Maximum Processing Fee in Person in Charge Position

Service Applied For Who May Avail Documentary Requirements Detailed Steps and Duration
Processing Time Php Unit/Division

Issuance of Certificate of Owner/Developer of a 1. Duly accomplished Memorial Park 1a. Client to accomplish Php. 5,000.00
Water Table Depth for Proposed Memorial Certification Request Form Memorial Park Certification
Proposed Park /Cemetery Request Form.
Memorial Park 2. Project profile including the area
(hectares), boundaries, 1b. Review of duly accomplished
type/number/area of lots, amenities, Memorial Park Request Form
type of development, etc. and submitted documentary
requirements
3. Site Development Plan/ Scheme.
1c. Inputs proposed memorial
4. Topographic Map (plot existing park profile using iBars and
well/s or borehole/s, if any). prepares order of payment

5. Location Plan with Vicinity Map of


proposed memorial park.

6. Result of actual groundwater table


depth measurement conducted either 2 hrs
by the DPWH- District Engineering
Office who has the jurisdiction where
the proposed memorial park will be
located or upon formal request, from
the staff of NWRB.
2. Proceeds to Cashier for
7. If applicable, Water Permit Payment.
Application if the owner/developer will
develop/construct their own water
source intended for the construction,
operation and maintenance of the
proposed memorial park.
Maximum Processing Fee in Person in Charge Position
Service Applied For Who May Avail Documentary Requirements Detailed Steps and Duration
Processing Time Php Unit/Division

3. Client submits request form


together with the documents to
Record Section.

1 day
4. Records Section to receive,
record and route to EDO. Edo to
assign the request to MED.

5a. Evaluates documents and


determines location where the
measurement will be conducted
using site development plan and
topographic map submitted.

5b. Conducts actual water table


depth measurement in an open
pit excavated not less than 4.5
meters below ground surface
(mbgs) and determines if there is 3 days
presence of water to address the
issue of possible groundwater
contamination.

5c. Determines the geographical


coordinates (Latitude, Longitude)
where the measurement was
conducted.

6a. Prepares report of inspection.

6b. Prepares certificate of


groundwater table depth whether
it conforms with the allowable 4.5 1 day
mbgs or not.

6c. Inputs result of actual


measurement using iBar
Maximum Processing Fee in Person in Charge Position
Service Applied For Who May Avail Documentary Requirements Detailed Steps and Duration
Processing Time Php Unit/Division

7. Prepares, review and


approves Groundwater Table
Depth Certificate.

1 day

8. Release of Groundwater Table Monitoring and Enforcement Division (MED)


Depth Certificate. END OF PROCESS
Maximum
Detailed Steps and Processing Fee
Service Applied For Who May Avail Documentary Requirements Processing Person in Charge Position Unit/Division
Duration in Php
Time

Application/Renewal A. Mechanized Well A. Mechanized Well Drillers 1a. Client to accomplish Well
for Well Driller Drillers Driller's Annual Registration
Registration 1.  Duly accomplished well driller’s Form.
registration form with one (1) 2 x 2 picture

2.  Certificate of Registration of Business b. Review of duly Php 2,500.00


Name issued by the Department of Trade accomplished Well Driller's
and Industry (DTI) - (Individual / Sole Registration Form and
Proprietorship) documentary requirements

OR c. Inputs Well Driller Profile


  Certificate of Registration from Securities using iBars and prepares Php 5,000.00
and Exchange Commission (SEC) - order of payment
(Partnership/Corporation)

3.  Name/s of personnel with three (3) 2 hrs


years experience in mechanized well
drilling work as certified by duly registered
mechanized well driller;

OR
A holder of a bachelor’s degree in 2. Payment of Filing Fee.
geology, civil, mechanical, or other related
engineering courses with one (1) year
experience in actual drilling work.

4.      Contractor’s license issued by


Philippine Contractor’s Accreditation
Board (PCAB), if available.

5.  Financial Statement 3a. Client submits


registration form together
with the requirements to
Record Section.

1 day
6.      List of Drilling and other Equipment b. Records Section to
receive, record and route to
EDO, who assigns the
documents to the MED.

Page 4 of 8
Maximum
Detailed Steps and Processing Fee
Service Applied For Who May Avail Documentary Requirements Processing Person in Charge Position Unit/Division
Duration in Php
Time

7.      List of Completed and On-going 4a. Evaluates, reviews


Projects, indicating the following: documents submitted and
determines if applicant has
pending compliance to the
order issued by the Board
·         Name of Project (i.e. penalty on illegal drilling)
·         Exact location of Project (No., b. Prepares Certificate of
Street, Sitio, Brgy., City/Municipality, Well Driller Registration.
Province)
·         Owner
·         Year Completed
·         Office Address
1 day
·         Contact Person
·         Telephone No.
8.      Photocopy of latest Certificate of
Well Driller’s Registration, if renewal

6. Reviews and approves


Certificate of Well Driller
Registration

1 day

7. Releases Well Driler End of Process Monitoring and Enforcement Division (MED)
Certificate of Registration

Page 5 of 8
Maximum
Detailed Steps and Processing Fee
Service Applied For Who May Avail Documentary Requirements Processing Person in Charge Position Unit/Division
Duration in Php
Time

B. Manual Well B. Manual Well Drillers 1a. Client to accomplish Well Php 2,500.00
Drillers Driller's Annual Registration
Form.
1.  Duly accomplished well driller’s
registration form with one (1) 2 x 2 picture

b. Review duly accomplished


Well Driller's Registration
Form and documentary
2. Three (3) years experience in manual requirements
well drilling, as certified by a duly
registered well driller
c. Inputs Well Driller Profile
3. Certificate of Registration of Business using iBard and prepares
Name issued by the Department of Trade order of payment 2 hrs
and Industry (DTI)

2. Proceeds to Cashier for


OR payment.
Business Pemit issued by the local
government unit

3a. Client submits


registration form together
with the documents to
Record Section.

b. Record Section receives, 1 day


records and routes to EDO
who assigns the documents
to MED.

4a. Evaluates, reviews


documents submitted and
determines if applicant has
pending compliance to the
order issued by the Board
(i.e. penalty on illegal drilling)

Page 6 of 8 1 day
Maximum
Detailed Steps and Processing Fee
Service Applied For Who May Avail Documentary Requirements Processing Person in Charge Position Unit/Division
Duration in Php
Time

b. Prepares Certificate of
Well Driller Registration.
1 day
5. Reviews and approves
Certificate of Well Driller
Registration

6. Releases Well Driler End of Process Monitoring and Enforcement Division (MED)
Certificate of Registration

END OF PROCESS

Page 7 of 8
Maximum
Detailed Steps and Processing Fee
Service Applied For Who May Avail Documentary Requirements Processing Person in Charge Position Unit/Division
Duration in Php
Time

Page 8 of 8