Professional Documents
Culture Documents
Basement Plan - Fire Services: Construction Drawing
Basement Plan - Fire Services: Construction Drawing
4 5 6 7 8 9 10 11 12 13 14 15 16
I
D
F
E
H
G
2
BOUNDARY LINE BOUNDARY LINE BOUNDARY LINE
BOUNDARY LINE/ROA
K
BOUN
LDARY
GS
ELECT
P&S
LINE
DB
SA
STORE
D RESERVE LINE
AC
AC LIFT CP
STORE
P&S
GUEST BEDRM
GUEST BEDRM
SA PS
DRIVERS RM
M
CAR PORCH
PING PONG RM
A S A
J
COURTYARD
DB
POWDER RM
I
COURTYARD
FOYER
DB
ELV
ELC
LIFT CP
MAIDS RM
MAIDS RM
MAIDS RM
STORE
N
PS
SA
3
H
4
SHOE CLOSET
DB
DB
ROOM
PUMP
B B
G
FEATURE)
BALANCING
TANK (WATER
BALANCING
TANK (KOI)
M&E RM
O
C C
SHOE CLOSET
BOUND
F
POOL)
(SWIMMING
BALANCING
TANK
ARY LIN
KOI POND
STORE
ROOM
SERVER
ROOM
SOLAR
HS
BOU
E/ROAD
NDA
RY L
DB
INE
S
E
20
RESER
V
OFFICE
19
E LINE
18
DB
17
I
COURTYARD
GUEST BEDRM
POWDER RM
D
OFFICE
TEL
BOU
NDA
B
RY L
E IN
C
AC CONTROL PANEL
TEL RISER
BALANCING
TANK
PUMP ROOM
M&E RM
GARDEN
BO
UN
DA
YR
LIN
A
E/
1
RO
AD
H
G
RE
BOU
SE
DAR N
Y LIN 0 CONSTRUCTION DRAWING JUNE'22
R
E
VE
3
REV DESCRIPTION DATE
LIN
D
E
2
Owner
Project Title :
2. THE COMPLETE FIRE ALARM SYSTEM SHALL BE ELECTRICALLY SUPERVISED. Drawing Title :
3. INDICATORS ON CEILING OF ALL CONCEALED DETECTORS (ABOVE CEILING) SHALL BE INCLUSIVE.
FIRE SERVICES
4. ALL THE CONCEALED DETECTORS TO BE COMPLETED WITH INDICATOR LIGHT AT CEILING LEVEL. BASEMENT PLAN, NOTES & LEGEND
ACCESS PANEL TO BE PROVIDED FOR ALL THE CONCEALED DECTECTOR.
5. ALL THE CONDUIT ROUTING TO BE SHOW IN THE SHOP DWG AND AS BUILT Designed : Checked :
MK
AY
DWG.
Drawn: SZ Date: MAR '22
Scale:
1 : 150
Drawing No. : Rev.
P2037-FS-300 0
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY KUNDA CONSULTING
ENGINEERS WHOSE CONSENT MUST BE SOUGHT BEFORE ANY USE OR REPRODUCTION OF
THE DRAWING OR ANY PART THEREOF CAN BE MADE