Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

LAND USE & ZONING

A B D

1 1 LINE & GRADE


2

3
PERSPECTIVE
4

ARCHITECTURAL

5
6
TECHNICAL LOT DESCRIPTION
LINES BEARINGS DISTANCES(MTS)
1-2 N 04° 49' W 1.63 7
2-3 N 48° 30' E 19.60 STRUCTURAL
3-4 S 50° 48' E 22.01
4-5 S 32° 45' W 6.14
5-6 S 25° 18' W 4.48 8 8
6-7 S 25° 18' W 0.30
7-8 S 25° 18' W 0.70 9
8-9 S 13° 59' W 5.01 9
SANITARY
9 - 10 S 01° 05' W 0.31
10 - 11 N 51° 47' W 11.99
11 - 12 N 27° 14' E 0.78 A B C
12 - 13 N 64° 29' W 3.74
13 - 14 S 17° 56' W 0.24
14 - 15 N 60° 43' W 11.81
15 - 01 S 70° 11' W 2.03 ELECTRICAL
SITE DEVELOPMENT

MECHANICAL

PROPOSED TWO STOREY


RESIDENTIAL BUILDING
A B D A B D

B B

1 1 1 1
2 2
LEGEND:
3 3
4 4

A 5 A 5
6 6

7 7

8 8 8 8

9 9 9 9

A B C A B C

GROUND FLOOR PLAN SECOND FLOOR PLAN

PROPOSED TWO STOREY


RESIDENTIAL BUILDING
A B D 1 3 5 7 8 9

FLR. LN.

TYPE PANEL DOOR TYPE FLUSH DOOR TYPE PVC DOOR TYPE 3-PANEL SLIDING DOOR TYPE 2-PANEL SLIDING DOOR
HINGES 4 - 3.5 x 3.5 LOOSE PIN HINGES 4 - 3.5 x 3.5 LOOSE PIN HINGES 4 - 3.5 x 3.5 LOOSE PIN HINGES NONE HINGES NONE TYPE SWING TYPE TYPE SLIDING WINDOW TYPE SLIDING WINDOW TYPE SLIDING WINDOW
SETS 1 - SET SETS 2 - SETS SETS 2 - SETS SETS 1 - SET SETS 1 - SET GLASS 4 - 6mmTHK GLASS 4 - 6mmTHK GLASS 2 - 6mmTHK GLASS 2 - 6mmTHK
PANELS 4 PANELS 4 PANELS 2 PANELS 5
SETS 1 - SET SETS 7 - SETS SETS 7 - SETS SETS 5 - SETS

PROPOSED TWO STOREY


RESIDENTIAL BUILDING
A B D A B D A B D

1 1 1 1 1 1
2 2 2

3 3 3
4 4 4

5 5 5
6 6 6

7 7 7

8 8 8 8 8 8

9 9 9 9 9 9

A B C A B C
A B C
GROUND FLOOR PLAN SECOND FLOOR FRAMING PLAN ROOF FRAMING PLAN

PROPOSED TWO STOREY


RESIDENTIAL BUILDING
LONG SPAN
(L2) (L1) (L3)
L2/4 L1/4 L1/4 L3/4

TOP BARS @
A B C

L4/4
SHORT SPAN

SHORT SPAN
(L4)
BOT. BARS @
LONG SPAN TOP BARS @

L4/4
LONG SPAN

BOT. BARS @

L5/4
SHORT SPAN

(L5)
PLAN
LONG SPAN LONG SPAN LONG SPAN
(L2) (L1) (L3)
(L2/4) L1/4 L1/4 (L2/4)

TOP BARS ALONG LONG SPAN, (CONT. EDGE)


FASCIA FRAME DETAIL
TOP BARS ALONG SHORT SPAN, (DISCONT. EDGE)

SLAB THICHNESS
SECTION TRUSS DETAIL
BOT. BARS ALONG SHORT SPAN
BOT. BARS ALONG LONG SPAN

SCHEDULE OF SLAB REINFORCEMENT


TOP BARS SPACED ALONG BOTTOM BARS SPACED ALONG
MARK THICKNESS
SHORT SPAN LONG SPAN SHORT SPAN LONG SPAN
S1 150mm 12mmØ @ 125mm O.C STRAIGHT EVERY 4 BARS 100mmØ @ 300mm O.C STRAIGHT E.O.B. 12mmØ @ 220mm O.C STRAIGHT 12mmØ @ 300mm O.C STRAIGHT
S2 150mm 12mmØ @ 150mm O.C STRAIGHT EVERY 4 BARS 100mmØ @ 300mm O.C STRAIGHT E.O.B. 12mmØ @ 250mm O.C STRAIGHT 12mmØ @ 300mm O.C STRAIGHT
CB1 125mm 12mmØ @ 150mm O.C STRAIGHT EVERY 4 BARS 100mmØ @ 300mm O.C STRAIGHT E.O.B. 12mmØ @ 250mm O.C STRAIGHT 12mmØ @ 300mm O.C STRAIGHT

BEAM LENGHT

L/4 L/2 L/4 L/4 WIDTH WIDTH


DISCONTINOUS END MIDSPAN CONTINOUS END CONTINOUS END

EXTRA TOP BARS


STRAIGHT TOP BARS SEE STIRRUPS SPACING
SEE STIRRUPS SEE STIRRUPS
DEPTH

DEPTH
SPACING SPACING
D

30MM COVER

30MM COVER
L/5 L/5 L/5
EXTRA BOT. BARS
STRAIGHT BOT. BARS 30MM COVER 30MM COVER

C1 C1 CONTINOUS / DISCONTINOUS END MIDSPAN SECTION

SCHEDULE OF BEAM REINFORCEMENT


SECTION DISCONTINOUS END MIDSPAN CONTINOUS END
MARK WEB BARS STIRRUPS
W D TOP BARS BOT. BARS TOP BARS BOT. BARS TOP BARS BOT. BARS

B1 200 400 3 - 16mmØ 2 - 16mmØ 2 - 16mmØ 4 - 16mmØ 4 - 16mmØ 2 - 16mmØ - A


RB1 200 300 3 - 12mmØ 2 - 12mmØ 2 - 12mmØ 4 - 12mmØ 4 - 16mmØ 2 - 12mmØ - A

STIRRUPS SPACING: A = 6 @ 50 , 6 @ 100 , REST 200mm O.C.


NOTES: - NO SPLICE SHALL BE PERMITTED @ MIDSPAN FOR BOTTOM BARS
OR NEAR THE SUPPORTS FOR TOP BARS
- MINIMUM SPLICE LENGHT = 40 X BAR DIAMETER
X - AXIS

Rebars @ Length ROOF EAVES DETAIL


Rebars @ Width

Y - AXIS

Note: EXTERIOR WALL USE 150mm THK. CHB


INTERIOR WALL USE 100mm THK. CHB
SCHEDULE OF
COLUMN
10MMØ VERT. BARS C1
SPACED @ 600 O.C.
CHB WALL PLAN 300
2ND FLR. TO ROOF BEAM

FFL
R.C. SLAB ON FILL
NAT. GRADE LINE
VARY

300

NGL 10MMØ HOR. BARS SPACED


EXCAVATION DEPTH

@ EVERY 3RD LAYER


75
MAIN BAR: 6 - 16Ømm
600 (MIN.)

50

10MMØ TEMPERATURE BAR 75 TIES: (See Note)


SPACED @ 300 O.C.
THICKNESS

FOUNADTION TO SECOND FLR.

300
200

3-10MMØ LONGITUDINAL BARS


75

300

400 100MM THICK WELL-COMPACTED GRAVEL


BED AT 95% MAXIMUM DRY DENSITY
DETAIL OF WALL FOOTING
SECTION
MAIN BAR: 8 - 16Ømm
fc' = 4000 psi (27.57 Mpa)
fy = 40,000 psi 20mm dia. and below
TIES: (See Note) CEILING VENT DETAIL
fy = 60,000 psi 25mm dia. and above
Note: Mininum Slice Length = 40 x Bar Diameter
CEILING VENT SECTION
TIES - 6 @ 50mm, 7 @ 75mm, 8 @ 100mm, Rest @ 200mm O.C.
SCHEDULE OF FOOTING fc' = 3,000 psi
FOOTING DIMENSION (mm) REBARS ALONG fy = 40,000 psi (20mmØ and below)
FOOTING NO. REMARKS
X- AXIS Y - AXIS DEPTH THICKNESS X- AXIS Y - AXIS
F1 1400 1400 1600 300 16mmØ 16mmØ SQUARE

PROPOSED TWO STOREY


RESIDENTIAL BUILDING
A B D A B D

1 1 1 1
2 2

3 3
LEGEND :
4 4

5 5
6 6

7 7

8 8 8 8

9 9 9 9

ISOMETRIC LAYOUT
A B C A B C

GROUND FLOOR PLUMBING LAYOUT SECOND FLOOR PLUMBING LAYOUT

GENERAL NOTES:
* ALL PLUMBING INSTALLATIONS SHALL BE DONE IN ACCORDANCE WITH THE LATEST
EDITION OF THE PHILIPPINE PLUMBING CODE AND IN CONFORMITY WITH THE
LOCAL PLUMBING ORDINANCE.

* ALL HORIZONTAL PIPING INSTALLATIONS SHALL BE RUN IN PRACTICAL ALIGNMENT

CERTIFICATION AND SHALL BE PROVIDED WITH A SLOPE OF NOT LESS THAN 2%.

* ALL PLUMBING PIPES PASSING THRU OR UNDER CONCRETE SHALL BE FULLY


PROTECTED AGAINST BREAKAGE.
THIS TO CERTIFY THAT THERE IS NO EXISTING ARTESIAN WELL WITHIN
* VERIFY ACTUAL LOCATION AND ELEVATION OF STREET DRAINAGE AND WATER
THE RADIUS OF 25.00 METERS AWAY FROM THE PROPOSED SEPTIC TANK.
SOURCE FOR CONNECTION BEFORE CONSTRUCTION.

* ALL PLUMBING INSTALLLATION SHALL BE DONE UNDER THE DIRECT SUPERVISION


OF A DULY LICENSED PLUMBING ENGINEER OR MASTER PLUMBER.

CATCH BASIN & GREASE TRAP DETAIL MASTER PLUMBER * POLYVINYL CHLORIDE (PVC) PIPES FOR WASTE, DRAIN AND VENT SHALL BE
MOLDEX BRAND, NO REPLACEMENT OF MATERIALS SHALL BE MADE WITHOUT THE
SEPTIC TANK DETAIL CONSENT OF THE DESIGNER.

PROPOSED TWO STOREY


RESIDENTIAL BUILDING
GENERAL NOTES :
A B D A B D

1 1 1 1
2 2

3 3
C2
4 4

5 5
6 6

7 7

8 8 8 8
C1
C4

9 9 9 9
C3

A B C A B C

GROUND FLOOR ELECTRICAL LAYOUT SECOND FLOOR ELECTRICAL LAYOUT

MDP LEGEND :
CKT. NO. DESCRIPTION
SWITCHES
VOLTS PHASE AMPS CB CONDUCTOR CONDULT MDP
Sa Sab Sabc
1 9 L.O. 1 3 220 SINGLE 2.29 15 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 10 mm Ø C 100AT2P

2 7 C.O. 6.37 20 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 15 mm Ø C


3 10 C.O. 3.40 15 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 10 mm Ø C L.O. C.O

4 7 C.O. 6.37 20 AT 2P 2-3.5mm2 THW+1-2.0mm2 TW 15 mm Ø C CKT1


15AT2P 20AT2P
CKT2

5 SPARE 8.00 30 AT 2P 2-5.5mm2 THW+1-2.0mm2 TW 20 mm Ø C


L.O. C.O.
6 SPARE 8.00 30 AT 2P 2-5.5mm2 THW+1-3.5mm2 TW 20 mm Ø C
CKT3 CKT4
TOTAL 34.43 15AT2P 20AT2P

SPARE SPARE
MAIN WIRE MAIN BREAKER
CKT5 CKT6
30AT2P 30AT2P
Ic = (0.25 x 8.00 +34.43) 0.80 Is = (2.00 x 8.00 +34.43) 0.80
= 8.49 AMPS = 67.89 AMPS
= USE 2-8.00 mm2 THW + 1-5.5 mm2 THW IN 32 mmØ CONDUIT = USE 100 AT 2P, BOLT-ON TYPE MCCB