Rev.

0
METHOD STATEMENT FOR TOUCH-UP PAINT
AND REPAIR OF UNITIZED CURTAIN WALL Page | 1

Table of Contents
1.SCOPE .......................................................................................................................................2
2. REFERENCES ............................................................................................................................2
3. RESPONSIBILITIES ....................................................................................................................2
4. PAINTING PROCEDURE............................................................................................................4
5. SITE SAFETY INSTRUCTIONS ....................................................................................................5

1. SCOPE

WIDUS TOWER 4
Rev.0
METHOD STATEMENT FOR TOUCH-UP PAINT
AND REPAIR OF UNITIZED CURTAIN WALL Page | 2

The purpose of this method statement is defined and guide to painting and
coating works for Widus Tower 4 Project. This method statement is applicable to
the repair and touch paint for the unitized curtain wall and support at site
application.

2. REFERENCES

2.1 Project standards:

 The latest revision of the following project specifications shall be used as


references and is part of this method statement in the execution of work.

2.2 American Architectural Manufacturers Association (AAMA)

2.3 American Society for Testing and Materials (ASTM)

3. RESPONSIBILITIES:

3.1 Construction Supervisor or Foreman

• Responsible for the execution and management of the construction safety,


quality, progress control and follow-up of all the relevant plans.
• Assist in compilation of Repair and Touch-up Painting Construction Procedure.
• Check the issuance of the equipment and materials
• The supervisor shall carry out the work for the areas designated by Project
Manager and QC Inspector

WIDUS TOWER 4
Rev.0
METHOD STATEMENT FOR TOUCH-UP PAINT
AND REPAIR OF UNITIZED CURTAIN WALL Page | 3

3.2 QC Inspector

• Executes the specific inspections on materials, equipment and repair activities on


project site.
• Checks surface preparation and Verifies the correct color during touch-up.
• Check the visual appearance after the repair and touch-up

3.2 Painting Technicians

• The Painting Technicians shall be responsible for the selection of adequate


instruments, equipment, tools, materials, filling-out of the required forms.
• Completion of the work using correct methods under the supervision of the
Supervisor, foreman and QC Inspector.

3.3 Safety officer

• The safety officer shall work with the supervisor to insure all the personnel
involved ware proper PPEs.
• Check the all signs and barricade and monitor the area when the repair and
touch-up paint work is going on.

WIDUS TOWER 4
Rev.0
METHOD STATEMENT FOR TOUCH-UP PAINT
AND REPAIR OF UNITIZED CURTAIN WALL Page | 4

4. PAINTING PROCEDURE

4.1 RECEIVING AND STORING OF MATERIALS

• All paint materials received must be check and free from damage
• Checks on the batch number and expiration date.
• All touch up paint and solvent shall be stored in a well-ventilated place at storage
temperatures as recommended in the Manufacturer's data sheet.
• Coating materials used at construction sites must be covered with appropriate
canvas, tarpaulins, or equivalent for a temporary storage.
• Touch up material shall be same as or compatible to the shop applied coating.

4.2 SURFACE PREPARATION

• Make sure the surface is clean, dry and free of grease and oil. If needed, use a
mild solvent and a clean cloth to wipe down the surface. Glossy surfaces should
be dulled using a medium to fine grit sand paper. This will ensure proper
adhesion of the touch-up paint.
• Using an aerosol spray paint can to touch up a smaller area, it is a good idea to
mask any areas where touch-up paint is undesirable. Masking tape, paper or
plastic sheeting can be used. Another great masking material is aluminum foil. It
can be pressed into place to create an impermeable barrier.
• If you are still uncertain about your chosen touch-up process, it is always best to
test it on a scrap part or in an inconspicuous area to determine if the results will
be acceptable.
• For the damaged and dent surfaces to be applied with ready mix putty to ensures
a smooth and even finish and it should be feathered with sand paper for
subsequence preparation for coating systems.

WIDUS TOWER 4
Rev.0
METHOD STATEMENT FOR TOUCH-UP PAINT
AND REPAIR OF UNITIZED CURTAIN WALL Page | 5

4.3 TOUCH-UP OF PAINT

• Always shake an aerosol spray paint can for at least 1 min after the mixing balls
begin to rattle. If the mixing balls are not rolling freely, turn the can upside down
and tap the bottom of the can with the palm of your hand to free them. It is
possible that the color and gloss of the paint will change if the paint is not shaken
properly.
• When spraying, always hold the can upright, 10 to 12" from the surface. For best
results, spray with even misting passes. When a smooth, continuous film has
been achieved, the paint will have a wet look. Allow the paint to dry 5 min and
then continue. Shake the can periodically between coats.
• When you are finished, prepare the can for storage. Hold the aerosol can upside
down and spray until you see a white gas (2 to 3 sec). This will clear the valve
and prevent paint from drying in the spray tip.

5.0 SITE SAFETY INSTRUCTIONS

5.1 All workforces are provided with the following personal protective equipment:

• Safety shoes
• Safety Helmet
• Safety goggles
• Fire hazard sign
• Dust and cartridge mask
• Fabric and rubber gloves
• Fire extinguisher

WIDUS TOWER 4
Rev.0
METHOD STATEMENT FOR TOUCH-UP PAINT
AND REPAIR OF UNITIZED CURTAIN WALL Page | 6

5.2 STORAGE OF PAINT MATERIALS

• Store flammable liquid in a secure, well-ventilated area away from heat, flames
and hot work areas.
• Provide warning signboard such as “No Smoking” and MSDS in place.
• Materials that have exceeded the coating manufacturer’s recommended shelf life
shall not be used.

5.3 PAINTING WORK

• Prevent contact of paint and solvents with eyes and skin.


• All waste paint can, cleaning solvents, etc. must be properly disposed of at an
approved disposal area.
• Personnel involve shall wear respirator type mask or cartridge type.
• Paint on work at height shall have safe working platform and wear full body
harness.

WIDUS TOWER 4