HARGA SAT. JML.

HARGA
No. PEKERJAAN SAT. VOLUME
(Rp) (Rp)

IV. PEKERJAAN MEKANIKAL

A PEK. INSTALASI PLAMBING

1 Peralatan utama
a. Jet Pump Kap. 250 W (Sanyo) unit 1.00 3,500,000.00 3,500,000.00
b. Pengeboran + Instalasi lot 1.00 5,000,000.00 5,000,000.00
Kedalaman +/- 20 m
c. Tanki Atas (Cylinder) unit 2.00 1,250,000.00 2,500,000.00
Kap. 1 m3
d. Automatic Water Level Control (Radar) set 1.00 150,000.00 150,000.00
e. Biofil BF08 lot 1.00 6,050,000.00 6,050,000.00
Jumlah 1 17,200,000.00
2 Instalasi
2.1 Lantai Dasar
a. Pemipaan Air Bersih
- Pipa PVC AW
dia. 1" m 56.00 14,780.00 827,680.00
dia. 3/4" m 6.00 10,140.00 60,840.00
dia. 1/2" m 32.00 7,780.00 248,960.00
- Fitting lot 1.00 113,748.00 113,748.00
- Valves
Gate Valve dia. 1" bh 2.00 100,800.00 201,600.00
Kran Tembok dia. 1/2" bh 4.00 75,000.00 300,000.00
b. Pemipaan Air Kotor, Bekas & Vent
- Pipa PVC AW
dia. 4" m 12.00 89,990.00 1,079,880.00
dia. 2" m 12.00 31,850.00 382,200.00
dia. 1" m 12.00 14,780.00 177,360.00
- Fitting lot 1.00 163,944.00 163,944.00
- Floor Drain (FD) SAN EI / Setara
dia. 2" bh 2.00 125,000.00 250,000.00
3,806,212.00
2.2 Lantai Atas
a. Pemipaan Air Bersih
- Pipa PVC AW
dia. 1" m 12.00 14,780.00 177,360.00
dia. 3/4" m 10.00 10,140.00 101,400.00
dia. 1/2" m 12.00 7,780.00 93,360.00
- Fitting lot 1.00 37,212.00 37,212.00
- Valves
Gate Valve dia. 1" bh 2.00 100,800.00 201,600.00
b. Pemipaan Air Kotor, Bekas & Vent
- Pipa PVC AW
dia. 4" m 12.00 89,990.00 1,079,880.00
dia. 3" m 12.00 64,320.00 771,840.00
dia. 2" m 12.00 31,850.00 382,200.00
dia. 1" m 12.00 14,780.00 177,360.00
- Fitting lot 1.00 241,128.00 241,128.00
- Floor Drain (FD)
dia. 2" bh 2.00 125,000.00 250,000.00
- Clean Out (CO)
dia. 2" bh 2.00 65,000.00 130,000.00
3,643,340.00
2.3 Atap
a. Pemipaan Air Hujan
- Pipa PVC AW
dia. 4" m 12.00 89,990.00 1,079,880.00
dia. 3" m 12.00 64,320.00 771,840.00
- Fitting lot 1.00 185,172.00 185,172.00
- Roof Drain (RD)
dia. 4" bh 6.00 85,000.00 510,000.00
dia. 3" bh 4.00 70,000.00 280,000.00

- Bak Kontrol
Uk. 400x400 mm bh 1.00 150,000.00 150,000.00
- Galian dan urugan kembali m' 12.00 2,100.00 25,200.00
3,002,092.00
Jumlah 2 10,451,644.00

JUMLAH IV. 27,651,644.00