Project: MUMBAI TRANS HARBOUR LINK PROJECT ( Package-2) Construction of 7.

807 Long Bridge Section (Ch 10+380 to Ch 18+187)


MTHL-P2/FQF/62
Across the Mumbai Bay Including Shivaji Nagar Interchange
Employer: Mumbai Metropolitan Region Development Authority Rev: 0

General Consultant: AECOM Asia-PADECO-Dar AL-Handasah-TY Lin International Consortium Date: 23-03-18

Contractor: DAEWOO-TPL Joint Venture

DAILY LABORATORY PROGRAM

DATE:- 09-01-2023

1 Coarse and Fine Aggregates Testing (TIPL & MS Infra) :- Sieve Analysis, Moisture Content, Silt content Testing at Daewoo-TPL-JV QC Lab Ulwe.

2 Concrete :- Unit Weight Testing at QC Lab.


Grade of No. of
Sl. No. Date of casting Structure Date of testing Testing Location
Concrete Cubes

Concrete Cube Compressive Strength 3-Days

MP-214-215 LHS Outer (Crash Barrier) & MP-216-215 RHS


1 05-01-2023 Crash Barrier M45 3 08-01-2023 Daewoo TPL JV QC Lab
Median (Crash Barrier)
2 05-01-2023 MP-236-237 RHS Outer(Crash Barrier) Crash Barrier M45 3 08-01-2023 Daewoo TPL JV QC Lab

3 05-01-2023 RS-14 MP-193-194 LHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

4 05-01-2023 S-07 MP-186-187 LHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

5 05-01-2023 S-59 MP-164-165 RHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

6 05-01-2023 S-28 MP-168-169 LHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

7 05-01-2023 CAP-3-CAP-4 (Span Top Slab) Span Top Slab M60 3 08-01-2023 Daewoo TPL JV QC Lab

8 05-01-2023 MP-210-209 RHS Median (Crash Barrier) Crash Barrier M45 3 08-01-2023 Daewoo TPL JV QC Lab

9 05-01-2023 MP-242-241 LHS Outer (Crash Barrier) Crash Barrier M45 3 08-01-2023 Daewoo TPL JV QC Lab

10 05-01-2023 MP-206-207 RHS Median (Crash Barrier) Crash Barrier M45 3 08-01-2023 Daewoo TPL JV QC Lab

11 05-01-2023 MJA-2 (Dirt Wall) Dirt Wall M60 3 08-01-2023 Daewoo TPL JV QC Lab
ACP-1 & ACP-2 Stretch 479 to 509 RHS & ACP-7 & ACP-8
12 05-01-2023 Crash Barrier M45 3 08-01-2023 Daewoo TPL JV QC Lab
Stretch 299 to 329 LHS (Crash Barrier)
13 06-01-2023 S-10 MP-166-167 RHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab

14 06-01-2023 S-69 MP-165-166 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab

15 06-01-2023 S-35 MP-168-169 RHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab

16 06-01-2023 S-20 MP-187-188 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab
S-47 MP-169-170 RHS (Segment) 7 S-30 MP-157-158 RHS
17 06-01-2023 Segment & Segment Wall) M60 3 09-01-2023 Daewoo TPL JV QC Lab
(Segment Wall)
18 06-01-2023 S-76 MP-160-161 RHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab
MP-212-211 RHS Median (Crash Barrier) & MP-214-213
19 06-01-2023 Crash Barrier M45 3 09-01-2023 Daewoo TPL JV QC Lab
LHS Outer (Crash Barrier)
20 06-01-2023 S-61 MP-164-165 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab
S-73 MP-165-166 RHS (Segment) & MP-223-224 RHS &
21 06-01-2023 Segment & Deck Slab Opening M60 3 09-01-2023 Daewoo TPL JV QC Lab
MP-218-219 RHS (Deck Slab Opening )
MP-240-239 LHS Outer (Crash Barrier) 7 MP-236-237 LHS
22 06-01-2023 Crash Barrier M45 3 09-01-2023 Daewoo TPL JV QC Lab
Outer (Crash Barrier)
23 06-01-2023 MP-172 RHS (Pier Cap) Pier Cap M55 3 09-01-2023 Daewoo TPL JV QC Lab

Concrete Cube Compressive Strength 7-Days

1 01-01-2023 S-68 MP-165-166 LHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

2 01-01-2023 S-41 MP-163-164 LHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

3 02-01-2023 S-07 MP-166-167 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab

4 02-01-2023 S-21 MP-187-188 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab

5 02-01-2023 RS-15 MP-193-194 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab

6 02-01-2023 S-08 MP-186-187 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab
MP-250-249 LHS Median (Crash Barrier) & MP-209-208
7 02-01-2023 Crash Barrier M45 3 09-01-2023 Daewoo TPL JV QC Lab
RHS Median (Crash Barrier)
ACP-4-ACP-5 RHS (Crash Barrier) & MP-256 -CAP-1 RHS
8 02-01-2023 Crash Barrier M45 3 09-01-2023 Daewoo TPL JV QC Lab
Stretch 509 to 538 (Crash Brrier)
MP-215-216 RHS Median (Crash Barrier) & MP-216-217
9 02-01-2023 Crash Barrier M45 3 09-01-2023 Daewoo TPL JV QC Lab
RHS Median (Crash Barrier)

10 02-01-2023 AMP-6 (Diaphragm) &AMP-7 (Bearing Pedestal) Diaphragm & Bearing Pedestal M60/A10 3 09-01-2023 Daewoo TPL JV QC Lab

MP-200-199 LHS Outer(Crash Barrier) & MP-226-227 LHS


11 02-01-2023 Median (Crash Barrier) & MP-240-241 LHS Outer (Crash Crash Barrier M45 3 09-01-2023 Daewoo TPL JV QC Lab
Barrier)

Concrete Cube Compressive Strength 28-Days

1 11-12-2022 S-70 MP-160-161 RHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

S-40 MP-163-164 RHS (Segment) & S-48 MP-159-160 RHS


2 11-12-2022 Segment & Segment Wall M60 3 08-01-2023 Daewoo TPL JV QC Lab
(Segment Wall)

3 11-12-2022 S-52 MP-164-165 LHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

4 11-12-2022 MP-251-250 LHS Outer (Crash Barrier) Crash Barrier M45 3 08-01-2023 Daewoo TPL JV QC Lab

5 11-12-2022 S-02 MP-166-167 RHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

S-29 MP-157-158 LHS (Segment) & MP-228-229 LHS (Deck


6 12-12-2022 Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab
Slab Opening)

7 12-12-2022 MP-250-251 RHS (Cantilever Slab) Cantilever Slab M60 9 09-01-2023 Daewoo TPL JV QC Lab

8 12-12-2022 CAP-5-CAP-4 (Span Bottom Slab & Deviator) Span Bottom Slab & Deviator M60 3 09-01-2023 Daewoo TPL JV QC Lab

MP-257-256 LHS Outer (Crash Barrier) & MP-229-230 LHS


9 12-12-2022 Crash Barrier M45 3 09-01-2023 Daewoo TPL JV QC Lab
Outer (Crash Barrier)

10 12-12-2022 S-01 EJ -S02 MP-151 LHS & S-16 MP-152 LHS (Wet Joint) Wet Joint M60 3 09-01-2023 Daewoo TPL JV QC Lab

Concrete Cube Compressive Strength 56-Days

1 13-11-2022 S-07 MP-161-162 LHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

2 13-11-2022 S-12 MP-161-162 RHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

3 13-11-2022 S-54 MP-159-160 LHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

4 13-11-2022 S-52 MP-159-160 RHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

5 13-11-2022 S-45 MP-158-159 RHS (Segment) Segment M60 3 08-01-2023 Daewoo TPL JV QC Lab

6 14-11-2022 JMP-2-JMP-3 (Span Top Slab) Span Top Slab M60 6 09-01-2023 Daewoo TPL JV QC Lab

7 14-11-2022 S-66 MP-160-161 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab

8 14-11-2022 Haunch at JM Retaining Wall (CH3 to 55.454) Retaining Wall M45 3 09-01-2023 Daewoo TPL JV QC Lab

9 14-11-2022 S-02 MP-191-192 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab

10 14-11-2022 PCC of Retaining Wall (PCC) (CH 0.000 to 30) PCC M15 3 09-01-2023 Daewoo TPL JV QC Lab
PCC of MNB at AM Retaining Wall (PCC) (CH 21.155 to
11 14-11-2022 PCC M15 3 09-01-2023 Daewoo TPL JV QC Lab
34.595)
12 14-11-2022 S-41 MP-158-159 LHS (Segment) Segment M60 3 09-01-2023 Daewoo TPL JV QC Lab

13 14-11-2022 MP-171 LHS (Pier 2nd Lift) Pier M55 3 09-01-2023 Daewoo TPL JV QC Lab