This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

A 2 11414
D 2 11395
0S2

22809

0S2

0S2
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

1489075 WELD SIZE WELD WELD


NO (IN) TYPE CAT
0S2

10
75

45
00

0S2
13
20

31
80

45
00

BOLT LIST
BOLT SIZE LENGTH
No (IN) (MM)

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


REASON FOR MODIFICATIONS BY SUBCONTRACTOR:
SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
ADJUSTMENT FOLLOW ACTUAL PIPE LENGTH WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S1 14 / 09 / 2020 AS-BUILT MARK UP 0S2 23/ 12/ 2022 AS- BUILT MARK UP DRAWING
NO ISO of S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

A 2 11400
0S2 B 2 11425

0S2 22825

0S2
S6.1
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT
S010
14
00

0S2
45
00

CONT. ON
HL-27163-01 DWG 03 S010 2 WE F
E 2186130
0S2
N 1511900
EL +108034
45
00

10
25

34
75

006

45
0 0

BOLT LIST
BOLT SIZE LENGTH Bui Van Hoi
No (IN) (MM) 2022.12.26
34 08:03:18 +07'00'
25

1489075
SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

REASON FOR MODIFICATIONS BY SUBCONTRACTOR:


SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
ADJUSTMENT FOLLOW ACTUAL PIPE LENGTH PACKAGE A1 - OLEFINS PLANT
WELD

1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD


2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S1 14 / 09 / 2020 AS-BUILT MARK UP 0S2 23/ 12/ 2022 AS- BUILT MARK UP DRAWING
NO ISO of S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

0S2 A 2 11400

0S2
11400

0S2
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT
0S2

0S2

70
0

38
00

010

1523300

< A > 5.1


31
00

14
0 0

BOLT LIST
BOLT SIZE LENGTH
No (IN) (MM)

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
CONT. ON e.g.: line support
PRF
HL-27163-01 DWG 02 STD or SPC support welded to pipe at
E 2186130 workshop during pipe spools prefabrication X
Z
N 1511900 MRS
EL +108034 STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

REASON FOR MODIFICATIONS BY SUBCONTRACTOR: SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


ADJUSTMENT FOLLOW ACTUAL PIPE LENGTH SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S1 14 / 09 / 2020 AS-BUILT MARK UP 0S2 23/ 12/ 2022 AS- BUILT MARK UP DRAWING
NO ISO of S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

A 2 11386

0S2
0S2
11386
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST 10
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT
0S2

S013 2 WE F

0S2

4500

BOLT LIST
BOLT SIZE LENGTH
45 No (IN) (MM)
00

1523300

SUPPORT SYMBOLOGY
COM STD or SPC support common
700 to more than one line Y
e.g.: line support
S013 PRF
S10.1 STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

0S2
E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


REASON FOR MODIFICATIONS BY SUBCONTRACTOR:
SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
ADJUSTMENT FOLLOW ACTUAL PIPE LENGTH WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S1 14 / 09 / 2020 AS-BUILT MARK UP 0S2 23/ 12/ 2022 AS- BUILT MARK UP DRAWING
NO ISO of S2
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia

You might also like