The document compares the Bill of Quantities (BOQ), tender drawings, and construction drawings for staff residence projects. It notes differences between the drawings, such as foundation safe allowable bearing capacities of 250 kN/m2 in the tender drawings and 200 kN/m2 in the construction drawings. The construction drawings also specify the ground level at 0.60m while the tender drawings specify it at 0.75m. The document does not mention protection materials in the construction drawings that are included in the tender drawings. It provides an example ground floor plan showing the layout.
Original Description:
M M,.M/,
Original Title
Comparative Study of Drawings of AW Works (Autosaved)
The document compares the Bill of Quantities (BOQ), tender drawings, and construction drawings for staff residence projects. It notes differences between the drawings, such as foundation safe allowable bearing capacities of 250 kN/m2 in the tender drawings and 200 kN/m2 in the construction drawings. The construction drawings also specify the ground level at 0.60m while the tender drawings specify it at 0.75m. The document does not mention protection materials in the construction drawings that are included in the tender drawings. It provides an example ground floor plan showing the layout.
The document compares the Bill of Quantities (BOQ), tender drawings, and construction drawings for staff residence projects. It notes differences between the drawings, such as foundation safe allowable bearing capacities of 250 kN/m2 in the tender drawings and 200 kN/m2 in the construction drawings. The construction drawings also specify the ground level at 0.60m while the tender drawings specify it at 0.75m. The document does not mention protection materials in the construction drawings that are included in the tender drawings. It provides an example ground floor plan showing the layout.
Drawing Staff Residence: Quantity: 682 Rate: 80000/- General Notes: General Notes: Not mentioned 1. Bungalow (Plinth Amount: aprox: 54.5 million Excavation and Excavation and protection Area 341 sq.m) Items: Supply Labour and dewatering; The dewatering; The material in 02 Nos material to construct staff Contractor shall Contractor shall construction residence, with accessories provide positive provide positive drawing and fitting including protection protection for excavation in all soil or rock (mat/sheet all Excavation There is (as the case may be ), covering) for all slopes difference in safe termite treatment, Excavation slopes Foundation: allowable bearing foundation, columns, Foundation: Safe Allowable capacity of 50 beams, ground beams, Safe Allowable Bearing KN/m2 b/w both slabs, stairs, roof tower, Bearing Capacity Capacity of 200 drawings roof treatment, finishing of 250 KN/M2 for KN/M2 for all works, electrical, all types of types of mechanical works, solid foundations foundations core doors with G.I frame ( Isolated, (Isolated, and powder coated Combined, Strip, Combined, Strip, raft, etc) 1.5 m raft, etc) 1.5 m aluminium doors, window and carpentry works, steel below NGL below NGL gates, Plumbing/Sewage/Drainage works, external works including driveway, ramp, pavement, and landscaped area. Etc. complete in all respect as per design, drawings, specification and as directed by the Engineer.