DRILLING LOG

Proyek : jalan tol IKN segmen karangjoang - KKT karingau Halaman : 01


Lokasi : STA 17+975 Hari/Tanggal Mulai : 08-11-2022
No. Lubang Bor : BH.22 Hari/Tanggal Selesai : 09-11-2022
Sistem Koordinat : UTM Mesin Bor : Xy100
Koordinat : X 480591.669 Metode Pengeboran : Rotary Drilling
: Y 9870375.602 Drilling Master Bor : Dave
Elevasi : 113 m Logger : Dian
Kedalaman : 30 m Chek : Iwan
Kedalaman (m)

Tipe

Grup Simbol

Weathering
N-SPT N-SPT (Jumlah Pukulan)
RQD (%)
GWL (m)

TCR (%)
Tanggal

Sampel
Litologi

Deskripsi Foto Corebox

UDS
SPT
N1 N2 N3 NSPT

1,0 1,0
gambut sisipan kayu, coklat tua, lunak
1 2 4
2,0 6 2,0
15 15 15

3,0 3,0

2 2 3
4,0 5 4,0
15 15 15

5,0 5,0
lempung lanau, abu-abu, lunak
2 3 3
6,0 6 6,0
15 15 15
08­11­2022

7,0 7,0

2 3 5
8,0 8 8,0
15 15 15
lempung sedikit pasir, kuning, lunak
9,0 9,0

5 8 11
0.50 m

10,0 19 10,0
15 15 15
pasir, putih, lepas
11,0 11,0

9 16 19
12,0 35 12,0
15 15 15

13,0 13,0

13 19 26
14,0 45 14,0
15 15 15
lempung, coklat keabuan, sangat kaku
15,0 15,0

17 22 29
16,0 51 16,0
15 15 15

17,0 17,0
09­11­2022

20 26 35
18,0 60 18,0
15 15 15
lempung, abu-abu kehitaman, sangat kaku
19,0 19,0

11 18 22
20,0 40 20,0
15 15 15

Remark :

: Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturbed Sample (DS)
DRILLING LOG
Proyek : jalan tol IKN segmen karangjoang - KKT karingau Halaman : 02
Lokasi : STA 17+975 Hari/Tanggal Mulai : 08-11-2022
No. Lubang Bor : BH.22 Hari/Tanggal Selesai : 09-11-2022
Sistem Koordinat : UTM Mesin Bor : Xy100
Koordinat : X 480591.669 Metode Pengeboran : Rotary Drilling
: Y 9870375.602 Drilling Master Bor : Dave
Elevasi : 113 m Logger : Dian
Kedalaman : 30 m Chek : Iwan
Kedalaman (m)

Tipe

Grup Simbol

Weathering
N-SPT N-SPT (Jumlah Pukulan)
RQD (%)
GWL (m)

TCR (%)
Tanggal

Sampel
Litologi

Deskripsi Foto Corebox

UDS
SPT
N1 N2 N3 NSPT

pasir berlanau, abu-abu kekuningan, sangat padat


21,0 21,0

13 19 23
22,0 42 22,0
15 15 9
pasir berlanau, abu-abu muda, sangat padat
23,0 23,0

20 30 30
24,0 60 24,0
15 15 10
09­11­2022

0.50 M

25,0 25,0

lempung, abu-abu kecoklatan, sangat kaku


19 32 28
26,0 60 26,0
15 15 11

27,0 27,0

30 60
28,0 60 28,0
batu bara, hitam, keras 15 12

29,0 29,0

lempung, abu-abu tua, sangat kaku 23 39 21


30,0 60 30,0
15 10 11

31,0 31,0

32,0 32,0

33,0 33,0

34,0 34,0

35,0 35,0

36,0 36,0

37,0 37,0

38,0 38,0

39,0 39,0

40,0 40,0

Remark :

: Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturbed Sample (DS)