FAR Chemical Indursty Ltd.

(Spinning Unit)
Department Of Electrical
A/C -Plant (02) Ampere Report Date:

Check
Name Of Motor KW Line 1 Line 2 Line 3 by MO(E) Remark

Supply Air Fan-21

Supply Air Fan-22

Supply Air Fan-23

Supply Air Fan-24

Supply Air Fan-25

Supply Air Fan-26

Return Air Fan-21

Return Air Fan-22

Return Air Fan-23

Return Air Fan-24

Return Air Fan-25

Return Air Fan-26

Washer Water Pump-


21

Washer Water Pump-


22

Washer water Pump-23

Rotary Air Filter-21

Rotary Air Filter-22

Rotary Air Filter-23

Rotary Air Filter-24

Dust evacuation Fan-21

Dust Evacuation Fan-22

Dust Evacuation Fan-23

Dust Evacuation Fan-24

Check By Manager (Electrical) General Manager