TCR (%)
Tanggal
Sampel
Litologi
UDS
SPT
N1 N2 N3 NSPT
1,0 1,0
gambut sisipan kayu, coklat tua, lunak
1 2 4
2,0 6 2,0
15 15 15
3,0 3,0
2 2 3
4,0 5 4,0
15 15 15
5,0 5,0
lempung lanau, abu-abu, lunak
2 3 3
6,0 6 6,0
15 15 15
08112022
7,0 7,0
2 3 5
8,0 8 8,0
15 15 15
lempung sedikit pasir, kuning, lunak
9,0 9,0
5 8 11
0.50 m
10,0 19 10,0
15 15 15
pasir, putih, lepas
11,0 11,0
9 16 19
12,0 35 12,0
15 15 15
13,0 13,0
13 19 26
14,0 45 14,0
15 15 15
lempung, coklat keabuan, sangat kaku
15,0 15,0
17 22 29
16,0 51 16,0
15 15 15
17,0 17,0
09112022
20 26 35
18,0 60 18,0
15 15 15
lempung, abu-abu kehitaman, sangat kaku
19,0 19,0
11 18 22
20,0 40 20,0
15 15 15
Remark :
: Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturbed Sample (DS)
DRILLING LOG
Proyek : jalan tol IKN segmen karangjoang - KKT karingau Halaman : 02
Lokasi : STA 17+975 Hari/Tanggal Mulai : 08-11-2022
No. Lubang Bor : BH.22 Hari/Tanggal Selesai : 09-11-2022
Sistem Koordinat : UTM Mesin Bor : Xy100
Koordinat : X 480591.669 Metode Pengeboran : Rotary Drilling
: Y 9870375.602 Drilling Master Bor : Dave
Elevasi : 113 m Logger : Dian
Kedalaman : 30 m Chek : Iwan
Kedalaman (m)
Tipe
Grup Simbol
Weathering
N-SPT N-SPT (Jumlah Pukulan)
RQD (%)
GWL (m)
TCR (%)
Tanggal
Sampel
Litologi
UDS
SPT
N1 N2 N3 NSPT
13 19 23
22,0 42 22,0
15 15 9
pasir berlanau, abu-abu muda, sangat padat
23,0 23,0
20 30 30
24,0 60 24,0
15 15 10
09112022
0.50 M
25,0 25,0
27,0 27,0
30 60
28,0 60 28,0
batu bara, hitam, keras 15 12
29,0 29,0
31,0 31,0
32,0 32,0
33,0 33,0
34,0 34,0
35,0 35,0
36,0 36,0
37,0 37,0
38,0 38,0
39,0 39,0
40,0 40,0
Remark :
: Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturbed Sample (DS)