DAILY PROGRESS REPORT


Presented in table 1.1 are corresponding the progress of ongoing activities on Block 04,
Lot no. 29-30. Currently the activity “Finishing of windows in 2 nd floor” has been completed.

Manpower Report: Block 04, Lot no. 29-30 Date: August 23, 2022
  Current Activities Manpower % Completion
1 Finishing (Window 2nd Floor) 3 100%
2 Ceiling Works 0 0%
TABLE 1.1

Presented in table 1.2 are corresponding the progress of ongoing activities on Block 06,
Lot no. 35-36. Currently the activity “Exterior Finishing” has been completed.

Manpower Report: Block 06, Lot no. 35-36 Date: August 23, 2022

Current Activities Manpower % Completion


1 Finishing (Exterior) 3 100%
2 Roof Purlin Welding 1 95%
3 Stair Framing Installation 0 75%
4 Septic Tank Installation 4 30%
TABLE 1.2

Presented in table 1.3 are corresponding the progress of ongoing activities on Block 06,
Lot no. 35-36. Currently all the activities are still ongoing with “Interior Plastering” having the
most progress out of all the activities

Manpower Report: Block 06, Lot no. 29-30 Date: August 23, 2022

Current Activities Manpower % Completion


1 Finishing (Exterior) 1 45%
2 Plastering (Interior) 7 95%
3 Stair Framing Installation 2 75%
TABLE 1.3