QM-R83-PL-4024 Procedure For Notification of Inspection Activities
QM-R83-PL-4024 Procedure For Notification of Inspection Activities
BI No.10-01868
UPGRADE ETHANE FACILITY – JU’AYMAH NGL FRACTIONATION PLANT
PROCEDURE FOR
NOTIFICATION OF INSPECTION ACTIVITIES
Page 1
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
Rev.
Date Description of Change Revised page
No.
Page 2
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
INDEX
Page 3
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
1.0 SCOPE
The Scope of this procedure is Notification of Inspection Activity together with the drawings and
applicable Saudi Aramco Standards and Material System Specifications listed in the project
documents constitute the basis for the completed work.
Page 4
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
2.0 PURPOSE
This Procedure is a “live” document and as such will be subject to periodic reviews /
changes in Line with identified and agreed amendments and improvements to the Project
Quality Management System during the course of the project.
Page 5
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
4.0 DEFINITIONS
Following items shall be used wherever mentioned in this document.
COMPANY : Saudi Aramco
SAPMT : SAUDI ARAMCO Project Management Team
CONTRACTOR : L&T Hydrocarbon Saudi Company
SAPID : SAUDI ARAMCO Project Inspection Division
5.0 ABREVIATIONS
SAEP Saudi Aramco Engineering Procedures
SAES Saudi Aramco Engineering Standard
SAMSS Saudi Aramco Materials System Specification
SAIC Saudi Aramco Inspection Checklist
SATIP Saudi Aramco Typical Inspection Plan
SATR Saudi Aramco Test Report
ITP Inspection and Test Plan
RFI Request for Inspection
QC Quality Control
NDE Non-Destructive Examination
Page 6
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
The effective cut-off date for Company standards shall be 31 st May 2018 and applicable in-
dustry standards.
Not Applicable
QM-R83-PL-4022 Procedure for Gasket Installation, Bolt Tightening & Flange Manage-
Page 7
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
ment
QM-R83-PL-4013 Procedure for Post Weld Heat Treatment – Piping
7.0 RESPONSIBILITY
Construction The Construction Engineer shall be responsible for offering all in-
Engineer spection activities to QC Inspector of respective discipline through
inspection schedule as per Approved ITPs/ SATIP.
Ensure completion of work before offering to QC Inspector.
QC Inspector - Scheduling and coordinating all Inspection activities & prepare RFI.
Discipline All detail as applicable to be filled in RFI and Inform to COMPANY
Representatives
Quality Control Liaison with COMPANY Representatives for execution of Inspec-
Supervisor tion activities as per planned schedule.
Shall resolve day to day inspection system related issues.
Quality Control
Manager Shall administer and monitor the status of RFI’s.
8.0 PROCEDURE:
Prior to start of construction activity, kick-off meeting shall be initiated with all concerned
parties to ensure full understanding on the execution requirements and control of the activi-
ties.
Page 8
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
f) An inspection point shall be initially inspected and accepted by the contractor's QC per-
sonnel and is verified by SAPMT prior to PID's inspection.
g) “Request for Inspection” (RFI) shall be forwarded through E-mail or Hard copy to COM-
PANY minimum 24 hours before for day to day work activities and 48 hours before for
weekend inspections.
h) Quality Control Manager / Quality Control Supervisor shall submit each week, a two-week
look-ahead schedule of all planned quality activities to the COMPANY representative. The
schedule shall be send electronically in a format acceptable to COMPANY.
i) Each RFI’s shall be uniquely identified for ease of tacking with a sequential number as fol-
lows:
Page 9
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
Notes:
1. *A = Sequential Number.
2. RM** = Receipt of Structural Material / RL** = Receipt of Piping Material / RD** = Receipt
of Equipment / RE&I** = Receipt of Electrical & Instrumentation Material.
3. RFI shall be on Saudi Aramco Format.
4. CONTRACTOR shall inform COMPANY in advance if (any) scheduled inspection requires
to be re-scheduled.
Quality Control Manager / Quality Control Supervisor shall maintain a Log of RFI (along with
EPM No.) submitted discipline wise in order to avoid repetition of RFI numbers for same item
and to know completion status. (Refer Attachment1: EPM-RFI Log Sheet).
8.2 INSPECTION:
a) Prior to scheduled inspection time, Construction Engineer shall ensure that all required
manpower and test equipment is available at site, safety requirements are fulfilled includ-
ing necessary work permits, safe access to the location etc.
b) Inspection results shall be clearly and legibly written on the original RFI by the QC Inspec-
tor as agreed by COMPANY representative. The result of the inspections are classified as
follows:
1. Acceptable:
When the item inspected conforms to requirements. In this case, there shall be no delay
in generating the Inspection report and it shall be signed off after the inspection.
2. RFI on HOLD:
When the inspection can be accepted only when minor corrections / inspection re-sched-
uled / additions are carried out to gain the required conformity of the item offered for in-
spection. In this case, QC Inspector puts the RFI on hold for a mutually agreed period
and all parties agree on the mode of re-inspection to finally and appropriately close the
RFI.
Page 10
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
3. Cancelled:
The Request for Inspection will be cancelled in case of inclement weather conditions or
Lack of proper safety requirements or lack of / non availability of Measuring Tools and
Equipment etc. CONTRACTOR shall inform the respective SAPID prior to inspection
time for RFI cancellation.
4. Rejected:
The item offered for inspection does not confirm to Project requirements and the defi-
ciency cannot be corrected within the “RFI on HOLD” period. The valid reason of rejec-
tion shall be written on the RFI by the QC inspector who is rejecting the offered inspec-
tion.
c) The result of inspection shall be communicated and explained to the concerned Construc-
tion Engineer.
An inspection points beyond by which an activity shall not proceed without the atten-
dance/approval of the relevant Saudi Aramco inspection unit. QC Inspector shall pro-
vide sufficient notification.
An inspection point where the SAPID shall be notified of the timing of inspection or
test in advance. Timing agreement is dependent on SAPID and SAPMT agreement at
the start of a project. The activity covered in this type of inspection/test request may
proceed as scheduled, if the SAPID representative did not show up at or before the
requested inspection time.
Page 11
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
9.0 ATTACHEMENTS
ATTACHMENT: 1 EPM-RFI Log Sheet
ATTACHMENT: 2 RFI Form
Page 12
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
Page 13
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
Page 14
of 15
Doc In- Disc.
Plant No. Doc Type Rev. No.
dex Code
R83 A QM PL 00
QM-R83-PL-4024
PROCEDURE FOR NOTIFICATION OF
INSPECTION ACTIVITIES
Page 15
of 15