BA PTM-FITTING ORIICE (1) - PCI Comment - OR
BA PTM-FITTING ORIICE (1) - PCI Comment - OR
Pada hari ini Selasa tanggal 11 bulan Oktober tahun 2022. Kami yang bertanda tangan dibawah ini :
PT. Persada Teknik Mandiri telah melakukan pekerjaan Installation of Instrument of Metering for
Allocating Hydrocarbon from West Area yang dilakukan pada tanggal 8 - 10 Oktober 2022. Detail
pekerjaan sesuai dengan Daily Activity Report yang terlampir: tidak perlu dimasukkan di keterangan karena
found some parts material are not daniel orifice standard an need to replace due to corrosion merupakan bagian dari pekerjaan CTR (kontrak) repair
(OR) daniel orifice B due to stuck (OR)
No. Deskripsi Pekerjaan Keterangan
1 Calculation of Orifice bore diameter of orifice plate Finish
2 Repair Daniel senior orifice line B due to stuck Line B - Need special customized tools to
open it due to Orifice badly corrosive,
3 Check all field instrument devices at skid (PI, PT, TI,
and found some spare part has been
TT, FT, and Barton recorder)
switch and replace from previous
4 Check and repair tubing installation at instrument
repairing process by others.
field devices (FT, PT & Barton Chart Recorder)
Wrong size of Material Teflon
5 Provide as build datasheet of above instrument
Not yet complete, please refer to Daily
equipment
Activity Report
6 Submit installation report or timesheet to company
for use and record PG Stream B, due to wrong connector,
7 Others work, materials and tools as required at site to PG Stream B has not completed
complete installation of above materials
yang tidak termasuk pada
lingkup kerja ini
Untuk menyelesaikan pekerjaan installation instrument metering di stream A dan stream B perlu
dilakukan tindak lanjut kembali. Tindak lanjut akan di lakukan pada periode November 2022. Detail
pekerjaan terlampir pada Penawaran Harga Continuation Installation of Instrument of Metering for
Allocating Hydrocarbon from West Area sebagai berikut : Service Repair of Metering at
NEB10
Error Drift Reading 25 inH2O
sebagaimana mestinya.
Barton Timer & Timer Key Existing error (material supply, installation, calibration)
dikosongkan