This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

B 2 3630
C 2 250 5474

PTSC-GJ-001M1
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

F
F

3A PTSC-GJ-001M1 2 BW F

5A 041 2 BW F
5A 005M1 2 BW F

LEE
CHOON
HOE
2022.09.1
6 14:13:21
Bui Van Hoi
+07'00' 2022.09.20
08:55:55
+07'00'
290
LEE CHOON
HOE
2022.06.09
17:16:00
+07'00' Bui van Hoi
2022.06.11
07:12:00
+07'00'

Franck
Chenuil
2020.11.2
LEE 4
STD CHOON
BOLT LIST HOE 10:13:08
WG01-2-CS 2022.09.0 +07'00'
/ BOLT SIZE LENGTH 8 10:35:41
No (IN) (MM) +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
340 STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
250 INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
041 For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
<C> 1.3 INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
STD NPD INS. INS. THK Standard Piping Support
WG01-2-CS (inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00
005M1
/

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S3
0S7 09 12/
15/ / 062022
/ 2022 AS-BUILT MARK UP 0S6
0S4 0728/09/2022
/ 09 / 2022 AS-BUILT MARK UP 0S5 15 / 09 / 2022 AS-BUILT MARK UP DRAWING
NO ISO of S5
0S7
0S6
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

7657
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

3A 007M1 2 BW F

0S7

4795

0S7

007M1

BOLT LIST
Phan Van Thai Bui Van Hoi
BOLT SIZE
No (IN)
LENGTH
(MM) 2022.12.21 2022.12.22
13:53:47 +07'00' 09:12:19 +07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C
REASON FOR MODIFICATIONS BY SUBCONTRACTOR:
CUT AND REWELD DUE TO SHOP FABRICATION ERROR SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S3
0S7 09 12/
15/ / 062022
/ 2022 AS-BUILT MARK UP 0S6
0S4 0728/09/2022
/ 09 / 2022 AS-BUILT MARK UP 0S5 15 / 09 / 2022 AS-BUILT MARK UP DRAWING
NO ISO of S5
0S7
0S6
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

24556
B 2 10777
C 2 2165
D 2 9770
B 2 8571
E 2 1220
F 2 986

8 Grounding lug 2 1
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

F
F
F
F
F
< E > 1.5 F

5A 042 2 BW F
< F > 1.6 5A 043 2 BW F
12 044
20 5A LUG17-2 2 UD F
0S7 0S7 5A 044 2 BW F
47 5A 045 2 BW F
1
045
51
5

29
60
STD
WG01-2

0S7

30 0S7 LUG017-2
11
042
8.1
60 LEE
0 LEE CHOON
BOLT LIST CHOON HOE
20 < C > 1.3 HOE 2022.09.0
020
600 BOLT SIZE LENGTH 2022.09.1 Phan Van8Thai
10:34:50
No (IN) (MM) 6 14:12:53 +07'00'
2022.12.21
740 +07'00'
13:53:57 +07'00'

1175 043
SUPPORT SYMBOLOGY
250 COM STD or SPC support common
to more than one line Y
4220 e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
ARE BASED ON
4500 S-
Special Piping Support
SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

REASON
REASON FOR FOR MODIFICATION
MODIFICATIONS BY SUBCONTRACTOR:
BY SUBCONTRACTOR: SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM
REASON FOR MODIFICATION
ADD CHANGE WELD
GROUNDING JOINT
LUG BYTSI
NO.
AS PER SUBCONTRACTOR:
AS PER
0551QC REQUEST. SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
MODIFY LOCATION
ADD JOINT OF GROUNDING
AS PER SITE CONDITIONSLUG WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S3
0S7 09 12/
15/ / 062022
/ 2022 AS-BUILT MARK UP 0S6
0S4 0728/09/2022
/ 09 / 2022 AS-BUILT MARK UP 0S5 15 / 09 / 2022 AS-BUILT MARK UP DRAWING
NO ISO of S5
0S7
0S6
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

23260
A 2 11640
B 2 11620
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

4500
WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT
F
F
F

F
1050 F
F
F

3450

4520

<A> 3670

830

4490
<B>
020

LEE
CHOON
BOLT LIST HOE
BOLT SIZE 2022.09.0
LENGTH
No (IN) (MM) 8 10:34:38
+07'00'

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
4500 Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S3
0S7 09 12/
15/ / 062022
/ 2022 AS-BUILT MARK UP 0S6
0S4 0728/09/2022
/ 09 / 2022 AS-BUILT MARK UP 0S5 15 / 09 / 2022 AS-BUILT MARK UP DRAWING
NO ISO of S5
0S7
0S6
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

22991
A 2 11361
B 2 11630
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

4500 WELD LIST


Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT
F
F
F
F
1800 F
F
F
2700

4235

<A> 250

4510

<B> BOLT LIST LEE CHOON HOE


2022.09.08
10:34:26 +07'00'
BOLT SIZE LENGTH
No (IN) (MM)

SUPPORT SYMBOLOGY
4500 COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S3
0S7 09 12/
15/ / 062022
/ 2022 AS-BUILT MARK UP 0S6
0S4 0728/09/2022
/ 09 / 2022 AS-BUILT MARK UP 0S5 15 / 09 / 2022 AS-BUILT MARK UP DRAWING
NO ISO of S5
0S7
0S6
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

23255
A 2 11665
B 2 11590

4500
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT
F
F
F
F
2370 F
F
2130 F
F

4500

026

4500

535

3970

4470

LEE
CHOON
BOLT LIST HOE
3150 2022.09.08
BOLT SIZE LENGTH 10:34:14
No (IN) (MM) +07'00'

<B>
SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S3
0S7 09 12/
15/ / 062022
/ 2022 AS-BUILT MARK UP 0S6
0S4 0728/09/2022
/ 09 / 2022 AS-BUILT MARK UP 0S5 15 / 09 / 2022 AS-BUILT MARK UP DRAWING
NO ISO of S5
0S7
0S6
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

23310

A 2 11640
B 2 11670
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT

1370 F
F
F
F
F
F
F
4530

4460

<A> 1280

3200

4520
031

LEE
CHOON
BOLT LIST HOE
2022.09.08
BOLT SIZE LENGTH 10:34:03
3950 No (IN) (MM) +07'00'
<B>

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S3
0S7 09 12/
15/ / 062022
/ 2022 AS-BUILT MARK UP 0S6
0S4 0728/09/2022
/ 09 / 2022 AS-BUILT MARK UP 0S5 15 / 09 / 2022 AS-BUILT MARK UP DRAWING
NO ISO of S5
0S7
0S6
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
This Isometric is Auto Generated from SPOOLGEN based on the Engineering Isometric and DOES NOT require signature

P & ID
PIPING SPEC. SPEC. CORR. ALL. DES. PRESS. OPER. PRESS. DES. TEMP. OPER. TEMP. TEST PRESS. TRACING PAINT
PWHT NDT
CUT PIPE LENGTH BILL OF MATERIAL SKETCH LIST
N SPEC. MATERIAL RATING (mm) (kg/cm²q) (kg/cm²q) (°C) (°C) (kg/cm²q) (°C) NO
PIECE SIZE
No. (IN)
LENGTH POS DESCRIPTION
(MM) NO
THK1 THK2 ASBL/
DEST
IDENT DIAMETER QTY
(PCS/MM)

22202

A 2 11670
B 2 7684
C 2 2848

550 8 Grounding lug 2 1


The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly,

4480
transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the

WELD LIST
Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28th December 2017, as amended, supplemented and/or restated from time to time.

WELD SIZE WELD WELD


NO (IN) TYPE CAT
4510 F
F
F
F
2130 F
F
F
2360

5A LUG017-1 2 UD F

39 5A LUG001- 2 UD F
00
0S7

60
0

8.1
LEE
LUG017-1
LUG001 CHOON
HOE
2022.09.1
6 14:12:32
0S7 +07'00'

LEE
CHOON
HOE
BOLT LIST 2022.09.0 Bui Van Hoi
8 10:32:08 Phan Van Thai
2022.09.12
BOLT SIZE LENGTH +07'00'
No (IN) (MM) 17:43:282022.12.21
+07'00' 13:54:12 +07'00'
<C>

SUPPORT SYMBOLOGY
COM STD or SPC support common
to more than one line Y
e.g.: line support
PRF
STD or SPC support welded to pipe at
workshop during pipe spools prefabrication X
Z
MRS
STD or SPC support device covered
INPUT AND OUTPUT
by Material Requisition DATA FOR PIPELINE
For relevant Material Requisition numbers refer to MTO-1313.01 EFFORT ANALYSIS
SPC
Special Piping Support ARE BASED ON
S- SYSTEM OF
INSULATION Refer to supp. dwgs collection DW-1360.00
COORDINATES AS
STD IN THE DRAWING
NPD INS. INS. THK Standard Piping Support
(inch) TYPE (mm) Refer to supp. dwgs collections STC-1391.00 to STC-1398.00

E&C

REASON FOR MODIFICATIONS BY SUBCONTRACTOR: SYMBOLOGY PETROCHEMICAL COMPLEX IN SOUTH VIETNAM


ADD GROUDING
REASON LUG AS PERBY
FOR MODIFICATION TSISUBCONTRACTOR:
0551 SPOOL ID. TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
MODIFY LOCATION OF GROUNDING LUG WELD PACKAGE A1 - OLEFINS PLANT
1) ALL DIMENSIONS ARE IN MILLIMETERS FIELD WELD
2)DIMENSIONS AND LAYOUT OF SOCKET WELDED AND THREADED LINES ARE INDICATIVE ONLY AND SHALL BE CHECKED REFERENCE 1) CONSTRUCTION LINE LIST: OL1-2P91-0XXX (UNIT) 5)CONSTRUCTION SPECIFICATION FOR PIPING PREFABRICATION ERECTION AND ISOMETRIC
AT JOB SITE BEFORE ERECTION DOCUMENTS 2) PIPING INSULATION/PAINTING SUMMARY: OL1-2P91-0XXX (UNIT) NON DESTRUCTIVE EXAMINATION: OL1-2P92-0007. LINE NO
NOTES TRACED ID
3) ISOMETRIC SKETCHES PREVAIL OVER 2D PIPING LAYOUT AREA DRAWINGS FOR DESIGN 6)FOR STRESS CALCULATION ANALYSIS FLEXIBILITY LEVEL AND STRESS
4) NO WELD AND CUT TO BE PROVIDED IN AREA LIMIT INDICATION. CONSTRUCTION CONTRACTOR TO IDENTIFYWELDING 3) TECHNICAL PIPING SPECIFICATION AND CLASSES: OL1-2R04-0001
CONDITION CALCULATION NOTE NUMBER: OL1-2P05-000X SUPPORT CLIENT DWG
POINT ACCORDING TO CONSTRUCTION STRATEGY 4) TECHNICAL SPECIFICATION FOR PIPING PREFABRICATION AND ERECTION:OL1-2P92-0012
5) IF CALCULATION NOTE IS ATTACHED TO THE ISOMETRIC:NO CHANGE WITHOUT STRESS APPROVAL POSITION DOC NO CLASS CLASS 2
Page Rev.
0S3
0S7 09 12/
15/ / 062022
/ 2022 AS-BUILT MARK UP 0S6
0S4 0728/09/2022
/ 09 / 2022 AS-BUILT MARK UP 0S5 15 / 09 / 2022 AS-BUILT MARK UP DRAWING
NO ISO of S5
0S7
0S6
REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. REV DATE DESCRIPTION PREP CHECK APPR. Project MTO Area Num. Doc.Type Service Code Sequence Subline

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia

You might also like