Arrows pointed to 0
2) Start moving down the cylinder to the blade carefully till reach a clearance between them (
not touched each other )
3) Then put plastic under the head (cylinder+ blade) just to keep the area clean
4) Prepare the grinding liquid (poudre-001+ oil w10)
5) From HMI set the speed to 100 , then run it (inverse direction )
6) Brush whole cylinder with the liquid , repeat it many times during the grinding
7) Start lowering the cylinder a bit for both sides and in the middle as well but not too much till
you hear a little noise of grinding
Note: normally (4 times in each side, 1 time in the middle)
8) Measure the grinding area on the blade it should be 11~ 13 mm and equal in all the way on
the blade
Bed calibration
1) Disconnect the slave motor from the shaft
2) Select from HMI independent and start adjusting the master by rotation it forward and
backward till you reach the position on the level tool, this is position 0 for the BED IN
Go to the screen and set the master to position 0 then Click calibrate
Go to calibrate
shear BED
3) Connect the slave back and set it to 0 then click calibrate in HMI
- Turn the cylinder manually in production’s direction and verify the shearing using piece
of cotton as illustrated below:
Verify the shearing in both sides if it’s not good lower down the cylinder a little by adjusting the
screw shown in picture , whenever you did this you have to raise the Jog a little and lower it back ,
then check the shearing again
- using 10 mm caliper adjust the distance between the head (cylinder + blade ) and BED IN
as illustrated in picture below:
Adjust it by using this screw
- ones you finished with adjustments (190 mm and 10 mm ) , then from screen go to
calibrate cut adjusters , set both master and slave to 10 mm
Slave window
Master window