Professional Documents
Culture Documents
Aicc 14 CNCH PK010 P Mec 00005 00C - Eng
Aicc 14 CNCH PK010 P Mec 00005 00C - Eng
Prepared by reviewed by
Signature/Initial:
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
Table of Contents
1. INTRODUCTION..........................................................................................................................................3
1.1. GOAL...............................................................................................................................................................3
3. CALCULATION BASIS................................................................................................................................3
FOUR. CONCLUSIONS...........................................................................................................................................16
AICC-14-CNCH-PK010-P-MEC-00005-00C | page2of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
1. INTRODUCTION
This calculation report develops the analysis and design of the pluvial drainage system for the project
called “02 Level Office Construction” of Cusco International Airport (AICC).
1.1. GOAL
- Calculate the dimensions of the gutter and the diameter of the storm drainage networks.
2. DESIGN BACKGROUND
2.1. REGULATIONS / RULES
The following regulations and/or standards are considered:
CE.040 Urban storm drainage.
3. CALCULATION BASIS
The calculation of the storm drainage system for this building is carried out according to the
provisions of RNE CE.040 Urban Storm Drainage, IILA – SENAMHI – MODIFIED UNI method.
3.1.1. ESTIMATION OF THE RETURN PERIOD IN YEARS
The return period is the average time in years, in which the value of the peak flow or precipitation, is
equaled or exceeded once every "t" years. Due to the scope of this project and based on the terms of
reference of the project, a flood of 100 years of return period is recommended.
3.1.2. ESTIMATION OF THE RUNOFF COEFFICIENT
The runoff coefficient is estimated according to parameters provided by the CE.040 Urban Storm
Drainage standard, as shown below:
For a return period of 100 years and considering that the surface is a ceiling, the value of 0.97 is
adopted as the runoff coefficient.
AICC-14-CNCH-PK010-P-MEC-00005-00C | page3of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
The total length of the surface flow from the furthest point of the drainage area to the discharge point
is taken into account through the pluvial drainage pillar according to its location on the plans, and the
slope of the coverage.
AICC-14-CNCH-PK010-P-MEC-00005-00C | page4of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
According to figure 01 pluviometric zones and subzones indicated in the national building
regulations of the "Study of the hydrology of Peru - Annexes", the project is located in ZONE 123
AND SUBZONE1235
Replacing the initial design parameters in the MODIFIED IILA-SENAMHI-UNI formula, the rain
intensity value is estimated in mm/hour, as shown below:
AICC-14-CNCH-PK010-P-MEC-00005-00C | page5of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
AICC-14-CNCH-PK010-P-MEC-00005-00C | page6of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
ANTA
YEAR URUBAMBA CHITAPAMPA
ANCACHURO
AICC-14-CNCH-PK010-P-MEC-00005-00C | page7of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
AICC-14-CNCH-PK010-P-MEC-00005-00C | page8of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
To size the gutters, we first proceeded to determine the areas of influence of the roofs of the different
buildings, taking as a reference that gutters will be used approximately every 15 m; the area of
influence will be the most unfavorable, based on this the width and depth of the gutters are
determined.
Using the rational method according to the CE.040 Standard, the maximum flows in each drainage
area are determined, as indicated by the following formula.
AICC-14-CNCH-PK010-P-MEC-00005-00C | page9of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
After determining the area of influence of the platform, the flow rate that will pass through each gutter
was determined.
TABLE N°1: DETERMINATION OF RAINFALL DRAINAGE FLOW
Based on the drainage area with the largest area (roof S2), with an area of 69.63 m2, the H-Channels
program is used to calculate the initial width and height of the projected gutter. It is worth mentioning
that to perform the hydraulic calculation, the commercial dimensions of prefabricated metal gutters
are taken into account, as shown below.
AICC-14-CNCH-PK010-P-MEC-00005-00C | page10of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
FOR CEILING S1
FOR CEILING S2
FOR CEILING S3
AICC-14-CNCH-PK010-P-MEC-00005-00C | page11of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
FOR CEILING S4
FOR CEILING S5
FOR CEILING S6
AICC-14-CNCH-PK010-P-MEC-00005-00C | page12of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
FOR CEILING S7
FOR CEILING S8
FOR CEILING S9
AICC-14-CNCH-PK010-P-MEC-00005-00C | page13of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
AICC-14-CNCH-PK010-P-MEC-00005-00C | page14of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
For commercial gutter widths of 190 mm, it corresponds to braces according to the following table:
Partial Partial H
gutter Hmin(mm)
area(m2) Flow(l/s) project(mm)
S1 ceiling 57.47 0.340 7.40 100.00
S2 ceiling 69.63 0.412 8.30 100.00
S3 ceiling 66.11 0.391 8.10 100.00
S4 ceiling 53.50 0.316 7.10 100.00
S5 ceiling 63.15 0.374 7.80 100.00
S6 ceiling 61.85 0.366 7.80 100.00
S7 ceiling 68.10 0.403 8.20 100.00
S8 ceiling 57.47 0.340 7.40 100.00
S9 roof 69.63 0.412 8.30 100.00
S10 ceiling 66.11 0.391 8.10 100.00
S11 ceiling 53.50 0.316 7.10 100.00
S12 ceiling 63.15 0.374 7.80 100.00
S13 ceiling 61.85 0.366 7.80 100.00
S14 ceiling 58.10 0.344 7.40 100.00
AICC-14-CNCH-PK010-P-MEC-00005-00C | page15of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
As can be seen in the table above, the minimum height for the largest drainage area (Roof S2) is 8.30
mm, so it is proposed to consider a gutter height of 100 mm as it is commercial in the market.
The storm drainage system on the roof basically works by gravity. To this end, gutters have been
designed with storm drains distributed according to the tributary area, with a minimum projected
slope of 1.0% for the gutter in order to allow the discharge of storm drainage to the existing platform,
as indicated in the national regulation of buildings CE.040.
To size the diameter of the pipes, the contributing flow of each roof in each area is known, based on
the storm drainage flow, the H-Canales program is used to calculate the diameter of the storm
drainage pipe.
For a 3” pipe diameter with an internal diameter of 76 mm, a water depth of 21.5 mm
corresponds, which represents a water depth of 28% of the diameter of the pipe.
4. CONCLUSIONS
AICC-14-CNCH-PK010-P-MEC-00005-00C | page16of17
SANITARY
Project of the New International Airport of CALCULATION REPORT
Chinchero-Cusco (AICC) – RAIN DRAINAGE
Chinchero Nativity Consortium - CNCH Contract No.: SBCC 003-
2020-MTC/PMO
o Metal gutters of 0.19m width and minimum height of 0.10m, the slope of the gutter will be
1.00%.
o The pluvial drainage discharge pipe of each gutter will be 3” in diameter and will evacuate to
the platform.