Construction Drawing: Legend

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LEGEND NOTES FOR GAS PIPING INSTALLATION GENERAL NOTES CONSTRUCTION DRAWING

1. THE WHOLE GAS INSTALLATION SHALL COMPLY WITH 1. ALL DETAILS SHOWN SHALL BE READ IN CONJUNCTION WITH ARCHITECTURAL
GAS SERVICE ISOLATING VALVE
THE LATEST CITYGAS REQUIREMENT INCLUDING:- DRAWINGS, DISCREPANCIES, IF ANY, SHALL REFER TO THE ENGINEERS AND/OR
GSIV
A. SS 608 : 2015 - CODE OF PRACTICE FOR GAS INSTALLATION. THE ARCHITECTS BEFORE PROCEEDING FURTHER.
GAS METER CONTROL VALVE B. ALL OTHER LOCAL REGULATIONS HAVING JURISDICTION ON THE WORK.
GMCV 2. FULL TIME LICENSED PLUMBER AND GAS SERVICE WORKER SHALL BE ENGAGED
2. ALL WORKS TO BE CARRIED OUT UNDER THE SUPERVISION OF LICENSED TO SUPERVISE THE PLUMBING/SANITARY AND GAS INSTALLATION.
BALL VALVE
GAS SERVICE WORKER.
SYPHON 3. ALL EQUIPMENT SELECTIONS SHALL BE JUSTIFIED BY CALCULATION FOR
PROJECT MANAGERS' APPROVAL PRIOR TO ORDERING OF EQUIPMENT.
3. 'SPOOL' INSTALLATION SHALL BE PROVIDED AS PER CITYGAS'S REQUIREMENTS.
NEW GAS PIPE
4. GAS PIPEWORK RUN HORIZONTALLY SHALL BE INSTALLED WITH A FALL OF 10MM 4. ALL EQUIPMENT CATALOGUES/PUMP CURVES (WITH OPERATION POINT MARKED)
EXISTING GAS PIPE IN 1.2M (1 IN 120) TOWARDS THE METER. IF THE FALL IS NOT PRACTICAL, SHALL BE SUBMITTED FOR APPROVAL PRIOR TO ORDERING OF MATERIAL.
SYPHON LEG SHALL BE INSTALLED AT A SUITABLE LOCATION.
5. ALL HANGERS, SUPPORTS, BRACKETS INCLUDING ANGLE CHANNELS, RODS, PLATES,
NUTS AND WASHERS ETC. SHALL BE HOT DIPPED GALVANIZED STEEL MATERIAL.
5. INSTALLATION OF GAS PIPE WORK SHALL BE INSPECTED AND APPROVED BY CITYGAS
PRIOR TO TURN-ON OF GAS SUPPLY BY CITYGAS.
6. PROVISION SHALL BE ALLOWED FOR ALL PUMP EQUIPMENT, WATER TANK HIGH/
LOW/OVERFLOW LEVEL ALARM, PRE-HEAT TANK, HOT WATER STORAGE TANK,
6. ALL UNDERGROUND GAS PIPE WORK SHALL BE INSPECTED AND APPROVED BY CITYGAS HEAT EXCHANGER, SUBMERSIBLE PUMP SUMPS, SEWAGE EJECTOR TANKS,
PRIOR TO BACKFILLING OF SOIL. COLD WATER AND BOOSTER PUMP SYSTEMS, LEVEL SWITCH IN ELEVATOR/LIFT
PIT ETC, TO BE LINKED TO CCMS SYSTEM.
7. ALL GAS VALVES AND FITTINGS ETC. SHALL BE OF APPROVED TYPE BY CITYGAS.

7. LEVEL SWITCH CONNECTED TO CCMS SYSTEM SHALL BE PROVIDED WITHIN EACH DRY
8. GAS PIPE INSIDE BASEMENT AND FALSE CEILING SPACE SHALL BE C/W
AIR TIGHT METAL PIPE SLEEVE. SUMP PIT IN ALL ELEVATOR/LIFT PITS BELOW GROUND LEVEL.

9. LGSW TO DETERMINE THE NUMBER OF SYPHON BASED ON EXACT GROUND CONDITIONS.


8. DUE TO THE FACT THAT FINAL DESIGN OF THE ELECTRICAL WORKS CAN ONLY TAKE
PLACE WHEN THE MANUFACTURERS OF ALL ELECTRICAL COMPONENTS ARE KNOWN,
THE SUB-CONTRACTOR SHALL USE THE DRAWINGS AS THE BASIS OF DESIGN
PHILOSOPHY TO CARRY OUT DETAILED DESIGN DEVELOPMENT AND COORDINATION OF
THE ELECTRICAL SYSTEM, IE. MCC, PMCP, POWER DISTRIBUTION TO ALL EQUIPMENTS,
FIELD DEVICES AND CABLE CONTAINMENT, ETC.

4 5 6 7 8 9 10 11 12 13 14 15 16

/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

/
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / /

/
/

/
/

/
/

/
/

/
/

/
/

/
/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/
/

/
/

/
/

/
/

/
/
K

/
/

/
/

/
/

/
/

/
/
/

/
/
/

L
/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
ELEC
/

/
/

/
/

/
/

/
/

/
/

AC

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

M
/

/
/

/
/

/
/

/
/

/
/

/
/

VP

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/
/

/
J

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

NARROW

/
/

/
/

/
/

/
/
I

/
PS
/

/
/

/
/

/
SITE PLAN

/
/
SCALE : 1:150

/
/

/
/

/
/

/
/

/
/

N
/

/
/

/
/

/
H

/
/

/
/

/
/

/
/

/
ACRYLIC PANEL
/

/
0 CONSTRUCTION DRAWING JUNE'22
/

/
/

/
/

/
/

/
/

/
DB
/

/
/

/
/ /
/

/
/
/

/
REV DESCRIPTION DATE
/

/
/

/
/

/
/

/
/

RP

/
/

DB

/
AC
/

/
RP
/

/
/

/
/

DB
Owner

/
/

/
/
MOUNT ROSIE ROAD

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/
G

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

O
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
ACRYLIC PANEL

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/

/
/
F

/
/
/

ARCHITECT:
/

/
/

/
/

RT+Q
/

/
/

/
/
/

/
/
/

/
/
/
/
/
/
/

/
/
/

/
/
/
/
/

ARCHITECTS PTE LTD


/
/

/
/
/

/
/
/
/
/
/
/

/
/
/

/
/
/

/
/

32A Mosque Street


/
/

/
/
/

/
/
/

/
/
/
E

/
/
/

20

/
/
/

/
/
/
/
/
/
/

/
Singapore 059510
/
/

/
/
/
/
/
/
/

/
/
/

/
/
/
/
/
/
/

/
/
/

/
/
/

/
Tel: 6221 1366 Fax: 6222 2080
/
/
/

/
/
/

/
/
/

/
/
/
/

/
/
/
/

/
/
/

/
/

/
/

19
/

/
/
/

/
M&E CONSULTANT :
/

/
/

/
/
/

/
/
/
/

/
/

/
/
/

18

/
/
/

/
/
/
/
/

/
/
/

/
/
/
/

/
/
/
/

/
/
/
/

/
/
/

17
/

/
/

/
/

/
/
/

Kunda Consulting Engineers

/
/
/

/
/
/

/
/

/
/
/
/
/

/
/
/
/

/
/

/
/
/
/

/
/ /
/
/
/
D

/
/
/
/

/
/

/
/ /

1 Pemimpin Drive,
/

/
/
/
/

/
/

/
/

/
/

/
/
/

/
/
/
/

/
/
/
/

/
/

#12-05 One Pemimpin,

/
/
/

/
/
VP
/

/
/
/
/

/
/
/
/
/

/
/
/
/

/
/

Singapore 576151
/

/
/
/
/
/

/
/
/
/

/
/
/

/
/

/
/
/
/

/
/
/

/
/

/
/

Tel: (65) 6356 6061


/
/

/
/
/
/
/

/
/
/

/
/

/
/
/
/

/
/
/

/
/

/
/

Fax: (65) 6358 1169


/
/

/
/
/

/
/

/
/
/
/

/
/
/

/
/

/
/

/
/

/
/
/

/
/

Email: info@kunda.com.sg
/

/
/

/
C

/
/
/
/

/
/

/
/

/
/

/
/

Project Title :
/

/
/

/
/

PROPOSED GAS INSTALLATION TO


/

/
/

/
/

PROPOSED ERECTION OF A 2-STOREY ENVELOPE


/

/
/

CONTROL DETACHED DWELLING HOUSE WITH


/

/
/

BASEMENT, ATTIC AND SWIMMING POOL ON LOT NO.


/

/
/

/
/

00046C MK 17 AT 15 MOUNT ROSIE (NOVENA PLANNING


/

/
/

AREA), SINGAPORE
/

/
/

/
/

/
/
/

/ /
/
/
/
/

/
/
/
/
/

/
/
/
/

/
/
/
/

/
/
/
/

/
/
/
/
/

/
/
/
/

/
/
/

/
/
/
/
/
/

/
/
/
/

/
/

Drawing Title :
/
/ /
/
/
/
/

/
/
/
/
/

/
/
/
/

/
/
/
/

/
/
/
/ /
/
/
/
/

/
/
/
/

GAS SERVICES
/
/

/
/
/
/

/
/

/
/
/
/
/

/
/
/
/

/
/
/
/

/
/
/
/ /
/
/
/
/

/
/
/
/
/

/
758

/
/ /
/
/

NOTES & LEGEND


/
/

/
/
/
/

/
/
/

/
/

/
/
/
/
/

/
/
/
/

/
/
/
/

/
/
/
/
/

SITE PLAN
/
/ /
/
/
/
/

/
/
/ /
/
/

/
N S 15

/
/
/

/
/

/
N
9
T
TBM L...10.

Designed : Checked :
AY MK
O

Drawn: AP Date: MAR '22


R

Scale:
AS SHOWN
Drawing No. : Rev.

P2037-GS-100 0
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY KUNDA CONSULTING
ENGINEERS WHOSE CONSENT MUST BE SOUGHT BEFORE ANY USE OR REPRODUCTION OF
THE DRAWING OR ANY PART THEREOF CAN BE MADE

You might also like