Procedure For Concrete Repair

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Plant Doc Disc.

Doc Rev
No. Index Code Type No.
Procedure for Concrete
Repair 099 A QM PL A
QM-099-PL-2251
Job No : 34-15430-3002
BI No : BI-11-19034
Jafurah Gas Compression Plants (Package-01)

JAFURAH GAS COMPRESSION PLANTS AND NORTH & SOUTH GIS (PACKAGE-01)

CONTRACT No.: 6600050508 (IK); 6600050516 (OOK)


JOB No: 34-15430-3002; BI No: BI-11-19034

DOCUMENT SUBMISSION STATUS DOCUMENT REVIEW STATUS


SAUDI ARAMCO PROJECT MANAGEMENT
TEAM

√ FIRST SUBMISSION APPROVED

RESUBMISSION WIH COMMENT AS NOTED. WORK MAY


INCORPORATED COMMENT PROCEED SUBJECT TO
COMPLIANCE WITH COMMENTS

REJECTED. REVISE AND RESUBMIT

RETAINED FOR INFORMATION

DOCUMENT CATEGORY

REVIEW DATE NAME SIGNATURE


REVIEWED BY
INFORMATION

A 10.11.2021 ISSUED FOR REVIEW


REV. ISSUE DESCRIPTION PREPARED CHECKED APPROVED
DATE BY BY BY
(QA (PROJECT
MANAGER) MANAGER)

Page 1 of
Plant Doc Disc. Doc Rev
No. Index Code Type No.
Procedure for Concrete
Repair 099 A QM PL A
QM-099-PL-2251
Job No : 34-15430-3002
BI No : BI-11-19034
Jafurah Gas Compression Plants (Package-01)

Revision History

Rev. Date Revised Pages Revision Description


No.
A 10.01.2022 NA Issued for review

Page 2 of