Professional Documents
Culture Documents
Sustainable Strategy
Sustainable Strategy
01.
Management
04. Continual monitoring and recording throughout this
Transport phase will allow for an informative approach to be
taken on the next development completed and identify
The site itself provides central changes which can be made in terms of the electrical,
access to the train station, cycle water and power usage on site throughout this period.
routes, and main vehicle access
routes providing accessibility
throughout the city into
neighbouring towns.
05.
Water
A water meter will be supplied on
the mains water supply to each of
the buildings. This will ensure that
water consumption can be
SUSTAINABILITY
monitored and managed and
therefore encourage reductions. STRATEGY
To achieve a sustainable design and construction, the
commercial office spaces will be designed to achieve a
BREEAM UK New Construction (NC) 2018 ‘Excellent’ rating
08. 07.
Land Use and Ecology Waste
The landscape and public realm Communal refuse and recyclable stores will be easily
have been designed to ensure full accessible to all users, and sized to cater the segregation
utilisation of the surrounding areas. and storage of operational recyclable waste volumes by
Open green space will be provided the assessed building, its occupants and activities.
throughout the development Where organic waste is to be stored, a water outlet is
providing building users with an provided within the facility for cleaning and hygiene
aesthetically pleasing environment purpose.
to benefit from.
09. 06.
Materials
Pollution
Materials with low environmental impact
The site has been identified in will be implemented were feasible.
Flood Zone 1, confirming there Recycled, sustainable and locally sourced
to be a low risk of flooding from materials will be used where possible.
river and tidal sources.
05.
Innovation