MIP17 Confined Space Entry Plan
MIP17 Confined Space Entry Plan
MIP17 Confined Space Entry Plan
FACILITY MIP PKG 17 RAS TANURA AREA PIPELINE PROJECT CSEP SHALL NOT BE EXCEED 7 DAYS
LOCATION: START DATE: END DATE:
DAY1 DAY2 DAY3 DAY4 DAY5 DAY6 DAY7
CSEP # ENTITY EXECUTING THE JOB
PERMIT ISSUER
NUMBER OF EMPLOYEES
SIGNATURE:
SCOPE OF WORK
NOTE: ATTACH DRAWING SHOWING EACH ISOLATION
ISOLATION METHOD □ Locked switch/breaker □ Blinding □ Disconnect
POINT AS WELL AS BLIND LIST.
□ Purging □ Cleaning □ Flushing □ O2 □ CO □ H2S □ LEL
ELIMINATING ATMOSPHERIC GAS
ATMOSPHERIC □ Steaming-out □ Natural Ventilation TESTING TYPES AND □ Other:……………………………..
HAZARDS BY: FREQUENCY
□ Mechanical Ventilation □ N2/CO2 inerting □ Frequency……….hrs………..
The drawing of the Confined Space must show ALL Isolation if required , Entry and Ventilation points
Additional documents required
NAME Position Badge Signature Date before initiating CSE activities.
□ CSE Work Permit
Prepared by:
□ Gas Testing Log Sheet