Development of Interception and Diversion Network and STP with Waste Water Treatment Facility on a "Design Built Operation

Transfer" (DBOT) model for Hooghly and Chinsura Municipal area in Hooghly District, West Bengal with 15 years of Operation & Maintenance period under Namami Ganga Programme.
Interception and Diversion (I&D) Network, Chinsurah Municipality, Hooghly
Tender No.:- /SE(S)GAP/W&S/KMDA of 2021-22.
Work Order No:-
E NIT NO:- KMDA/WS/GAP/SE(S)/NIT-1/21-22
ZONE-3 (BAGDI GALI -KHUSI GALI TO TOLAFATAK MANHOLE)
CLIENT :- KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY (KMDA)
CONTRACTOR:- TRADERS ENGINEERING PRIVATE LIMITED (TEPL)-ASPL JV
PREPARED BY :- SUMATI INFRA
SEWER DESIGN -BANDEL- HOOGHLY-CHINSURA - (FINAL DESIGN YEAR - 2052)
Col.1 Col.2 Col.3 Col.4 Col.5 Col.6 Col.7 Col.8 Col.9 Col.10 Col.11 Col.12 Col.13 Col.14 Col.15 Col.16 Col.17 Col.18 Col.19 Col.20 Col.21 Col.22 Col.23 Col.24 Col.25 Col.26 Col.27 Col.28 Col.29 Col.30 Col.31 Col.32 Col.33 Col.34 Col.35 Col.36 Col.37 Col.38 Col.39 Col.40 Col.41 Col.42 Col.43 Col.44 Col.45 Col.46 Col.47 Col.48 Col.49 Col.50 Col.51
Location & Survey Flow Peak Factor Ground water Design Flow Sewer Design Calculation Sewer Layout Manhole Layout Width of Cutting Material Topographical Layout
Ground water Actual Total Height of
Design Manning Cutting Invert level Cutting Width of
Flow (MLD) of Infiltration Ground surface Vertical Ground Slope Fall Sewer Pipe Invert (Depth Drop in Depth of Sewer Cutting Depth of
Chainage Stretch Sewer 's Vfull Qfull q/Q v/V d/D Vactual Cushion (m) Mahole Pipe
Pipe No. 2022 (lps), @ 5000 Horizont Elevation (GL) (m) Fall Slope Provide Provide Level (m) of Manhole (m) of Manhole (m) ** Sewer Pipeline (m) # Base
(Starting
Chainage accordin
Location Peak Liters/Km/day Average Flow
Design Design
al
Diameter Constant
Water) Sewer (m) * Type
Pipe Pipe Laying in Road Material
Remarks (Ref.
according to g to Peak Flow (lps) Flow Flow (AT THE Codes &
Outfall-Serial Name Factor with GWI (lps) Length At Type road Flange Width (m) for Bedding
Survey pipeline Up (lps) (m³/sec) At Upper Upper Lower Upper Lower Upper Lower At Upper At Lower At Upper At Lower without with UPPER wall Schedules)
No.) Down (To Cumulativ (m) Lower of Pipe
layout (From Section Individual Manhole Meter 1 in 1 in m End End mm "n" (m/sec) Q (l/sec) (m/sec) (m) m End End End End Manhole Manhole Manhole Manhole Shoring Shoring END) thicknes
Node) e Manhole
Node) (U/S) (From) (To) (From) (To) (From) (To) (U/S) (D/S) (U/S) (D/S) (mm) (mm) s (mm)
(D/S)

SN8
at
at Chaiage (OD- DWC Pipes as per
Chaiage BAGDI RIGHT BFS+SAN
1 0+785 outfall- OF-D38 OF-D37 0.140 0.140 3 4.861 0.013 4.874 4.874 0.005 217 8.200 7.150 1.05 206.667 600 0.36167 6.500 6.138 300 0.01 0.726 51.338 0.095 0.600 0.195 0.436 0.059 0 1.700 1.012 1.400 0.712 6.150 5.938 1.949 1.260 750 1350 BRICK DWC 347MM 3.5 IS 16098 PART 1
0- outfall- GALI FLANK (RF) D
38 ,ID-300 & PART 2
38
MM)

Of D38-1 750 35 Z3M-1 Z3M-2 0.140 3 4.861 0.002 4.863 4.863 0.005 35 8.200 8.250 -0.05 -700.000 600 0.058333 6.500 6.442 300 0.01 0.726 51.338 0.095 0.600 0.195 0.435 0.058 0 1.700 1.808 1.400 1.508 6.150 6.092 1.949 2.057 750 1350 BRICK-B DWC 23.5 RIGHT FLANK (RF) 3.5 BFS+SAND
DRAIN INVERT
Of D38-2 720 65 Z3M-2 Z3M-3 0.140 3 4.861 0.002 4.863 4.863 0.005 30 8.250 8.070 0.18 166.667 600 0.05 6.442 6.392 300 0.01 0.726 51.338 0.095 0.600 0.195 0.435 0.058 0 1.808 1.678 1.508 1.378 6.092 6.042 2.057 1.927 750 1350 BRICK-B DWC 23.5 RIGHT FLANK (RF) 3.5 BFS+SAND DEPTH=7.67
AT MANHOLE
Of D38-3 690 95 Z3M-3 Z3M-4 0.140 3 4.861 0.002 4.863 4.863 0.005 30 8.070 7.850 0.22 136.364 600 0.05 6.392 6.342 300 0.01 0.726 51.338 0.095 0.600 0.195 0.435 0.058 0 1.678 1.508 1.378 1.208 6.042 5.992 1.927 1.757 750 1350 BRICK-B DWC 23.5 RIGHT FLANK (RF) 3.5 BFS+SAND Z3M-1 AT OF-
D38
Of D38-4 660 125 Z3M-4 Z3M-5 0.140 3 4.861 0.002 4.863 4.863 0.005 30 7.850 7.550 0.3 100.000 600 0.05 6.342 6.292 300 0.01 0.726 51.338 0.095 0.600 0.195 0.435 0.058 0 1.508 1.258 1.208 0.958 5.992 6.092 1.757 1.507 750 1350 BRICK-B DWC 23.5 RIGHT FLANK (RF) 3.5 BFS+SAND

Of D38-5 630 155 Z3M-5 Z3M-6 0.140 3 4.861 0.002 4.863 4.863 0.005 30 7.550 7.450 0.1 300.000 600 0.05 6.292 6.242 300 0.01 0.726 51.338 0.095 0.600 0.195 0.435 0.058 0 1.258 1.208 0.958 0.908 6.092 6.042 1.507 1.457 750 1350 BRICK-A DWC 23.5 RIGHT FLANK (RF) 3.5 BFS+SAND

Of D38-6 605 180 Z3M-6 Z3M-7 0.140 3 4.861 0.001 4.863 4.863 0.005 25 7.450 7.275 0.175 142.857 600 0.041667 6.242 6.200 300 0.01 0.726 51.338 0.095 0.600 0.195 0.435 0.058 0 1.208 1.075 0.908 0.775 6.042 6.000 1.457 1.324 750 1350 BRICK-A DWC 23.5 RIGHT FLANK (RF) 3.5 BFS+SAND

Of D38-7 575 210 Z3M-7 Z3M-8 0.140 3 4.861 0.002 4.863 4.863 0.005 30 7.275 7.200 0.075 400.000 600 0.05 6.200 6.150 300 0.01 0.726 51.338 0.095 0.600 0.195 0.435 0.058 0 1.075 1.050 0.775 0.750 6.000 5.950 1.324 1.299 750 1350 BRICK-A DWC 23.5 RIGHT FLANK (RF) 3.5 BFS+SAND

Of D38-8 568 217 Z3M-8 Z3M-9 0.140 3 4.861 0.000 4.862 4.862 0.005 7 7.200 7.150 0.05 140.000 600 0.011667 6.150 6.138 300 0.01 0.726 51.338 0.095 0.600 0.195 0.435 0.058 0 1.050 1.012 0.750 0.712 5.950 5.938 1.299 1.260 750 1350 BRICK-A DWC 23.5 RIGHT FLANK (RF) 3.5 BFS+SAND

BFS+PCC+
CONCRET
at NP3
at Chaiage Chaiage (OD-750
E Concrete
2 0+556- outfall- 217-
KHUSI
OF-D37 OF-D36 1.600 1.740 3 60.417 0.033 60.449 60.449 0.060 561.8 7.150 8.011 -0.861 -652.497 1500 0.37453 6.138 5.464 600 0.011 0.663 187.426 0.323 0.906 0.400 0.600 0.24 0 1.012 2.547 0.412 1.947 5.938 5.114 1.279 2.815 1200 1800 BRICK
CONCRET
MM & RIGHT FLANK (RF) 3.5
ENCASIN Pipes as per
GALI E- NP3 G WITH
37 outfall- ID-600
RCC IS 458:2003
37 MM)
BLOCK 3-
5 NOS
DROP AT
Z3M-10
(ACTUAL BFS+PCC+CON
DRAIN INVERT
CRETE DEPTH=6.27
WITOUT CONCRET
OF D37-9 556 229 Z3M-9 Z3M-10 1.740 3 60.417 0.001 60.417 60.417 0.060 12 7.150 7.350 -0.2 -60.000 1500 0.008 6.138 5.830 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 1.012 1.520 0.412 0.920 5.938 5.480 1.312 1.820 1200 1800 BRICK-A E- NP3
75 RIGHT FLANK (RF) 3.5 ENCASING NEAR
DROP WITH RCC MANHOLE Z3M-
DEPTH BLOCK 3-5 NOS
9
1.220) OF
0.3 M
BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-10 526 259 Z3M-10 Z3M-11 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.350 7.450 -0.1 -300.000 1500 0.02 5.830 5.810 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 1.520 1.640 0.920 1.040 5.480 5.460 1.820 1.940 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-11 501 284 Z3M-11 Z3M-12 1.740 3 60.417 0.001 60.418 60.418 0.060 25 7.450 7.500 -0.05 -500.000 1500 0.016667 5.810 5.794 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 1.640 1.706 1.040 1.106 5.460 5.444 1.940 2.006 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-12 471 314 Z3M-12 Z3M-13 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.500 7.510 -0.01 -3000.000 1500 0.02 5.794 5.774 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 1.706 1.736 1.106 1.136 5.444 5.424 2.006 2.036 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-13 441 344 Z3M-13 Z3M-14 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.510 7.650 -0.14 -214.286 1500 0.02 5.774 5.754 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 1.736 1.896 1.136 1.296 5.424 5.404 2.036 2.196 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-14 411 374 Z3M-14 Z3M-15 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.650 7.750 -0.1 -300.000 1500 0.02 5.754 5.734 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 1.896 2.016 1.296 1.416 5.404 5.384 2.196 2.316 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-15 381 404 Z3M-15 Z3M-16 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.750 7.800 -0.05 -600.000 1500 0.02 5.734 5.714 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.016 2.086 1.416 1.486 5.384 5.364 2.316 2.386 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-16 351 434 Z3M-16 Z3M-17 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.800 7.950 -0.15 -200.000 1500 0.02 5.714 5.694 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.086 2.256 1.486 1.656 5.364 5.344 2.386 2.556 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-17 321 464 Z3M-17 Z3M-18 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.950 7.950 0 0.000 1500 0.02 5.694 5.674 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.256 2.276 1.656 1.676 5.344 5.324 2.556 2.576 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-18 291 494 Z3M-18 Z3M-19 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.950 7.950 0 0.000 1500 0.02 5.674 5.654 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.276 2.296 1.676 1.696 5.324 5.304 2.576 2.596 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-19 253 532 Z3M-19 Z3M-20 1.740 3 60.417 0.002 60.419 60.419 0.060 38 7.950 7.950 0 0.000 1500 0.025333 5.654 5.628 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.296 2.322 1.696 1.722 5.304 5.278 2.596 2.622 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-20 232 553 Z3M-20 Z3M-21 1.740 3 60.417 0.001 60.418 60.418 0.060 21 7.950 7.950 0 0.000 1500 0.014 5.628 5.614 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.322 2.336 1.722 1.736 5.278 5.264 2.622 2.636 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-21 220 565 Z3M-21 Z3M-22 1.740 3 60.417 0.001 60.417 60.417 0.060 12 7.950 8.000 -0.05 -240.000 1500 0.008 5.614 5.606 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.336 2.394 1.736 1.794 5.264 5.256 2.636 2.694 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-22 212 573 Z3M-22 Z3M-23 1.740 3 60.417 0.000 60.417 60.417 0.060 8 8.000 7.960 0.04 200.000 1500 0.005333 5.606 5.601 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.394 2.359 1.794 1.759 5.256 5.251 2.694 2.659 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-23 198 587 Z3M-23 Z3M-24 1.740 3 60.417 0.001 60.417 60.417 0.060 14 7.960 7.800 0.16 87.500 1500 0.009333 5.601 5.592 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.359 2.208 1.759 1.608 5.251 5.242 2.659 2.508 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-24 177 608 Z3M-24 Z3M-25 1.740 3 60.417 0.001 60.418 60.418 0.060 21 7.800 7.650 0.15 140.000 1500 0.014 5.592 5.578 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.208 2.072 1.608 1.472 5.242 5.228 2.508 2.372 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-25 144 641 Z3M-25 Z3M-26 1.740 3 60.417 0.002 60.419 60.419 0.060 33 7.650 7.690 -0.04 -825.000 1500 0.022 5.578 5.556 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.072 2.134 1.472 1.534 5.228 5.206 2.372 2.434 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS

BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-26 111 674 Z3M-26 Z3M-27 1.740 3 60.417 0.002 60.419 60.419 0.060 33 7.690 7.700 -0.01 -3300.000 1500 0.022 5.556 5.534 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.134 2.166 1.534 1.566 5.206 5.184 2.434 2.466 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS
Development of Interception and Diversion Network and STP with Waste Water Treatment Facility on a "Design Built Operation Transfer" (DBOT) model for Hooghly and Chinsura Municipal area in Hooghly District, West Bengal with 15 years of Operation & Maintenance period under Namami Ganga Programme.
Interception and Diversion (I&D) Network, Chinsurah Municipality, Hooghly
Tender No.:- /SE(S)GAP/W&S/KMDA of 2021-22.
Work Order No:-
E NIT NO:- KMDA/WS/GAP/SE(S)/NIT-1/21-22
ZONE-3 (BAGDI GALI -KHUSI GALI TO TOLAFATAK MANHOLE)
CLIENT :- KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY (KMDA)
CONTRACTOR:- TRADERS ENGINEERING PRIVATE LIMITED (TEPL)-ASPL JV
PREPARED BY :- SUMATI INFRA
SEWER DESIGN -BANDEL- HOOGHLY-CHINSURA - (FINAL DESIGN YEAR - 2052)
Col.1 Col.2 Col.3 Col.4 Col.5 Col.6 Col.7 Col.8 Col.9 Col.10 Col.11 Col.12 Col.13 Col.14 Col.15 Col.16 Col.17 Col.18 Col.19 Col.20 Col.21 Col.22 Col.23 Col.24 Col.25 Col.26 Col.27 Col.28 Col.29 Col.30 Col.31 Col.32 Col.33 Col.34 Col.35 Col.36 Col.37 Col.38 Col.39 Col.40 Col.41 Col.42 Col.43 Col.44 Col.45 Col.46 Col.47 Col.48 Col.49 Col.50 Col.51
Location & Survey Flow Peak Factor Ground water Design Flow Sewer Design Calculation Sewer Layout Manhole Layout Width of Cutting Material Topographical Layout
Ground water Actual Total Height of
Design Manning Cutting Invert level Cutting Width of
Flow (MLD) of Infiltration Ground surface Vertical Ground Slope Fall Sewer Pipe Invert (Depth Drop in Depth of Sewer Cutting Depth of
Chainage Stretch Sewer 's Vfull Qfull q/Q v/V d/D Vactual Cushion (m) Mahole Pipe
Pipe No. 2022 (lps), @ 5000 Horizont Elevation (GL) (m) Fall Slope Provide Provide Level (m) of Manhole (m) of Manhole (m) ** Sewer Pipeline (m) # Base
(Starting
Chainage accordin
Location Peak Liters/Km/day Average Flow
Design Design
al
Diameter Constant
Water) Sewer (m) * Type
Pipe Pipe Laying in Road Material
Remarks (Ref.
according to g to Peak Flow (lps) Flow Flow (AT THE Codes &
Outfall-Serial Name Factor with GWI (lps) Length At Type road Flange Width (m) for Bedding
Survey pipeline Up (lps) (m³/sec) At Upper Upper Lower Upper Lower Upper Lower At Upper At Lower At Upper At Lower without with UPPER wall Schedules)
No.) Down (To Cumulativ (m) Lower of Pipe
layout (From Section Individual Manhole Meter 1 in 1 in m End End mm "n" (m/sec) Q (l/sec) (m/sec) (m) m End End End End Manhole Manhole Manhole Manhole Shoring Shoring END) thicknes
Node) e Manhole
Node) (U/S) (From) (To) (From) (To) (From) (To) (U/S) (D/S) (U/S) (D/S) (mm) (mm) s (mm)
(D/S)
BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-27 81 704 Z3M-27 Z3M-28 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.700 7.690 0.01 3000.000 1500 0.02 5.534 5.514 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.166 2.176 1.566 1.576 5.184 5.164 2.466 2.476 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
BLOCK 3-5 NOS DROP AT
TOLAFATAK
BFS+PCC+CONC JUNCTION
CONCRET RETE ENCASING MANHOLE
OF D37-28 51 734 Z3M-28 Z3M-29 1.740 3 60.417 0.002 60.418 60.418 0.060 30 7.690 7.730 -0.04 -750.000 1500 0.02 5.514 5.494 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.176 2.236 1.576 1.636 5.164 5.144 2.476 2.536 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC WHICH HAS
BLOCK 3-5 NOS
INVERT LEVEL
BFS+PCC+CONC 4.861 M AND
CONCRET RETE ENCASING DROP WILL BE
OF D37-29 35 750 Z3M-29 Z3M-30 1.740 3 60.417 0.001 60.418 60.418 0.060 16 7.730 7.875 -0.145 -110.345 1500 0.010667 5.494 5.483 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.236 2.392 1.636 1.792 5.144 5.133 2.536 2.692 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC OCCURRED AT
BLOCK 3-5 NOS
BFS+PCC+CONC A DEPTH OF
CONCRET 5.464-
OF D37-30 27 758 Z3M-30 Z3M-31 1.740 3 60.417 0.000 60.417 60.417 0.060 8 7.875 8.080 -0.205 -39.024 1500 0.005333 5.483 5.478 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.392 2.602 1.792 2.002 5.133 5.128 2.692 2.902 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 RETE ENCASING
WITH RCC 4.861=0.603 M
AT MANHOLE
BFS+PCC+CONC
CONCRET RETE ENCASING
NO Z3EM-1
OF D37-31 12 773 Z3M-31 Z3M-32 1.740 3 60.417 0.001 60.418 60.418 0.060 15 8.080 8.120 -0.04 -375.000 1500 0.01 5.478 5.468 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0 2.602 2.652 2.002 2.052 5.128 5.118 2.902 2.952 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC tolafatak
BLOCK 3-5 NOS existing
manhole
EXISTING BFS+PCC+CONC
CONCRET RETE ENCASING
OF D37-32 6.2 778.8 Z3M-32 MANHOLE 1.740 3 60.417 0.000 60.417 60.417 0.060 5.8 8.120 8.011 0.109 53.211 1500 0.003867 5.468 5.464 600 0.011 0.663 187.426 0.322 0.906 0.400 0.600 0.24 0.603 2.652 2.547 2.052 1.947 5.118 5.114 2.952 2.847 1200 1800 BRICK-B E- NP3
75 RIGHT FLANK (RF) 3.5 WITH RCC
Z3EM-1 BLOCK 3-5 NOS

* Cutting depth of Sewer Line (m):- Depth of Sewer (Col.33 & Col.34) + (0.5 X OD-ID) + 150 mm pcc depth + 75 mm thickness of Brick flat soiling
** Cutting Invert level of Manhole (m):- For Manhole TYPE A (0-1500 mm)= Depth of Sewer (Col.33 & Col.34) - 125 mm pcc depth - 75 mm thickness of Brick flat soiling ////// For Manhole TYPE B (1500 mm-3000 mm) & C (3000mm-5000 mm):- Depth of Sewer (Col.33 & Col.34) - 200 mm RCC - 75 mm pcc depth - 75 mm thickness of Brick flat soiling
# Width of Cutting:- Without Shoring= (Dia of pipe x 1.5)+300mm & With Shoring= Without shoring +600mm
PiPe line layout on mentioned Road Flank will be Changed the Position as PeR diFFeRent utility existanCe.

You might also like