Professional Documents
Culture Documents
Subcon Return
Subcon Return
After the subcontractor (as vendor) delivered the ordered material (end product), you
posted the goods receipt to the subcontract order. The system determined the
necessary components for each purchase order item and created for each component
a goods issue item with the quantity that was determined in the purchase order
If the vendor informs you after these postings that a greater or smaller quantity of
the subcontracting components was actually consumed than planned in the purchase
order, you must post a Subsequent Adjustment to correct the component
consumption. After Creating BOM for Finished Material (T-code CS01) and
P.O(ME21N)
T-Code - J1IGSUBCON
3. Change Challan / Invoice - T -Code - VF02
After Challan gets created , it will send to the Subcontracting Vendor along with the
materials /components
Subcontracting Vendor tells that unless of 3pcs , I have consume 4pcs. It can be
Over-consume or Under-consume
Case -2 - Under-Consume
Unless of 3pcs Subcontracting Vendor has consume 2pcs , in
that scenario also we do Subsequent Adjustment against P.O