Professional Documents
Culture Documents
Glover - Lodging House
Glover - Lodging House
Glover - Lodging House
PERSPECTIVE
ARCHITECTURAL
STRUCTURAL
SANITARY
THIS SITE
MECHANICAL
SITE DEVELOPMENT PLAN
1 1 FLR. LN.
2 2
3 3
B A B C D E F G 3 2 1
A B C D E F G
LEGEND:
1
3
LONGITUDINAL SECTION AA CROSS SECTION BB
A B C D E F G 3 2 1 G F E D C B A 1 2 3
FRONT ELEVATION RIGHT SIDE ELEVATION REAR ELEVATION LEFT SIDE ELEVATION
B C D E F G
1 1
2 2
3 3
FOUNDATION PLAN
X - AXIS
Rebars @ Length
Rebars @ Width
Y - AXIS
Note: EXTERIOR WALL USE 150mm THK. CHB
INTERIOR WALL USE 100mm THK. CHB
SCHEDULE OF
COLUMN
10MMØ VERT. BARS C1
SPACED @ 600 O.C.
CHB WALL PLAN 300
A B C D E F G
VARY
300
(L2) (L1) (L3)
L2/4 L1/4 L1/4 L3/4
NGL 10MMØ HOR. BARS SPACED
EXCAVATION DEPTH
@ EVERY 3RD LAYER
75
MAIN BAR: 6 - 16Ømm
600 (MIN.)
50
10MMØ TEMPERATURE BAR 75 TIES: (See Note)
SPACED @ 300 O.C. TOP BARS @
L4/4
THICKNESS
200
SHORT SPAN
3-10MMØ LONGITUDINAL BARS
75
(L4)
300
400 100MM THICK WELL-COMPACTED GRAVEL
BED AT 95% MAXIMUM DRY DENSITY BOT. BARS @
LONG SPAN TOP BARS @
1 DETAIL OF WALL FOOTING
L4/4
LONG SPAN
SECTION
MAIN BAR: 8 - 16Ømm
fc' = 4000 psi (27.57 Mpa) BOT. BARS @
TIES: (See Note)
L5/4
SHORT SPAN
fy = 40,000 psi 20mm dia. and below
(L5)
fy = 60,000 psi 25mm dia. and above
Note: Mininum Slice Length = 40 x Bar Diameter
TIES - 6 @ 50mm, 7 @ 75mm, 8 @ 100mm, Rest @ 200mm O.C.
SCHEDULE OF FOOTING fc' = 3,000 psi
FOOTING DIMENSION (mm) REBARS ALONG fy = 40,000 psi (20mmØ and below) PLAN
FOOTING NO. REMARKS
X- AXIS Y - AXIS DEPTH THICKNESS X- AXIS Y - AXIS
LONG SPAN LONG SPAN LONG SPAN
F1 1400 1400 1600 300 16mmØ 16mmØ SQUARE (L2) (L1) (L3)
(L2/4) L1/4 L1/4 (L2/4)
SLAB THICHNESS
2
SECTION
BOT. BARS ALONG SHORT SPAN
BOT. BARS ALONG LONG SPAN
BEAM LENGHT
3 L/4
DISCONTINOUS END
L/2
MIDSPAN
L/4
CONTINOUS END CONTINOUS END
L/4 WIDTH WIDTH SCHEDULE OF SLAB REINFORCEMENT
TOP BARS SPACED ALONG BOTTOM BARS SPACED ALONG
MARK THICKNESS
SHORT SPAN LONG SPAN SHORT SPAN LONG SPAN
EXTRA TOP BARS S1 150mm 12mmØ @ 125mm O.C STRAIGHT EVERY 4 BARS 100mmØ @ 300mm O.C STRAIGHT E.O.B. 12mmØ @ 220mm O.C STRAIGHT 12mmØ @ 300mm O.C STRAIGHT
STRAIGHT TOP BARS SEE STIRRUPS SPACING S2 150mm 12mmØ @ 150mm O.C STRAIGHT EVERY 4 BARS 100mmØ @ 300mm O.C STRAIGHT E.O.B. 12mmØ @ 250mm O.C STRAIGHT 12mmØ @ 300mm O.C STRAIGHT
SEE STIRRUPS SEE STIRRUPS
DEPTH
DEPTH
SPACING SPACING CB1 125mm 12mmØ @ 150mm O.C STRAIGHT EVERY 4 BARS 100mmØ @ 300mm O.C STRAIGHT E.O.B. 12mmØ @ 250mm O.C STRAIGHT 12mmØ @ 300mm O.C STRAIGHT
30MM COVER
30MM COVER
L/5 L/5 L/5
EXTRA BOT. BARS
STRAIGHT BOT. BARS 30MM COVER 30MM COVER
1
A
2 B
1 3 C
F
2
G
3
ISOMETRIC PLAN
PLUMBING LAYOUT
LEGEND :
GENERAL NOTES:
* ALL PLUMBING INSTALLATIONS SHALL BE DONE IN ACCORDANCE WITH THE LATEST
EDITION OF THE PHILIPPINE PLUMBING CODE AND IN CONFORMITY WITH THE
LOCAL PLUMBING ORDINANCE.
CERTIFICATION * ALL PLUMBING INSTALLLATION SHALL BE DONE UNDER THE DIRECT SUPERVISION
OF A DULY LICENSED PLUMBING ENGINEER OR MASTER PLUMBER.
THIS TO CERTIFY THAT THERE IS NO EXISTING ARTESIAN WELL WITHIN * POLYVINYL CHLORIDE (PVC) PIPES FOR WASTE, DRAIN AND VENT SHALL BE
CATCH BASIN
MOLDEX BRAND, NO REPLACEMENT OF MATERIALS SHALL BE MADE WITHOUT THE
THE RADIUS OF 25.00 METERS AWAY FROM THE PROPOSED SEPTIC TANK. SEPTIC TANK DETAIL
CONSENT OF THE DESIGNER.
MASTER PLUMBER
C3 GENERAL NOTES :
MDP
SWITCHES
CKT. NO. DESCRIPTION VOLTS PHASE AMPS CB CONDUCTOR CONDULT
2 Sa Sab Sabc
1 10 L.O. 1 3 220 SINGLE 2.28 15 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 10 mm Ø C
2 9 L.O. 2.05 20 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 15 mm Ø C
3 5 C.O. 1.71 15 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 10 mm Ø C
3 4 5 C.O. 1.71 20 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 15 mm Ø C
5 SPARE 8.00 30 AT 2P 2-5.5mm2 THW+1-2.0mm2 TW 20 mm Ø C
C1 6 SPARE 8.00 30 AT 2P 2-5.5mm2 THW+1-3.5mm2 TW 20 mm Ø C
TOTAL 23.75
LEGEND :
A B C D E F G
MDP
60AT2P
1 L.O. C.O
CKT1 CKT2
15AT2P 20AT2P
L.O. C.O.
CKT3 CKT4
15AT2P 20AT2P
C4 SPARE SPARE
CKT5 CKT6
30AT2P 30AT2P
2
C2
3