Professional Documents
Culture Documents
2019 LOG Logform Alicia Mate
2019 LOG Logform Alicia Mate
2019 LOG Logform Alicia Mate
4 March Emailed tutor with updated risk Moving to TMA1 part 3 3,5
assessment I will leave part 2 to the end.
Activity 8/skills audit Completed part 3/skills audit.
Revisit learning outcomes and
summary marks.
Move onto part 3.
6 March Updated project plan Can´t finish part 2, I am short of time. 3.5
Need to tidy up all parts of TMA1.
7 March
8 March Revisited my main papers My draft and notes are taking shape. 2.5
Refine methods (tma asks for detailed I need to focus and stick to my
methodology and list of materials) objectives.
9 March 4.5
11 March Wrote my methods. 4
TMA1 due tomorrow. No time during
the day. Still need to complete the
references section.
12 March Checked all documents for TMA1. 7
Problem: winzip not working, neither
winRar.
Downloaded compatible software.
Took me too much time.
Uploaded TMA1 to the System.
Have the feeling the TMA1 went quite
bad. I will wait for feedback from my
tutor.
31 March Literature search for new project idea Prepared empty water bottles and 4
perlite.
Prepared different dosages of fertilizer
for each treatment.
3 April critical reading Planted seeds, tagged each group of 4.5
select key papers replicated and added fertilizer.
Took notes about the procedure.
5 April Watch module-wide room tutorial Plants didn´t germinate. Watered again 0.5
about primary literature and critical and will wait for results.
reading
8 April Revisited project guide Kept working on project log and
Draft new objectives recording data for the experiment
10 April Updated project log Watered plants and added fertilizer to 0.5
Checked progress against my project plan each group.
12 April Checked progress against my project plan Achieved working on project guide 5
activities up to section 6.
Will carry on tomorrow
13 April Read learning outcomes for TMA2 Kept working on project guide 3
Started working on TMA2 part 1 activities.
14 April Draft title and methods Upgraded my skills audit up to date. 1.5
List of materials needed Kept searching information about
hydroponic agriculture on the internet.
15 April Completed part 2 TMA2 Updated project log. 2
Will water plants tomorrow (every two
days)
17 April Watch module-wide room tutorial Watered plants and added fertilizer to 0.5
about contextualizing the project each group.
Revisited forums Its been almost two weeks and plants
didn´t germinate yet.
Started to be worried, the estimated
time to germinate is 10 days.
19 April Updated project log All plants germinated at the same time! 0.5
Updated project plan timing Noted all observations.
20 April Completed part 3 TMA2 Made some photos and records. 0.5
Some progress here.
21 April Further literature search Made some records 0.5
24 April Contacted tutor to change project idea Watered plants and added fertilizer to 0.5
Asked for extension TMA2 each group.
Plants seem to grow at the same rate.
Still no noticeable difference in growth
rate between groups.
26 April Worked on new updated proforma Watched last tutorial. 2
Made some annotations.
Will keed watering plants every two
days (and ferlizer every 7 days) and
recording results daily.
Need to start another TMA for another
module.
31 April Send updated proforma to tutor for Watered plants and added fertilizer to 0.5
approval each group.
Looked for all material needed for the Still not noticeable difference in
experiment growth rate between groups.
3 April Update my log up to date Need to travel abroad for family
Part 5 TMA2 completed reasons.
Can´t carry on with the project.
Need to start over. Some fresh perlite
and tomato seeds left, but will have to
place a new order.
Two weeks and a half away from
home.
29 april Tidy up TMA2 and start working on part 4 I am very behind. Need to email my
tutor for an extension.
30 april Submitted TMA2 Submitted special circumstances form
with evidence.
Need to update my log
10 may I should check the project website and
tutorials.