Project: MUMBAI TRANS HARBOUR LINK PROJECT ( Package-2) Construction of 7.

807 Long Bridge Section (Ch 10+380 to Ch 18+187)


MTHL-P2/FQF/62
Across the Mumbai Bay Including Shivaji Nagar Interchange
Employer: Mumbai Metropolitan Region Development Authority Rev: 0

General Consultant: AECOM Asia-PADECO-Dar AL-Handasah-TY Lin International Consortium Date: 23-03-18

Contractor: DAEWOO-TPL Joint Venture

DAILY LABORATORY PROGRAM

DATE:- 06-01-2023

1 Coarse and Fine Aggregates Testing (TIPL & MS Infra) :- Sieve Analysis, Moisture Content, Silt content Testing at Daewoo-TPL-JV QC Lab Ulwe.

2 Concrete :- Unit Weight Testing at QC Lab.

Grade of No. of
Sl. No. Date of casting Structure Date of testing Testing Location
Concrete Cubes

Concrete Cube Compressive Strength 3-Days

1 03-01-2023 S-09 MP-166-167 RHS (Segment) Segment M60 3 06-01-2023 Daewoo TPL JV QC Lab

Haunch at AM Retaining (CH 73.860 to 97.861 RHS &


2 03-01-2023 AM Retaining M45 3 06-01-2023 Daewoo TPL JV QC Lab
Abutment Wall)

3 03-01-2023 MP-248-249 LHS Median (Crash Barrier) Crash Barrier M45 3 06-01-2023 Daewoo TPL JV QC Lab

S-72 MP-165-166 RHS (Segment) & S-30 MP-157-158 LHS


4 03-01-2023 Segment & Segment Wall M60 3 06-01-2023 Daewoo TPL JV QC Lab
(Segment Wall)
MP-210-211 RHS Median (Crash Barrier) & MP-217-216
5 03-01-2023 Crash Barrier M45 3 06-01-2023 Daewoo TPL JV QC Lab
RHS Median (Crash Barrier)
MP-231 RHS (Expansion Joint Cantilever Slab) & AMP-9 Expansion Joint Cantilever Slab & Bearing
6 03-01-2023 M60 3 06-01-2023 Daewoo TPL JV QC Lab
(Bearing Pedestal) & AMP-4 (Seismic Stopper) Pedestal & Seismic Stopper
MP-299-279 ACA-2 to ACP-8 RHS (Crash Barrier) & MP-
7 03-01-2023 Crash Barrier M45 3 06-01-2023 Daewoo TPL JV QC Lab
213-214 LHS Outer (Crash Barrier)
Concrete Cube Compressive Strength 7-Days

1 30-12-2022 S-40 MP-163-164 LHS (Segment) Segment M60 3 06-01-2023 Daewoo TPL JV QC Lab

2 30-12-2022 S-22 MP-187-188 LHS (Segment) Segment M60 3 06-01-2023 Daewoo TPL JV QC Lab
S-08 MP-166-167 RHS (Segment) & S-45 MP-158-159 LHS
3 30-12-2022 Segment & Segment Wall M60 3 06-01-2023 Daewoo TPL JV QC Lab
(Segment Wall)

4 30-12-2022 S-09 MP-186-187 LHS (Segment) Segment M60 3 06-01-2023 Daewoo TPL JV QC Lab

5 30-12-2022 JM Retaining Wall(CH 0.00 to 30.454 RHS) JM Retaining Wall M45 9 06-01-2023 Daewoo TPL JV QC Lab
MP-200-201 LHS Outer (Crash Barrier) & MP-246-247 LHS
6 30-12-2022 Crash Barrier M45 3 06-01-2023 Daewoo TPL JV QC Lab
Median (Crash Barrier)
MP-209-210 RHS Median (Crash Barrier) & MP-226-227
7 30-12-2022 Crash Barrier M45 3 06-01-2023 Daewoo TPL JV QC Lab
RHS Median (Crash Barrier)

8 30-12-2022 JMP-11-JMP-12 (Span Top Slab) Span Top Slab M60 6 06-01-2023 Daewoo TPL JV QC Lab

9 30-12-2022 S-16 MP-167-168 LHS (Segment) Segment M60(GGBS) 3 06-01-2023 Daewoo TPL JV QC Lab

10 30-12-2022 S-71 MP-165-166 RHS (Segment) Segment M60(GGBS) 3 06-01-2023 Daewoo TPL JV QC Lab

11 30-12-2022 MP-163 RHS (Integral Pier Head Segment) Integral Pier Head Segment M60/A10 6 06-01-2023 Daewoo TPL JV QC Lab

Concrete Cube Compressive Strength 28-Days

1 09-12-2022 S-63 MP-165-166 RHS (Segment) Segment M60(GGBS) 3 06-01-2023 Daewoo TPL JV QC Lab

MP-259-258 LHS Median (Crash Barrier) & MP-230-231


2 09-12-2022 Crash Barrier M45 3 06-01-2023 Daewoo TPL JV QC Lab
LHS Outer (Crash Barrier

3 09-12-2022 S-51 MP-164-165 LHS (Segment) Segment M60(GGBS) 3 06-01-2023 Daewoo TPL JV QC Lab

S-34 MP-163-164 LHS (Segment) & MP-238-239 LHS


4 09-12-2022 Segment & Segment Deck Opening M60(GGBS) 3 06-01-2023 Daewoo TPL JV QC Lab
(Deck Opening)
S-53 MP-164-165 RHS (Segment) & CAP-1 (Bearing
5 09-12-2022 Segment & Bearing Pedestal M60 3 06-01-2023 Daewoo TPL JV QC Lab
Pedestal)

6 09-12-2022 S-28 MP-187-188 LHS (Segment) Segment M60 3 06-01-2023 Daewoo TPL JV QC Lab

7 09-12-2022 CAP-3 (Diaphragm) Diaphragm M60/A10 3 06-01-2023 Daewoo TPL JV QC Lab

8 09-12-2022 MP-229-230 LHS Median (Crash Barrier) Crash Barrier M45 3 06-01-2023 Daewoo TPL JV QC Lab

9 09-12-2022 MP-160 LHS (Integral Pier Head Segment) Integral Pier Head Segment M60/A10 6 06-01-2023 Daewoo TPL JV QC Lab

10 09-12-2022 MP-191 RHS (Substation Pier 2nd Lift) Substation Pier M45 3 06-01-2023 Daewoo TPL JV QC Lab

11 09-12-2022 MP-183 LHS (Pier Cap Pedestal & ADD) Pier Cap Pedestal & ADD M55 3 06-01-2023 Daewoo TPL JV QC Lab

Concrete Cube Compressive Strength 56-Days

1 11-11-2022 S-32 MP-193 RHS & S-46 MP-194 RHS (Wet Joint) Wet Joint M60 3 06-01-2023 Daewoo TPL JV QC Lab

2 11-11-2022 S-51 MP-159-160 RHS (Segment) Segment M60 3 06-01-2023 Daewoo TPL JV QC Lab

S-40 MP-158-159 LHS (Segment) & S-33 MP-188-189 RHS


3 11-11-2022 Segment & Segment Wal M60 3 06-01-2023 Daewoo TPL JV QC Lab
(Segment Wall)
S-15 MP-156-157 RHS (Segment) & S-15 MP-156-157 RHS
4 11-11-2022 Segment & Segment Wal M60 3 06-01-2023 Daewoo TPL JV QC Lab
(Segment Wall)

5 11-11-2022 S-66 MP-190-191 LHS (Segment) Segment M60 3 06-01-2023 Daewoo TPL JV QC Lab

6 11-11-2022 S-03 MP-191-192 LHS (Segment) Segment M60 3 06-01-2023 Daewoo TPL JV QC Lab

7 11-11-2022 JMP-4 - JMP-3 (Span Top Blister & Web) Span Top Blister & Web M60 3 06-01-2023 Daewoo TPL JV QC Lab

8 11-11-2022 Raft at JM Retaining Wall (CH 30 to 55.454) Retaining Wall M45 9 06-01-2023 Daewoo TPL JV QC Lab

9 11-11-2022 MP-225-226 LHS Median (Crash Barrier) Crash Barrier M45 3 06-01-2023 Daewoo TPL JV QC Lab

10 11-11-2022 MP-184 RHS (Pier Cap) Pier Cap M55 9 06-01-2023 Daewoo TPL JV QC Lab