Glover - Lodging House

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

LAND USE & ZONING

LINE & GRADE

PERSPECTIVE
ARCHITECTURAL

STRUCTURAL

SANITARY

THIS SITE

LOCATION PLAN ELECTRICAL

MECHANICAL
SITE DEVELOPMENT PLAN

PROPOSED TWO STOREY


LODGING HOUSE
B B
A B C D E F G A B C D E F G

1 1 FLR. LN.

TYPE PANEL DOOR TYPE FLUSH DOOR


HINGES 4 - 3.5 x 3.5 LOOSE PIN HINGES 4 - 3.5 x 3.5 LOOSE PIN
SETS 10 - SET SETS 1 - SETS
A A

2 2

3 3

GROUND FLOOR PLAN ROOF DECK PLAN


TYPE SLIDING WINDOW TYPE SLIDING WINDOW
GLASS 4 - 6mmTHK GLASS 2 - 6mmTHK
PANELS 4 PANELS 2
FLR. LN. SETS 10 - SETS SETS 10 - SETS

SCHEDULE OF DOORS AND WINDOWS

B A B C D E F G 3 2 1
A B C D E F G

LEGEND:
1

3
LONGITUDINAL SECTION AA CROSS SECTION BB

SECOND FLOOR PLAN

A B C D E F G 3 2 1 G F E D C B A 1 2 3

FRONT ELEVATION RIGHT SIDE ELEVATION REAR ELEVATION LEFT SIDE ELEVATION

PROPOSED TWO STOREY


LODGING HOUSE
A B C D E F G

B C D E F G

1 1

2 2

3 3

ROOF DECK FRAMING PLAN

FOUNDATION PLAN

X - AXIS

Rebars @ Length

Rebars @ Width

Y - AXIS
Note: EXTERIOR WALL USE 150mm THK. CHB
INTERIOR WALL USE 100mm THK. CHB
SCHEDULE OF
COLUMN
10MMØ VERT. BARS C1
SPACED @ 600 O.C.
CHB WALL PLAN 300

A B C D E F G

2ND FLR. TO ROOF BEAM


FFL
R.C. SLAB ON FILL
NAT. GRADE LINE LONG SPAN

VARY

300
(L2) (L1) (L3)
L2/4 L1/4 L1/4 L3/4
NGL 10MMØ HOR. BARS SPACED

EXCAVATION DEPTH
@ EVERY 3RD LAYER
75
MAIN BAR: 6 - 16Ømm

600 (MIN.)

50
10MMØ TEMPERATURE BAR 75 TIES: (See Note)
SPACED @ 300 O.C. TOP BARS @

L4/4
THICKNESS

FOUNADTION TO SECOND FLR.


SHORT SPAN
300

200

SHORT SPAN
3-10MMØ LONGITUDINAL BARS

75

(L4)
300
400 100MM THICK WELL-COMPACTED GRAVEL
BED AT 95% MAXIMUM DRY DENSITY BOT. BARS @
LONG SPAN TOP BARS @
1 DETAIL OF WALL FOOTING

L4/4
LONG SPAN
SECTION
MAIN BAR: 8 - 16Ømm
fc' = 4000 psi (27.57 Mpa) BOT. BARS @
TIES: (See Note)

L5/4
SHORT SPAN
fy = 40,000 psi 20mm dia. and below

(L5)
fy = 60,000 psi 25mm dia. and above
Note: Mininum Slice Length = 40 x Bar Diameter
TIES - 6 @ 50mm, 7 @ 75mm, 8 @ 100mm, Rest @ 200mm O.C.
SCHEDULE OF FOOTING fc' = 3,000 psi
FOOTING DIMENSION (mm) REBARS ALONG fy = 40,000 psi (20mmØ and below) PLAN
FOOTING NO. REMARKS
X- AXIS Y - AXIS DEPTH THICKNESS X- AXIS Y - AXIS
LONG SPAN LONG SPAN LONG SPAN
F1 1400 1400 1600 300 16mmØ 16mmØ SQUARE (L2) (L1) (L3)
(L2/4) L1/4 L1/4 (L2/4)

TOP BARS ALONG LONG SPAN, (CONT. EDGE)


TOP BARS ALONG SHORT SPAN, (DISCONT. EDGE)

SLAB THICHNESS
2
SECTION
BOT. BARS ALONG SHORT SPAN
BOT. BARS ALONG LONG SPAN

BEAM LENGHT

3 L/4
DISCONTINOUS END
L/2
MIDSPAN
L/4
CONTINOUS END CONTINOUS END
L/4 WIDTH WIDTH SCHEDULE OF SLAB REINFORCEMENT
TOP BARS SPACED ALONG BOTTOM BARS SPACED ALONG
MARK THICKNESS
SHORT SPAN LONG SPAN SHORT SPAN LONG SPAN
EXTRA TOP BARS S1 150mm 12mmØ @ 125mm O.C STRAIGHT EVERY 4 BARS 100mmØ @ 300mm O.C STRAIGHT E.O.B. 12mmØ @ 220mm O.C STRAIGHT 12mmØ @ 300mm O.C STRAIGHT
STRAIGHT TOP BARS SEE STIRRUPS SPACING S2 150mm 12mmØ @ 150mm O.C STRAIGHT EVERY 4 BARS 100mmØ @ 300mm O.C STRAIGHT E.O.B. 12mmØ @ 250mm O.C STRAIGHT 12mmØ @ 300mm O.C STRAIGHT
SEE STIRRUPS SEE STIRRUPS

DEPTH

DEPTH
SPACING SPACING CB1 125mm 12mmØ @ 150mm O.C STRAIGHT EVERY 4 BARS 100mmØ @ 300mm O.C STRAIGHT E.O.B. 12mmØ @ 250mm O.C STRAIGHT 12mmØ @ 300mm O.C STRAIGHT

30MM COVER

30MM COVER
L/5 L/5 L/5
EXTRA BOT. BARS
STRAIGHT BOT. BARS 30MM COVER 30MM COVER

SECOND FLOOR FRAMING PLAN C1 C1 CONTINOUS / DISCONTINOUS END MIDSPAN SECTION

SCHEDULE OF BEAM REINFORCEMENT


SECTION DISCONTINOUS END MIDSPAN CONTINOUS END
MARK WEB BARS STIRRUPS
W D TOP BARS BOT. BARS TOP BARS BOT. BARS TOP BARS BOT. BARS

B1 200 400 3 - 16mmØ 2 - 16mmØ 2 - 16mmØ 4 - 16mmØ 4 - 16mmØ 2 - 16mmØ - A


RB1 200 300 3 - 12mmØ 2 - 12mmØ 2 - 12mmØ 4 - 12mmØ 4 - 16mmØ 2 - 12mmØ - A

STIRRUPS SPACING: A = 6 @ 50 , 6 @ 100 , REST 200mm O.C.


NOTES: - NO SPLICE SHALL BE PERMITTED @ MIDSPAN FOR BOTTOM BARS
OR NEAR THE SUPPORTS FOR TOP BARS
- MINIMUM SPLICE LENGHT = 40 X BAR DIAMETER

PROPOSED TWO STOREY


LODGING HOUSE
A B C D E F G

1
A

2 B
1 3 C

F
2
G
3

ISOMETRIC PLAN

PLUMBING LAYOUT

LEGEND :

GENERAL NOTES:
* ALL PLUMBING INSTALLATIONS SHALL BE DONE IN ACCORDANCE WITH THE LATEST
EDITION OF THE PHILIPPINE PLUMBING CODE AND IN CONFORMITY WITH THE
LOCAL PLUMBING ORDINANCE.

* ALL HORIZONTAL PIPING INSTALLATIONS SHALL BE RUN IN PRACTICAL ALIGNMENT


AND SHALL BE PROVIDED WITH A SLOPE OF NOT LESS THAN 2%.

* ALL PLUMBING PIPES PASSING THRU OR UNDER CONCRETE SHALL BE FULLY


PROTECTED AGAINST BREAKAGE.

* VERIFY ACTUAL LOCATION AND ELEVATION OF STREET DRAINAGE AND WATER


SOURCE FOR CONNECTION BEFORE CONSTRUCTION.

CERTIFICATION * ALL PLUMBING INSTALLLATION SHALL BE DONE UNDER THE DIRECT SUPERVISION
OF A DULY LICENSED PLUMBING ENGINEER OR MASTER PLUMBER.

THIS TO CERTIFY THAT THERE IS NO EXISTING ARTESIAN WELL WITHIN * POLYVINYL CHLORIDE (PVC) PIPES FOR WASTE, DRAIN AND VENT SHALL BE
CATCH BASIN
MOLDEX BRAND, NO REPLACEMENT OF MATERIALS SHALL BE MADE WITHOUT THE
THE RADIUS OF 25.00 METERS AWAY FROM THE PROPOSED SEPTIC TANK. SEPTIC TANK DETAIL
CONSENT OF THE DESIGNER.

MASTER PLUMBER

PROPOSED TWO STOREY


LODGING HOUSE
A B C D E F G

C3 GENERAL NOTES :
MDP
SWITCHES
CKT. NO. DESCRIPTION VOLTS PHASE AMPS CB CONDUCTOR CONDULT
2 Sa Sab Sabc
1 10 L.O. 1 3 220 SINGLE 2.28 15 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 10 mm Ø C
2 9 L.O. 2.05 20 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 15 mm Ø C
3 5 C.O. 1.71 15 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 10 mm Ø C
3 4 5 C.O. 1.71 20 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 15 mm Ø C
5 SPARE 8.00 30 AT 2P 2-5.5mm2 THW+1-2.0mm2 TW 20 mm Ø C
C1 6 SPARE 8.00 30 AT 2P 2-5.5mm2 THW+1-3.5mm2 TW 20 mm Ø C
TOTAL 23.75

MAIN WIRE MAIN BREAKER

Ic = (0.25 x 8.00 +23.75) 0.80 Is = (2.00 x 8.00 +23.75) 0.80


= 20.60 AMPS = 31.80 AMPS
= USE 2-8.00 mm2 THW + 1-5.5 mm2 THW IN 32 mmØ CONDUIT = USE 60 AT 2P, BOLT-ON TYPE MCCB

GROUND FLOOR ELECTRICAL LAYOUT

LEGEND :
A B C D E F G

MDP
60AT2P

1 L.O. C.O

CKT1 CKT2
15AT2P 20AT2P

L.O. C.O.

CKT3 CKT4
15AT2P 20AT2P

C4 SPARE SPARE

CKT5 CKT6
30AT2P 30AT2P

2
C2
3

SECOND FLOOR ELECTRICAL LAYOUT

PROPOSED TWO STOREY


LODGING HOUSE

You might also like