Professional Documents
Culture Documents
PCS265LTE PS45 RTX3 Environmetal Test Report PARENV EN.32029
PCS265LTE PS45 RTX3 Environmetal Test Report PARENV EN.32029
FOR:
EUTs:
1) Communicator Module
Model: PCS265LTE
2) Wireless Expansion Module
Model: RTX3 (433/868 MHz)
3) Power Supply
Model: PS45
This report is in conformity with ISO/ IEC 17025. The "A2LA Accredited" symbol endorsement applies only to the tests and
calibrations that are listed in the scope of Hermon Laboratories accreditation. The test results relate only to the items tested.
This test report shall not be reproduced in any form except in full with the written approval of Hermon Laboratories Ltd.
Table of contents
Page 2 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
1 Applicant information
Condition of the
Sample
equipment
Receipt date: 06-Jan-19
3 Manufacturer information
4 Test details
Page 3 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
5 EUT description
The EUTs are classified as CIE (1) and (2) respectively Power Supply (3), Environmental Class II, fixed
equipment (see Photographs 5.5.1 to 5.5.5):
Page 4 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 5 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 6 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
The operational tests were performed in Set status, no change in status no unintentional signals and messages
accepted.
The CIE (control and indicating equipment) shall pass the reduced functional test before and after operational
endurance tests also during operational tests.
The performed reduced functional tests are the tests required by EN 50131-3 for CIE products.
In addition the RFT required by EN50136-2:2013, EN50131-6:2008, EN50131-10:2014 was performed for
Communicator Module.
No any un-intentional signals or messages accepted during operational tests (performed in set condition).
In this Test Report the functional tests referred above are abbreviated as follows:
RFT= Reduced functional test EN50131-3, EN50131-6, EN50136-2, EN50131-10.
Before, after each test, the EUT was visually inspected by the HL engineers.
Page 7 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
6 Tests summary
Test Status
EN 50130-5:2011
Cold (Operational) test Pass
Dry heat (Operational) test Pass
Damp heat, cyclic (Operational) test Pass
Damp heat, steady state (Endurance) test Pass
Sinusoidal vibration (Operational) test Pass
Shock (Operational) test Pass
Impact (Operational) test Pass
Reviewed
Ms. Anna Gorovoy, Environmental Certification Engineer 03-Feb-19
by:
Approved
Mr. Mihaeli Feldmann, Environmental Group Manager 03-Feb-19
by:
Page 8 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Observation Verdict
No structural or mechanical damages were registered during the visual inspection.
All RFT performed at the times specified in product standard passed.
Pass
No unintentional change in status (system armed), no false alarm recorded.
The EUT passed the cold (operational) test.
HL 5381 HL 4755
Page 9 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 10 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 11 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 12 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Observation Verdict
No structural or mechanical damages were registered during the visual inspection.
All RFT performed at the times specified in product standard passed.
Pass
No unintentional change in status (system armed), no false alarm recorded.
The EUTs passed the dry heat (operational) test.
Page 13 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 14 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 15 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.2.1 Temperature monitoring during the dry heat (operational) test
Page 16 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Observation Verdict
No structural or mechanical damages were registered during the visual inspection.
All RFT performed at the times specified in product standard passed.
Pass
No unintentional change in status (system armed), no false alarm recorded.
The EUT passed the damp heat cyclic (operational) test.
Page 17 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 18 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.3.1 Temperature and relative humidity monitoring during the damp heat cyclic (operational) test
Page 19 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
6.4 Damp heat, steady state (Endurance) test procedure and results
6.4.1 Test purpose
The test was performed to demonstrate the EUT ability to withstand the long term effects of humidity in the service
environment (changes in electrical proprieties due to absorption, chemical reactions involving moisture, galvanic
corrosion etc.)
Observation Verdict
No structural or mechanical damages were registered during the visual inspection.
No deterioration in functional performance was noticed. RFT passed. Pass
The EUT passed the damp heat, steady state (endurance) test.
HL 4725 HL 4755
Page 20 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 21 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 22 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Observation Verdict
No structural or mechanical damages were registered during the visual inspection.
All RFT passed.
Pass
No change in system status (armed).
The EUT passed the sinusoidal vibration test (operational).
Page 23 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
NOT IN SCALE
Control
accelerometer
EUT
Page 24 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 25 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
PS45
Page 26 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 27 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
PS45
Page 28 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 29 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
PS45
Page 30 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 31 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
PS45
Page 32 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 33 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
PS45
Page 34 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 35 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
PS45
Page 36 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Observation Verdict
No structural or mechanical damages were registered during the visual inspection.
RFT passed before and after test Pass
No change in system status (armed), no alarm recorded.
Page 37 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Pulse width ms 6
Pulse width ms 6
Page 38 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
NOT IN SCALE
Control
accelerometer
EUT
Page 39 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 40 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
PS45
Page 41 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 42 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
PS45
Page 43 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 44 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
PS45
Page 45 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.1 The positive shock pulse along vertical axis (operational)
Page 46 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.2 The negative shock pulse along vertical axis (operational)
Page 47 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.3 The positive shock pulse along vertical axis (operational)
PS45
Page 48 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.4 The negative shock pulse along vertical axis (operational)
PS45
Page 49 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.5 The positive shock pulse along transverse axis (operational)
Page 50 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.6 The negative shock pulse along transverse axis (operational)
Page 51 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.7 The positive shock pulse along transverse axis (operational)
PS45
Page 52 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.8 The negative shock pulse along transverse axis (operational)
PS45
Page 53 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.9 The positive shock pulse along longitudinal axis (operational)
Page 54 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.10 The negative shock pulse along longitudinal axis (operational)
Page 55 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.11 The positive shock pulse along longitudinal axis (operational)
PS45
Page 56 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Plot 6.6.12 The negative shock pulse along longitudinal axis (operational)
PS45
Page 57 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Observation Verdict
No structural or mechanical damages were registered during the visual inspection.
No unintentional signals or messages noticed.
Pass
RFT passed before and after test.
The EUT passed the impact test.
HL 3013 HL 4020
Page 58 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
RTX3 1 5 3 5
PCS265LTE 1 5 3 5
PS45 1 5 3 5
Page 59 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 60 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 61 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 62 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 63 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 64 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
8. IEC 60068-2-78:01 Environmental Testing - Part 2-78: Tests - Test 2-78: Body Cab:
Damp Heat, Steady State
10. Temperature and humidity TP-10_2017 Temperature And Humidity Test Procedure according to
ETSI EN 300 019-2-0,-1,-2,-3,-4,-5,-6,-7,-8, IEC 60721-4-1,-2,-3,-4,
MIL-STD- 810 B, C, D, E, F, G, RTCA DO-160D, E, F, G,
IEC 60068-2-1, -2, -14, -30, - 38, -56, -78, ASTM D4332, ASTM
F1980, DEF STAN 00-35, IEEE 1613, IEC 61850-3, GR-63-CORE,
ISO 11608-1, ISO 1608-4 and IEC 60601-1-11 STANDARDS
11. Vibration and shock TP-8_2017 Vibration And Shock Test Procedure according to MIL-STD – 810 B,
C, D, E, F, G, MIL-STD-167 -1A, GR-63-CORE, IEC 60068-2-6, -27,
-29, -55, -64, -75, RTCA DO-160D, E, F, G, ASTM D999, ASTM
D4169, ASTM D4728, DEF STAN 00-35, IEC 61373, IEC 60601-1-
11, ISO 11608-1, ISO 11608-4, IEC 61850-3, IEEE Std 1613 and
ISTA 2A STANDARDS
Page 65 of 66
Report ID: PARENV_EN.32029.doc
Date of Issue: 3-Feb-19
Page 66 of 66