Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CONSTRUCTION DRAWING

4 5 6 7 8 9 10 11 12 13 14 15 16

BOUNDARY LINE BOUNDARY LINE BOUNDARY LINE


BOUNDARY LINE/ROA

1 NO Ø100 SW/VP 5 F/B


K

BOUN
L
HIGHEST SLOPPING ROOF
BE TERMINATED MIN 150mm ABOVE
Ø150 SW/VP 4 C/W VENT COWL TO

DARY
L
D RESERVE LINE

INE
HIGHEST SLOPPING ROOF
BE TERMINATED MIN 150mm ABOVE
Ø100 SW/VP 5 C/W VENT COWL TO

M
J

HIGHEST SLOPPING ROOF


BE TERMINATED MIN 150mm ABOVE
Ø150 SW/VP 2 C/W VENT COWL TO

HIGHEST SLOPPING ROOF


BE TERMINATED MIN 150mm ABOVE
Ø150 SW/VP 3 C/W VENT COWL TO
I

N
H

HIGHEST SLOPPING ROOF


BE TERMINATED MIN 150mm ABOVE
Ø150 SW/VP 6 C/W VENT COWL TO

1 NO Ø150 SW/VP 6 F/B


G

O
BOUND
F

ARY LIN

BOU
E/ROAD

NDA
RY L
INE
0 CONSTRUCTION DRAWING JUNE'22
E

20
RESER

REV DESCRIPTION DATE


Owner
VE LINE

19
18
17
D

BOU
DAR N
B

Y LIN
E ARCHITECT:
C

RT+Q
ARCHITECTS PTE LTD
32A Mosque Street
Singapore 059510
BO

Tel: 6221 1366 Fax: 6222 2080


UN
DA

M&E CONSULTANT :
RY
LIN

Kunda Consulting Engineers


A
E/
RO

1 Pemimpin Drive,
AD

#12-05 One Pemimpin,


RE

BOU Singapore 576151


S

NDA
Tel: (65) 6356 6061
ER

RY L
INE
Fax: (65) 6358 1169
VE

3 Email: info@kunda.com.sg
LIN
E

2 Project Title :

PROPOSED SANITARY INSTALLATION TO


1
PROPOSED ERECTION OF A 2-STOREY ENVELOPE
CONTROL DETACHED DWELLING HOUSE WITH
BASEMENT, ATTIC AND SWIMMING POOL ON LOT NO.
00046C MK 17 AT 15 MOUNT ROSIE (NOVENA PLANNING
AREA), SINGAPORE

Drawing Title :
SANITARY SERVICES
ROOF PLAN

Designed : Checked :
AY MK
Drawn: AP Date: MAR '22
Scale:
AS SHOWN
Drawing No. : Rev.

P2037-PS-304 0
THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BY KUNDA CONSULTING
ENGINEERS WHOSE CONSENT MUST BE SOUGHT BEFORE ANY USE OR REPRODUCTION OF
THE DRAWING OR ANY PART THEREOF CAN BE MADE

You might also like