Professional Documents
Culture Documents
Daily Laboratory Program
Daily Laboratory Program
General Consultant: AECOM Asia-PADECO-Dar AL-Handasah-TY Lin International Consortium Date: 23-03-18
DATE:- 10-01-2023
1 Coarse and Fine Aggregates Testing (TIPL & MS Infra) :- Sieve Analysis, Moisture Content, Silt content Testing at Daewoo-TPL-JV QC Lab Ulwe.
1 07-01-2023 MP-218-219 LHS Median (Crash Barrier) Crash Barrier M45 3 10-01-2023 Daewoo TPL JV QC Lab
2 07-01-2023 S-09 MP-166-167 LHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
3 07-01-2023 S-17 MP-167-168 LHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
4 07-01-2023 S-29 MP-168-169 LHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
5 07-01-2023 S-06 MP-186-187 LHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
6 07-01-2023 AM Retaining Wall (CH 73.861 to 97.862 LHS) AM Retaining Wall M45 3 10-01-2023 Daewoo TPL JV QC Lab
7 07-01-2023 MP-244-245 LHS (Strut) Strut M60 3 10-01-2023 Daewoo TPL JV QC Lab
8 07-01-2023 MP-240-241 LHS Outer (Crash Barrier) Crash Barrier M45 3 10-01-2023 Daewoo TPL JV QC Lab
9 07-01-2023 ACP-6-ACP-7 Stretch 358 to 329 (Crash Barrier) Crash Barrier M45 3 10-01-2023 Daewoo TPL JV QC Lab
ACP-3-ACP-4 RHS Stretch 448 to 419(Crash Barrier) & MP-
10 07-01-2023 205-206 LHS Median (Crash Barrier) & MP-199-198 LHS Crash Barrier M45 3 10-01-2023 Daewoo TPL JV QC Lab
Outer (Crash Barrier)
MP-237-238 LHS Outer (Crash Barrier) & MP-206-205 LHS
11 07-01-2023 Outer (Crash Barrier) & MP-239-238 LHS Outer (Crash Crash Barrier M45 3 10-01-2023 Daewoo TPL JV QC Lab
Barrier)
12 07-01-2023 MP-155-156 RHS(Sika Glue) Sika Glue - 3 10-01-2023 Daewoo TPL JV QC Lab
1 03-01-2023 S-09 MP-166-167 RHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
Haunch at AM Retaining (CH 73.860 to 97.861 RHS &
2 03-01-2023 AM Retaining M45 3 10-01-2023 Daewoo TPL JV QC Lab
Abutment Wall)
3 03-01-2023 MP-248-249 LHS Median (Crash Barrier) Crash Barrier M45 3 10-01-2023 Daewoo TPL JV QC Lab
S-72 MP-165-166 RHS (Segment) & S-30 MP-157-158 LHS
4 03-01-2023 Segment & Segment Wall M60 3 10-01-2023 Daewoo TPL JV QC Lab
(Segment Wall)
MP-210-211 RHS Median (Crash Barrier) & MP-217-216
5 03-01-2023 Crash Barrier M45 3 10-01-2023 Daewoo TPL JV QC Lab
RHS Median (Crash Barrier)
MP-231 RHS (Expansion Joint Cantilever Slab) & AMP-9
6 03-01-2023 Expansion Joint Cantilever Slab & Bearing Pedestal & Seismic Stopper
M60 3 10-01-2023 Daewoo TPL JV QC Lab
(Bearing Pedestal) & AMP-4 (Seismic Stopper)
MP-299-279 ACA-2 to ACP-8 RHS (Crash Barrier) & MP-213-
7 03-01-2023 Crash Barrier M45 3 10-01-2023 Daewoo TPL JV QC Lab
214 LHS Outer (Crash Barrier)
Concrete Cube Compressive Strength 28-Days
1 13-12-2022 S-64 MP-165-166 RHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
2 13-12-2022 S-54 MP-164-165 RHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
3 13-12-2022 S-15 MP-186-187 LHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
7 13-12-2022 MP-156 RHS (Substation Pier 1st Lift) Substation Pier M45 3 10-01-2023 Daewoo TPL JV QC Lab
8 13-12-2022 Ambuja Cement OPC 53 Grade Week No-49 Week No.49 OPC 53 3 10-01-2023 Daewoo TPL JV QC Lab
1 15-11-2022 MP-148 Module-01 L & 01 R (Bearing Pedestal) Bearing Pedestal M60/A10 3 10-01-2023 Daewoo TPL JV QC Lab
2 15-11-2022 S-33 MP-163-164 RHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
3 15-11-2022 S-39 MP-188-189 LHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
4 15-11-2022 S-21 MP-157-158 LHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
5 15-11-2022 S-16 MP-156-157 RHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
6 15-11-2022 S-55 MP-159-160 LHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
7 15-11-2022 S-53 MP-159-160 RHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
8 15-11-2022 Haunch at JM Retaining Wall (CH-30 to 55.454 LHS) JM Retaining Wall M45 3 10-01-2023 Daewoo TPL JV QC Lab
9 15-11-2022 MP-224-225 & MP-226 LHS Outer (Crash Barrier) Crash Barrier M45 3 10-01-2023 Daewoo TPL JV QC Lab
10 15-11-2022 S-65 MP-190-191 LHS (Segment) Segment M60 3 10-01-2023 Daewoo TPL JV QC Lab
11 15-11-2022 S-47 MP-148B RHS & S-32 MP-149 RHS (Wet Joint) Wet Joint M60 3 10-01-2023 Daewoo TPL JV QC Lab