In Article " Earthing Systems Design steps – Part One ", I indicated the following points:

Earthing Systems Design Steps

A grounding system design process has (3) main steps:


Follow Us on
1. Data Collection,
2. Data Analysis,
3. Grounding Design Calculations.
Related Posts Plugin for WordPress, Blogger...

In the above Article and Article " Earthing Systems Design steps – Part Two ", I explained the first step: Data Collection.

Also, in Article " Earthing Systems Design steps – Part Three ", I explained the second step: Data Analysis.

And in Article " Earthing Systems Design steps – Part Four ", I explained What we are going to design for grounding system in any building?

What we are going to design for grounding system in any building?

Grounding system in any building can be broken down into several subdivisions:

1. The building exterior grounds,


2. The electrical service grounding,
3. The building interior bonding,
4. Equipment grounding and bonding,
5. Lightning protection.

In this Article, I explained the Building Exterior Grounds and Today I will explain Other Building’s Earthing System Divisions as follows.

You can preview the following Articles for more info:


Introduction to Grounding System Design – Part One
Introduction to Grounding System Design – Part Two
Types of Earthing System – Part One
Types of Earthing System – Part Two
How to Select the Best Earthing System
Earthing System Components – Part One
Earthing System Components – Part Two
Earthing System Components – Part Three
Electrical Properties of the Earthing System

Second: Electrical Service Grounding

Article 230 of the NEC contains the requirements for installing electrical services for buildings and dwellings.

Note:

Electrical designers, however, should keep in mind that local authorities, including
local electrical utilities, often have requirements which supersede or augment the
NEC. Electrical designers should contact the local authorities and determine if

1 of 7 16/11/2021, 14:25
Earthing Systems Design steps – Part Five ~ Electrical Knowhow http://www.electrical-knowhow.com/2013/11/electrical-service-groundin...

requirements for electrical services exist which differ from the NEC.

NEC Requirements for grounding electrical services

The requirements for grounding electrical services are contained in Article 250 of the NEC as follows:
1- Section 250-24(a) requires that a grounded electrical system, which supplies a building or structure, shall have at each service a grounding electrode conductor
connected to the grounding electrode system.

2- The grounding electrode conductor shall also be connected to the grounded service conductor in order to:

Limit the voltage to ground imposed on the system by lightning, line surges, and (unintentional) high-voltage crossovers. 
Stabilize the voltage to ground during normal operation, including short circuits.

3- This connection may occur at any accessible point from the load end of the service drop or service lateral to the grounded conductor (neutral) terminal block in
the service disconnecting means. There are Three locations where 250.24(A)(1) permits the grounding electrode conductor to be connected to the ground service
conductor as follows (see fig.1):

At load end of service drop,


In accessible meter enclosure,
In service disconnecting means.

Fig-1

4- Outdoor installations (like Outdoor Transformers) must have a grounding electrode, either at the transformer or elsewhere outside the building which must be
connected to the grounded service conductor. Fig.2 illustrates two grounding electrode connections, one at the service equipment installed inside the building
and one installed at the transformer, located outside of the building.

2 of 7 16/11/2021, 14:25
Earthing Systems Design steps – Part Five ~ Electrical Knowhow http://www.electrical-knowhow.com/2013/11/electrical-service-groundin...

Fig-2

Third: The Building Interior Bonding

Keep in mind that the purpose of bonding is different from that of grounding as in below table:

Bonding Grounding
definition Bonding is connecting Metallic Grounding is an intentional connection to
components of electrical systems to the earth or some other conducting body
ensure electrical continuity of the that serves in place of the earth.
components and the capacity to
conduct safely any fault Current
likely to be imposed.

The purpose The purpose of bonding is to create The purpose of grounding conductive
an equipotential plane that ensures materials, such as metal raceways and
that all metallic components are at equipment enclosures, is:
the same potential to ground.

1. To limit and stabilize the voltage to


ground on such enclosures because
Unintentional contact with higher
voltage lines or lightning strikes
results in increased voltages on the
electrical equipment.
2. To provide a low impedance path for
ground-fault current. The low
impedance path ensures that the
overcurrent device which is
protecting the conductors will
operate.

The Building Interior Bonding

Building Interior Bonding can be broken down into several subdivisions:

1. Bonding of Equipment for Services.


2. Bonding for Other Systems
3. Bonding Other Enclosures.
4. Bonding for Over 250 Volts
5. Bonding of Piping Systems and Exposed Structural Steel.
6.
Bonding of Interior Metal Columns and Beams.

3 of 7 16/11/2021, 14:25
Earthing Systems Design steps – Part Five ~ Electrical Knowhow http://www.electrical-knowhow.com/2013/11/electrical-service-groundin...

1- Bonding of Equipment for Services

Definition:

Service equipment is any equipment necessary for the main control and means of
cutoff of the supply of electricity to a building or structure.

1.1 Requirements for Bonding of Equipment for Services

The following service equipment must be effectively bonded together:


Service raceways, cable trays, service cable armor/sheath, cablebus framework, service equipment enclosures and any metallic raceways which
contain a grounding electrode conductor.
All enclosures containing service conductors, including meter fittings, boxes, or the like, interposed in the service raceway or armor

Note:

Standard locknuts, sealing locknuts, and metal bushings are not acceptable as the
sole means for bonding a raceway or cable to an enclosure on the line side of the
service disconnecting means regardless of the type of or condition of the knockout
(see fig.3).  Electrical continuity has to be ensured through the use of a supply-side
bonding jumper that connects the raceway to the enclosure.

Fig-3

1.2 Bonding Methods of Equipment for Services

Five basic methods are listed, any one of which can be used to bond the service equipment together:

The first method: using the grounded service conductor. On the line side of the service equipment there is no separate equipment grounding
conductor. The grounded conductor assumes this role on the line side of the service. The permissible means for any connection made to the grounded
conductor include CADWELD exothermic welded connections, listed pressure connectors (wirenuts), listed clamps, and other listed means.

The second method: using threaded connections. This includes threaded couplings or bosses. It is important that these connections be made
wrenchtight to ensure a low impedance connection.

The third method: using threadless couplings or connectors. These fittings are available for rigid metal conduit, intermediate metal conduit and EMT.
Once again it is important that the connections be made up wrenchtight to ensure the low impedance ground path. Installers should note that the NEC
specifically prohibits the use of standard locknuts or bushings, even if a double arrangement is used, (one on the inside and one on the outside) to
achieve the bonding required by this section.

4 of 7 16/11/2021, 14:25
Earthing Systems Design steps – Part Five ~ Electrical Knowhow http://www.electrical-knowhow.com/2013/11/electrical-service-groundin...

The fourth method: using bonding jumpers. Bonding jumpers ensure electrical continuity by providing a low impedance path across concentric or
eccentric knockouts that may be part of the service equipment.

The fifth method: using other approved devices. This would include fittings such as bonding-type locknuts and grounding bushings (see fig.4). These
fittings are designed to make good contact with the metal enclosure and help to ensure good electrical continuity.

Fig-4

2- Bonding for Other Systems


Other systems (communication circuits, radio and television equipment and CATV circuits) may be present in the building or structure. An accessible
means must be left at the service equipment, in an external location, which can be used for connecting bonding and grounding conductors of other
systems (see fig.5). Recall NEC Section 250-58 requires a common grounding electrode system to be installed and prohibits separate grounding system
installations to minimize the occurrence of potential differences in equipment in which multiple systems interface.

Fig-5

There are three permissible methods to facilitate the interconnection of these systems:

1. The first method: using the exposed metallic service raceways. 

5 of 7 16/11/2021, 14:25
2. The second method: is to connect to the exposed GEC. 
3. The third method: is to bond a copper or other corrosion-resistant conductor of at least a No. 6 AWG copper, to the service raceway or equipment.

3- Bonding Other Enclosures

In addition to the service equipment enclosures, other noncurrent-carrying enclosures are also required to be bonded by the NEC. Section 250-96
requires that metal raceways, cable trays, cable armor, cable sheaths, enclosures, frames, fittings and any other metal noncurrent-carrying parts be
bonded if they are to serve as grounding conductors. This requirement applies regardless of whether a supplementary equipment grounding conductor
is present. 

The purpose of this rule is to ensure that these metallic components cannot become energized because they are isolated from a low impedance ground
path. If these components were not properly bonded and they were to become energized due to some fault condition, the overcurrent device may not
operate. This would result in personnel being put at risk to serious electrical shock hazards. 

Note:

Prior to making any bonding or grounding connection, Any nonconductive paint,


enamel, or similar coating shall be removed from the metal surface to which they
are making a connection. Failure to do so could drastically increase the impedance
of the ground path.

In the next Article, I will continue explaining Other Building Interior Bonding Divisions. Please, keep following.

Back To Course EE-5: Grounding System Design Calculations

Leave a comment to help all for better understanding

<< Earthing Systems Design steps – Part Home Review for Course WR-2: Inspect
Six Conduits, Junction and Pull Boxes >>

Subscribe to: Post Comments (Atom)


Building wiring solutions - Grounding Design Future of renewable energy Introduction to Grounding
Wiring devices Calculations – Part Four System Design – Part One

Ad id-smartoutlet.com electrical-knowhow.com Ad MHI Group electrical-knowhow.com

UV test chamber - Test EE-4: Basic Electrical design Non-Dwelling Buildings Load Electrical Load Calculator for
equipment Made in Germany course – Level III Calculations- Part Four Non-Dwelling Buildings

Ad pse.de electrical-knowhow.com electrical-knowhow.com electrical-knowhow.com

You might also like