DRS_FGLNG-C-00-PRC-TBE-0049 l A Vendor Approval for Zenith United Electric Corporation

Multi-Purpose Jetty and Gas Receiving Facility


Document Review Sheet (DRS)

Comment Sheet No: DRS_FGLNG-C-00-PRC-TBE-0049 Revision: A

Drawing/Document No: FGLNG-C-00-PRC-TBE-0049 Revision: A

Drawing/Document Title: DRS_FGLNG-C-00-PRC-TBE-0049 l A Vendor Approval for Zenith United Electric Corporation

Drawing/Document Status: V (For Review)

Overall Review Status


A
Classification:
Date: Tuesday, December 20, 2022

These documents have been reviewed in accordance with the following guidelines:

Review Status Classification

Review Status Classification Classification Description Number of Comments

Reviewed with no Comments

A This classification authorizes the EPC Contractor to proceed with the works based on the 1
relevant documents and issue the document for construction. No further revisions are
required.
Reviewed with comments

B This classification authorizes the EPC Contractor to proceed with the works based on the 0
relevant document, subject to incorporation of the comments into the document
Compliance Submittals only.
Reviewed with clarifications
C 0
This classification denotes that information is insufficient and/or clarification is
requested.

Rejected
D 0
This classification denotes that submitted document is not acceptable and further
revisions are required.

Document not specifically reviewed or commented

E This classification denotes that a documentation is not specifically reviewed or 0


commented on but may be used as a reference document for future reviews of other
documentation.

TOTAL NUMBER OF COMMENTS 1

Comment Owner
Comment Owner Description
Owner FGEN LNG Corporation
OR Jacobs Projects (Philippines), Inc
DRS_FGLNG-C-00-PRC-TBE-0049 l A Vendor Approval for Zenith United Electric Corporation

Comment Sheet No: DRS_FGLNG-C-00-PRC-TBE-0049 Rev A


Drawing/Document No: FGLNG-C-00-PRC-TBE-0049 Rev A

Review #1 Reviewer Date: EPC Contractor Date:


Number of Document
1 A Tuesday, December 20, 2022 [INSERT]
Comments Revision:
Comment Latest Comment Reviewer Contract Review
Reviewer Comment Contractor/Supplier Comment
Item Status Owner (Initials) Reference Status
1 A OR/Owner FGEN No comments