Professional Documents
Culture Documents
Shiv Ani Internship
Shiv Ani Internship
INTERNSHIP REPORT
At
(Faculty Mentor)
(Industry Mentor)
Shahi Exports Pvt Ltd is genuinely the result of my sincere efforts. It has
not been submitted earlier, either partly or fully to any other University,
Institute or Company and that the work has not been published in any
2|Page
ACKNOLEDGEMENT
This completion of study could not have been possible without the guidance of Mr. Dushyant
Singh and every employee of Shahi Exports who always welcomed us warmly whenever we
had queries, and were always eager to help us with our projects. Everything we have learnt
from here is due to the guidance and immense patience of the staff of Shahi Exports.
We are also grateful to our industry mentors from National Institute of Fashion Technology,
Dr. R. Russel Timothy. Their constant guidance throughout the 8 weeks helped us in grasping
the most out of every department.
We would also like to extend a warm token of thanks towards Ms. Promila Rawat, Head HR,
for giving us this opportunity to learn and explore for the betterment of ourselves, and the
industry.
Lastly, we would like to thank our esteemed institute National Institute of Fashion Technology
for the presenting us with this opportunity that helped me in getting hands-on knowledge.
3|Page
INDEX
TABLE OF CONTENTS PAGE
SECTION A NO.
Introduction 8
Objectives 8
Company Profile 8
About Shahi Exports 9
Environment Policy 9
Company Objectives 9
Good Business Lab 10
P.A.C.E 11
S.T.I.T.C.H 12
Skill Development 12
Human Rights 13
Corporate Social Responsibility 14
Central Planning At Shahi 16
F2 FBD Hierarchy 17
Certifications 18
Buyers Associated 20
1. Fabric Store 21
1.1 Department Hierarchy 22
1.2 Major Suppliers 23
1.3 Process Flow Chart 23
1.4 Process 27
1.4.1 Fabric Issue 27
1.4.2 Inspection 27
1.5 4 Point System 29
1.6 Storage Area 30
1.7 Cut Panel Laundry (CPL) 31
1.8 Reports Maintained 31
2. Trim Store 32
4|Page
2.1 Department Hierarchy 32
2.2 Process Flow Chart 33
2.3 Process 36
2.4 Trim Suppliers 37
2.5 Storage Area 38
2.6 Reports Maintained 39
3. Cutting Room 40
3.1 Department Hierarchy 41
3.2 Process Flow Chart 41
3.3 Process 45
3.3.1 De-rolling & Relaxation 45
3.3.2 Layering 46
3.3.3 Cutting 46
3.3.4 Ticketing 46
3.3.5 Fusing 47
3.3.6 Cutting 47
3.3.7 Final Audit 47
3.4 Machinery & Equipment Used 47
3.5 Reports Maintained 48
4. Kanban Department 49
4.1 Process Flow Chart 50
5. CAD Room 52
6. Sewing Department 54
6.1 Planning 54
6.2 Sewing floor mandates 55
6.3 Sewing floor objectives 56
6.4 Process flow 57
6.5 Documents and concerned persons 61
6.6 Master Organisation chart F2 63
6.7 Sewing floor layout (First Floor) 65
6.8 Sewing floor layout (Second Floor) 66
6.9 Sewing floor layout (Third Floor) 67
6.10 One running style 68
5|Page
7. Dispatch 70
8. Maintenance Department 75
8.1 Department Hierarchy 75
8.2 Work Done by maintenance department 76
8.3 Roles of the maintenance department 76
8.4 Process flow chart 77
8.5 Types of maintenance followed 78
8.6 Reports maintained 79
9. IE Department 80
9.1 Objective 80
9.2 Reports Maintained 80
9.3 Roles and Responsibilities 81
9.4 Process 81
10. Quality Department 82
11. Finishing & Packaging Department 82
11.1 Department Hierarchy 84
11.2 Process 85
11.3 Reports Maintained 87
11.4 Process 89
11.5 SOP 93
11.6 Broken Needle Process Flowchart 94
11.7 Chemical used in spotting room and safety data sheet 96
11.8 Planning in the finishing department 96
11.9 Packaging list 96
11.10 Buyer’s ticketing Requirements 97
11.11 Ticket Format Guidelines 98
12. Human Resource 99
12.1 Personnel 99
12.2 Creche Facility 100
12.3 Medicine Box 100
SECTION B
PROJECT 1
1.1 Abstract 102
6|Page
1.2 Introduction 102
1.3 Objective 102
1.4 Review of Literature 103
1.5 Methodology 103
1.5.1 Selection of Location 104
1.5.2 Sampling Technique 104
1.5.3 Data Collection 104
1.6 Data Collected 105
1.7 Data Analysis 108
1.8 Solution 113
1.9 Result and Discussion 118
PROJECT 2
2.1 Topic 119
2.2 Problem Statement 119
2.3 Objective 119
2.4 Methodology 119
2.5 Production downtime 119
2.6 Observation 1 120
2.7 Observation 2 120
2.8 Findings 122
2.9 Calculation of Productive and Non-Productive time and Efficiency 122
2.10 Conclusion 124
2.11 Suggestion 124
3. Final Suggestion 125
4. Bibliography 126
7|Page
SECTION A
INTRODUCTION
We conducted our apparel internship at Shahi Exports Pvt Ltd Faridabad from 6 June 2022 to
29 July 2022. During the 8 weeks internship, we learnt about the working of the industry right
from the first step to the shipment of the goods. We also made our observations throughout our
learning journey, and based on the observations we worked on projects which could be
potentially beneficial to the company in the long run.
OBJECTIVE
1. To gain practical exposure.
2. To apply classroom learning to real life.
3. To gain knowledge regarding the working flow of the industry.
4. To work on projects and apply our learnings on them.
COMPANY PROFILE
SHAHI EXPORTS
Established by Mrs. Sarla Ahuja in 1974, Shahi exports is now India's largest apparel
manufacturer and exporter which operates over 65 state-of-the-art manufacturing facilities
across 9 Indian states. Shahi has a diverse workforce of 100,000 employees with 70% women.
80% of the raw material requirement is met by vertical plants at Shahi. They have over 100+
designers across all business verticals which makes the workforce diverse. The company
invests in its employees to make them efficient and better at the workplace. Over 30,000+
female employees trained under P.A.C.E., a soft-skills training program. There are over 65
factories all over India and 3 mills. The company produces over 144 million garments per year.
It has established itself as one of the best apparel manufacturers in Asia. The company is a
8|Page
supplier to many of the world’s leading apparel retailers including C&A, Calvin Klein,
factories all over India and 3 mills. The company produces over 144 million garments per year.
It has established itself as one of the best apparel manufacturers in Asia. The company is a
supplier to many of the world’s leading apparel retailers including C&A, Calvin Klein,
Columbia Sportswear, Gap Inc., H&M, Inditex, Kohl’s, Marks & Spencer, PVH, Uniqlo,
Walmart, and many other
Environment Policy
Shahi Export Pvt. Ltd. commits itself to sustain environmental balance through conservation
of water, energy, and prevention of pollution in compliance with legal and other requirements.
We endeavor to consciously home environment concerning skills at our employees through
continual training. We will continually excel through regular and periodic system evaluation.
Company Objectives
• Energy
• Water
• Chemicals
P.A.C.E
P.A.C.E is GAP Inc. proprietary holistic life-skills training program for Female
Garment Workers. The garment industry employs a majority female workforce.
These women often lack access to formal education and training to progress
personally and professionally. P.A.C.E. has been designed to allow them to unlock
10 | P a g e
their true potential and fulfil their dreams. Shahi was the first organization to run
P.A.C.E. in its factories and has extended capsule versions of this program to key
influencers in P.A.C.E. participants’ lives, including their male co-workers,
supervisors and family members. Since launching in 2007, the program has expanded
beyond factories to include women and girls in community settings.
• Inception: 2007
• Modules: Communication, problem solving & decision making, time & stress
management, execution excellence, health, water, sanitation & hygiene, financial
literacy, social entitlement
• 60,000+ women trained
• Train 90,000 workers under P.A.C.E by 2024
• P.A.C.E. beneficiaries are 20% more productive than those who have not participated
in the program
• P.A.C.E. creates a 258% net rate of return for Shahi, eight months after the program
through improved attendance, retention, and efficiency
11 | P a g e
S.T.I.T.C.H
• 6-month training
• 24 modules
• 45 factories
• Trained close to 1,400 supervisors and enrolled more than 50 percent of supervisors in
STITCH since 2017.
• 100% of supervisors will be covered by 2024
• GBL’s research shows that STITCH enhances supervisors’ stock of soft skills,
reduces turnover, and increases the workers’ productivity in their lines, thus raising
incomes and the probability of receiving incentive bonuses.
Skill Development
Since 2013, Shahi has been establishing training centers across the country to skill
and increase the employability of rural populations, with a focus on increasing
female labor force participation. They established partnerships with companies like
12 | P a g e
Tata Steel Foundation and Spark Minda and have set- up centers under government
schemes such as Scheme for Capacity Building in Textile Sector (SAMARTH) and
Deen Dayal Upadhyaya Grameen Kaushalya Yojana (DDUGKY).
Human Rights
13 | P a g e
Image 2: Glimpse of training and awareness program at Shahi exports
The initiatives are based on needs assessment, and consultation with communities and local
governments. The focus areas and key initiatives:
14 | P a g e
1. Education – Supporting school infrastructure development and undergraduate
scholarships
2. Community infrastructure – Benefiting communities with infrastructure such as
public toilets, and bus shelters
3. Drinking water – Provision of RO water plants and storage tanks at public places
4. Welfare of migrant workers – Supporting migrant workers with psychological, social
and informational services
5. Environmental protection – Increasing the green cover with park development and
tree plantation
6. Health – Providing women’s health information and services, including sexual and
reproductive health and psychological wellbeing services
7. Research & Development – Collaboration with academic institutions and non-profit
organizations for research on Industry 4.0., economic policy, and worker wellbeing in
labour-intensive industries
15 | P a g e
CENTRALISED PLANNING AT SHAHI
The planning for production of every order takes place at F1 unit of Shahi Exports in Faridabad
regardless of whichever unit it is going to be produced in. When an order is received, first the
units which are approved by the buyer are checked for the availability. If the units approved by
the buyer are not available for the time duration, then the buyer is informed and further
negotiation is done regarding getting the available units approved or moving the order till the
unit is available.
Once the initial allocation of the units is done, the TAM is calculated and planning is done. In
the first week of production, the bulk wastage is recorded and reported to the merchandiser in
case there is more requirement of material.
16 | P a g e
SHAHI FARIDABAD HIERARCHY
COO OPERATIONS
VP OPERATIONS SENIOR GM
GM OPERATIONS GM QUALITY
17 | P a g e
CERTIFICATIONS
AWARDS
18 | P a g e
Maximum Female employment
award by the Ministry of Rural Best performing Project
Development under DDUGKY Implementing Agency by
Jharkhand State Livelihood
Promotion Society (JSLPS)
19 | P a g e
BUYERS ASSOCIATED
20 | P a g e
1. FABRIC STORE
Fabric cost 60-80% of total garment cost as is the primary raw material of a garment. So
it's important to handle material souring carefully in garment export house to fulfil the
target cost.
In the apparel industry, the fabric store department and accessory stores are centralised. All
fabrics and accessories are delivered first to this unit from the supplier, where they are then
audited and stored until they are distributed to other departments.
Fabric in-charge is in charge of the fabric store, and he is assisted by a team of employees
who load and unload textiles and issue fabric to the cutting department. Fabrics of all kinds
are received and stored at the fabric section. Fabric rolls are stored in allotted racks.
The needed amount of fabric must be stored in the garments before the fabrication of the
garments can begin. Taking the fabric from here has been used for all subsequent
procedures such as spreading, cutting, stitching, and so on. As a result, this department is
critical to ensuring that manufacturing runs smoothly. The stock keeping and record
maintenance is done through ERP application.
21 | P a g e
1.1 Department Hierarchy
• Fabric Store Manager: Mr Radhakrishnan M Nair
• Capacity: 5 lakhs meter
• Workforce: 18 members
• No. of People on system: 4 (2 in store and 2 in quality)
SYSTEM SYSTEM
OPERATOR OPERATOR
(FOR STORE) (FOR STORE)
QUALITY MANAGER
SR. EXECUTIVE
EXECUTIVE
SYSTEM SYSTEM
OPERATOR OPERATOR
22 | P a g e
1.2 Major Suppliers
23 | P a g e
Roll head cutting is done for below
mentioned parameters:
1. Shade- 25 cm full width from each
roll. Shade lotting and continuity
cards are made according to the final
finish requirement.
2. Shrinkage - 50 cm from 10 % rolls Consolidated
3. Bowing-25 cm: Minimum 3 rolls or Piece Goods
Supervisor
5% of rolls Inspection
4. Lab testing-1 m Report
5. CS-Minimum 3 rolls or 5% of rolls
6. LWV-Minimum 3 rolls or 5% of
rolls
7. Torquing-Minimum 3 rolls or 5% of
rolls for twill weave only (denim,
check, and stripes).
8. Spirality-Minimum 3 rolls or 5% of
rolls for knit fabric only.
9. GSM-Minimum 10% rolls is checked
for woven and 100% rolls for Knits.
24 | P a g e
Online CSV and For shrinkage Required
fabric LWV marking is done with activities
inspection mocks are template and details (bowing,
- 4 point prepared. are updated in system torqueing
system for after final ,
CSV
minimum measurement. spirality, Consolidated
cuttings
QA Manager 10%quanti GSM are Piece Goods
are
ty of each done and Inspection
numbered
GRN. For rayon, viscous, details Report
and
modal and tenced: are
stitched in
100% rolls to be updated
sequence
Minimum checked for in system
41352
to check shrinkage.
1000
meters.
Details
Other fabrics, 10%
are
rolls are checked for
updated in
shrinkage (if roll to
system.
roll variance is < 2%)
Pass Fail
25 | P a g e
Swatches of the defects, CS, LWV, shade
Executive lots, continuity card, crinkle lot etc. are send
fabric to the concerned Merchant along with the
online report.
Consoli-
100% dated
Merchant inspection to piece
Concerned be carried out inspection
Review
for the relevant report
Passed Rolls Failed Rolls
Consoli-
Comments if any, update in dated
Executive
piece
Fabric inspection report
inspection
report
26 | P a g e
1.4 Process
Once the raw material or fabric is been sent by the suppliers to export house and once,
they reach fabric Department the involved person keeps the track of all the documents
and material, he/she checks the quantity of fabric in–house and also the material ordered
and cross checks that the materials has been checked against invoice/ Packing list. Once
preparing the GRN (Goods Received Note) they have to do the bill entry and keep the
record and maintain the document of whatever the slips received or delivered.
1.4.2 Inspection
27 | P a g e
Samples approved by the buyer to the merchandiser along with the production file are
sent to the production unit. And fabric that may be either self-sourced or sourced
through different channels as desired by the buyer is requested to proceed production
of the approved sample. Fabric inspection is done as soon as the lots are received, to
ensure fabric is acceptable or not. Basically, fabric is inspected for defects and quality
checking purposes. For checking defects, it is done manually through a 4-point system;
And for checking quality, Samples are cut and sent to the merchandiser to ensure the
quality of the fabric is acceptable or not.
These fabrics are inspected in terms of different parameters which includes: Shade
evaluation, shrinkage, bowing, torquing, spirality, GSM. After reporting all these
parameters final auditing takes place of the received fabric. The fabric which are
received in roll form are inspected on inspection machine else are inspected on
inspection table. The inspection is done according to 4 point system of fabric inspection.
Instructions to be followed-
i. Shade evaluation must be done for 100% fabric and must be updated into the
system.
ii. Report must be prepared for every new lot made with a fabric swatch cutting
of 25cm*25cm.
iii. Width checking must be carried out for 100% fabric roll and must be updated
into the system.
28 | P a g e
iv. Length wise shade variation and bowing should be done properly according
to the standard and if any roll falls below the assigned value 100 % checking
must be carried out for that particular fabric and proper report must be
prepared with fabric swatch for informing the senior associated.
v. Shrinkage check must be done for every 10% fabric rolls of dispatch on a
swatch of 60 cm and proper report must be maintain with the roll number.
vi. C/S must be checked for 10% rolls, if any major/miner variation is reported
then go for 100% checking. Every information must be updated in the system.
vii. Fabric bowing must be check for 10% on a swatch of 50 cm and proper
reporting must be done.
viii. For defect checking 10% quantity must be checked and swatch report must
be prepared for every defect.
Table 2: This table gives the standard RPM on which fabric inspection machine should run in accordance to
different fabrics.
Table 3: This table gives the penalty points based on the defect size under 4 point system.
Image 7: storage racks for GRS/organic fabric Image 8: Storage racks for storing fabric in store
denoted with green colour
30 | P a g e
1.7 Cut panel laundry (CPL)
CPL is the area where washing takes place. Two washing machines were installed at
this place and according to requirement the washing of fabric takes place here in this
area. Wash fabrics are received in this area and washing takes place after which they
are being processed further.
31 | P a g e
2. TRIMS STORE
To fulfil the design objectives we need a special kind of materials. Fabrics are the main raw
material that is used for garment production. We need other different materials also, that
make the garments aesthetic, functional and commercially needed. Usually apart from
fabrics these material used for creating garments are referred to as trims and accessories.
Trims are materials used to ornament or enhance garment functionality and aesthetics.
They’re the visible elements of a garment. Trims are often classified as decorative and
functional trims. Trim store acts as a storage room for accessories. It’s the place where all
the accessories needed are kept. Right from sewing threads, to packaging material like poly
bags and tapes etc. all are kept or stored within the trims store.
32 | P a g e
STORE MANAGER
OPERATOR-1 HEPLER-1
OPERATOR-2 HELPER-2
OPERATOR-3 HELPER-3
HELPER-4
PERSON
33 | P a g e
Specified
quantity of all Lab test
Trims QA
items are sent for request form
lab test
Review of
visual Trim
inspection inspection
Trims QA
result + lab report
report + shade
card
Fail
34 | P a g e
100% quality Trim inspection
Trims QA report
verification
Mix Reject
Result
Segregate Complete
quantity quantity
into rejection ERP
pass/fail
Pass Fail
Requirement note
Store Requisition
received from the
Executive slip
concerned department
Store Return to
Return to
Executive party challan
supplier
and claim note
Material updated in
Store
ERP and dispatch to Challan
Executive
concerned department
Flowchart 5: This flowchart gives the complete process flow for trim store
35 | P a g e
2.3 Process
The acceptance of the raw materials or the accessories is usually done in terms of
documents i.e., no matter it's going to be whether acceptance and revival whenever
they're done, they're done in accordance with the documents that are received from
the merchants from head unit.
The department first receives a PO from the merchants. As soon as the accessory or
trim is received they are placed under just received material racks and the concerned
person verifies the materials against invoice/ Delivery Challan and packing list
which they would have received from the merchant as already stated and bill entry
is made in their ERP system.
The received material is then audited, the concerned person count all the items
received and conduct a physical test, which include material quantity, material type,
supplier. After it is confirmed that the received materials are according to the
documents then they are placed in the allotted racks and the rack number is updated
in the ERP system for easy location tracing.
For issuing- Challan is received from Kanban based on the item requirement trim
card is prepared and the items mentioned in the trim card are then counted according
to the required quantity and are then packed in bags. Finally the trims will be issued
to cutting department.
36 | P a g e
Image 11: Trim card (contains information regarding different trims and accessories used in a
particular style)
37 | P a g e
Vardhman, Madura Coats, Pashupati Spin
Thread
Weave Mills
The Trims arrive at the unit after the approval of Merchant in F1 unit. The invoice
is checked at the gate by guards and the trims are unloaded in Trims storage.
First they are kept in just arrived section. After being checked again by the helpers
using the trim card and invoice. The information is feeded into the system and a
rack is assigned to them.
Image 12: different racks are allotted for just received materials
38 | P a g e
The racks have a specific number which helps in easy tracking of the goods kept in
them.
Image 12: Different rims stored in racks with Image 13: Trims received in store after
unique rack number auditing with a passed sticker on them
39 | P a g e
3. CUTTING ROOM
Cutting room controls the utilization of fabric which is the biggest contributor to the cost
of any garment. Even small wastage or saving of the fabric will have a huge effect on the
margins of the orders.
Cutting being the first operation of garment manufacturing lays the foundation of quality
of the garment to be made. Any imperfection in cutting process can result in non-
conformance of the quality standards of all further processes.
The cutting department is responsible for cutting fabrics for the garment orders and feeding
the sewing department with cuttings. The cutting department’s capacity is planned based
on the daily feeding requirement of the sewing lines. The cutting department is set up with
a cutting department head, cutters, spreaders, cut parts quality checkers and helpers for
sorting, ply numbering and bundling.
40 | P a g e
3.1 Department Hierarchy
VP OPERATIONS
GM OPERATIONS
CUTTING MANAGER
41 | P a g e
CONCERNED PERSON PROCESS FLOW DOCUMENT
Action plan is
Quality Manager/IE documented
Manager/Tech/ as and size set is
Pass
applicable made again.
Fabric roll
relaxation for
QC __ hours Fabric lay
relaxation
Fail
report
Fabric lay
QC Fabric lay relaxation
relaxation for __ report
hours
42 | P a g e
Fail
Spreading and
marker audit
Spreading and report
QC
marker audit
Fail
QC Fusing Parameter
validation:
Machine parameter Fusing
validation: checkpoint report
Machine Temp is __C
Fuse line temp is __ C
Fusing time is __ sec
Fail
Reset machine
QC
43 | P a g e
Fusing bond
Bond Strength Testing: strength report
Before wash __
After wash __
After steam __
Fail
Pass
Reset machine
Fusing
Fusing appearance appearance after
QC after wash review wash
Cutting will be
moved to re work and
Pass appropriate action
will be taken.
Non-conforming
Dispatch to sewing as per material report
QC kanban
44 | P a g e
3.3 PROCESS
Image 16: Different fabrics kept for relaxation after de-rolling in cutting room
Table 5: This tables gives the relaxation time of fabric roll and lay for different fabrics
45 | P a g e
3.3.2 Layering:
The fabric is issued according to the lay chart. After the lay is set, it is relaxed for two
hours. After relaxation, marker is placed and quality checkers audits the marker. If the
marker is ok, the quality checker stamps on the marker.
Table 6: This table gives layer height for different types of fabrics
3.3.3 Cutting:
After the marker audit cutting begins. Cutting master checks the cutting with hard
pattern following the top-mid-bottom.
3.3.4 Ticketing:
The bundles of cuttings are ticketed, and the blocks meant for fusing are handed over
to the fusing table.
46 | P a g e
3.3.5 Fusing:
The blocks are sent for fusing on the fusing table.
The fusing machine is set, and it is heated up in half
an hour. First a thermos strip is passed through the
machine to note down the temperature, then a
sample of the fabric is kept with a thermos strip
inserted in between. The observations are taken and
written on the 3rd party fusing report. The bond
strength of the fusing is checked after steam and
wash. Only after the observations are matched, the
blocks are fused.
Image 16: Fusing Process
3.3.6 Cutting:
After fusing the blocks are relayed fixed marker is put on them and recut. They are
bundled and sent for the final audit along with the other bundles.
47 | P a g e
6 Fusing Machine Hashima 4
Derolling Machine - 1
Clamp - 13
Spreading
Table 7: This table Tables regarding machinery and
gives the information - equipment of cutting room 16
48 | P a g e
4. KANBAN DEPARTMENT
Kanban is a visual card or billboard; Japanese word which meaning Cards or board, a tool
of lean manufacturing for visualization entire production teamwork to control production
focusing on creating a production system more effective and efficient, focusing mainly on
the production and logistics activities. Kanban is a visual system as ‘Signal card’ indicates
what to do, items will put when needed, Kanban cards order necessary task, update with
time and surely reduce wastage.
The Kanban department is located in one corner of the cutting room. There are aisles
marked with the racks marked with the number of lines they belong to. For example, in the
rack that belongs to line 26-35 the cuttings of the same lines will be kept.
Red card is attached to the boxes, cutting are stored in. Yellow card are put on the Kanban
board. The helper takes the card from the board, matches the details from the yellow card
to the red card and if they are matches. He takes out the challan of the trims from the Kanban
department.
49 | P a g e
There are three challan copies that are sent to:
a. Production manager
b. Trims department
c. Kept with Kanban department
The yellow card is sent along with the cutting to the cutting department, and the red card is
sent to the dispatch department.
50 | P a g e
Helper Yellow and Red cards matched N/A
51 | P a g e
5. CAD ROOM
SHAHI EXPORTS has its own CAD department for varied style garments made with help of
the Optitex software package. FUNCTIONS OF CAD ROOM CAD department is
responsible for the following functions:
• Determining cutting average for costing
• Making the most efficient cutting marker
• Development and alteration of patterns
• Development of size set pattern by grading
• Embroidery graphics making
• Digitizing the pattern
• Thread Consumption
52 | P a g e
BASIC WORKFLOW Firstly the merchandiser sends the following documents to the CAD
room:
• Approved style sheet and spec sheet containing all the measurements.
• Graded measurement spec sheet.
• Fabric detail sheet containing information like fabric form (open roll or tubular form), tube
size, GSM, type of fabric, style no, vendor, buyer, etc.
Then the work in the CAD room begins.
Receive patterns
from Head Office
Pattern Correction
Output to
Pattern grading Graphtec plotter
Market planning
according to the cut plan
53 | P a g e
6. SEWING DEPARTMENT
6.1 Planning:
- Internal production planning is done in the factory f2 itself.
- Running plan per month is made by the planner
- Excel plan is being followed
- According to the excel plan itself internal PPM is done
- Internal PPM has members from cutting dept., fabric dept., production
manager, technical manager, floor IE.
54 | P a g e
Image 20: Monthly plan for production dept.
55 | P a g e
• To plan for achieving and Improving the required target with highest standard of
quality
• To ensure garments rejection in minimal in production due to sewing defects.
• To optimum utilization of machine & manpower capacity.
• To ensure that all labor laws are followed and absolute prohibition of child labor.
56 | P a g e
6.4 PROCESS FLOW (Sewing)
Size set
review
Pass
57 | P a g e
Note the number of pieces loaded with details
of line no, size wise, colour
and displav it
58 | P a g e
Start Production as per Line setting
Alteration made by
same operator
Not ok
Inline
Checkpoint
Rejection
OK
Alteration made by Move to
same operator reject box
Final Checkpoint
(100% checking)
59 | P a g e
Review of Pilot Run Pieces,
when 100 -500 pcs are
produced and finished from
the line for every style.
Note down, monitor and display the hourly and daily production as per
passed pieces
60 | P a g e
6.5 Documents and concerned person:
62 | P a g e
6.6 MASTER ORGANISATION CHART A7
Mr. Venkataraman
Cod operations
GM GM Quality
63 | P a g e
Mr. Pankaj Mr. Dushyant Singh
Manager Technical Head HR
Mr. Sandeep
Cutting QA
64 | P a g e
6.7 Sewing floor layout (1st floor)
65 | P a g e
6.8 Sewing floor layout (2nd floor)
67 | P a g e
6.10 One running style:
LINE No. – 25
Image 24 : PP REPORT
68 | P a g e
Image 25: Trim Card
69 | P a g e
7 DISPATCH DEPARTMENT
70 | P a g e
S.no Department Main Sub- Automation Potential Remarks
Activities Activities Automation
Kanban
cards are
hung on
theside of
the 2 tables
which are
dedicated
for normal
counting
and issuing
of challan
Challans 🗸 🗸 Paper
are made handwritten
for the lots challans are
which are maintained
then sent to which
the audit definitely
table for can be
inspection done in a
done on more
basis of systematic
AQL way to
avoid
errors and
easy
tracing of
data.
71 | P a g e
🗸 🗸
Lots are If the Lots
checked on have other
the AQL ways of
basis data
and based circulation
on
it the Lots rather than
are
either challans, for
passed
or rejected example, a
and the BARCODE
challan is maybe
kept
by the which could
checker. be scanned
and the
detail for
the
lot can be
directly
stored as a
data and not
the challans
to be taken
care of
which if
lost
can cause
trouble
fetching
information.
🗸 🗸
The data The data
for
Lot entry should
checking
is definitely
maintained
in writing have a
on
paper. system like
one on the
ground
floor
of sewing
where the
end line
inspector
has a
system
where he
does his
entries for
defects and
alteration
🗸
Counting After the
of Lot
the Pieces is passed
the
pieces are
being
counted
72 | P a g e
on the 2
tables
dedicated
for
the
different
sewing
lines
and the
pieces
are
collected
in sacks.
🗸 🗸
Kanban As soon as If we have
data the
updated in passed the same
the pieces
system. are barcode
collected
in sacks flowing in
after
counting the same
the
Kanban could be
card
for the used here
particular too for
Lot
is sealed updating the
OK
by the information
concerned at different
person and centers
the data is
maintained
in
a system
73 | P a g e
Lots kept The passed 🗸 🗸 Again the
onRacks Lots are sacks are kept
thenkept on on the racks
racksbefore manually
further which is
sending it to ergonomically
the next not suitable .
step.
The Kanban
card
includesthe
name of the
buyer , item
no.,
Description
and Shade
number.
Again 🗸 🗸 The
filesare maintenance
maintained of the data
for the can be
Kanban automated.
allotted to
different
Lots in
Dispatch.
74 | P a g e
8.MAINTENEANCE DEPARTMENT
8.1Department Hierarchy
Sr. Manager
Electrical In Electricians
charge
DG Operators
Mechanical In RO Operators
charge
STP Operators
75 | P a g e
Helpers
• Servicing of machine.
• Modifying machines for the ease of using
• Checking of Boilers for steam.
• Water supply for the whole plant
• Electricity supply
• Building maintenance.
• Oil change.
• Replacement of defective parts
• Servicing of Motor.
• Checking of Motor.
• PROVIDES: The required machines, instruments and appliances to carry out the
manufacturing.
• FACILITATE: The department with necessary work aids and surroundings.
• SERVE: The employs with necessary needs.
76 | P a g e
The maintenance department is accountable not just for the upkeep of the machines however
it's additionally answerable for providing and maintaining the facilities for the production
activities e.g., illumination, air circulation, work place engineering, compressed air etc. The
condition of machines & operating atmosphere within the department is mainly dependent on
the care taken and working in habits of the operators and all other floor staff.
77 | P a g e
Supply from vendor Received
(Invoice)
• Preventive Maintenance
• Preventive Maintenance
• Breakdown Maintenance
78 | P a g e
8.6 Reports Maintained
• M/C Challan
• Miscellaneous Challan
• In and Out
• Warranty Bill File
• Old M/C Challan
• Warranty Document
• Rental Form
• Service Bill
• Debit Note
79 | P a g e
9. IE DEPARTMENT
IE department plays an excellent role in guaranteeing operational potency and work arrange of
the attire industry. It assigns sure systems like floor layouts, personnel, organization, civil time,
wage rates, incentive payment plants therefore on management the amount and also the quality
of products created. The IE department will the work study to require out the surface-to-air
missile of every machine and manual operation. This is done in order to require out the quality
allowed minutes required to hold out every operation and thus the whole operation to form the
garment.
9.1 OBJECTIVE:
• Increase Productivity
• Reduce Wastage
80 | P a g e
9.3 ROLES & RESPONSIBILITIES:
• Machinery arrangement
• Batch setting
• Line balancing
• Time study
• Motion study
• Costing
• Finding SMV
9.4 PROCESS:
• The work of industrial engineering department starts with sample re-engineering at the
proto-stage thus on get to best possible construction and also the use of folders and
attachments within the fit.
• Target setting - Department has got to establish precisely what percentage machines
and men is required in the style to start. For this point scrutiny is finished and the right
technique and rating is done.
• Final operation bulletin and layout- The ultimate operation breakdown and layout is
made with that the quantity of men and machines needed to fulfil the targets. This
operation bulletin and layout has got to be cross checked by I.E head and so it's passed
to production manager.
• Create line set up as per order.
81 | P a g e
• Line setting- Line setting is that the implementation of the layout and operation
bulletin, that is finished in conjunction with line accountable, supervisor, mechanic,
Q.A and technician.
• Bottle neck identification- when line setting consequent job is to understand the
bottleneck of the road due which targets don't seem to be met and balance line
consequently.
A lot of people and machines are involved in producing a garment. There is an obvious chance
of making a few faulty garments in a batch due to faulty machines or human intervention and
supplying defective pieces can cause manufacturer penalty which might cost a lot of money to
the industry.
And since finishing department is the final part of the production department which comes after
all the departments and it plays an equally important role in the final appearance of the garment
to the buyer.
Shift: 8 hrs
83 | P a g e
Image 27: Packaging Table Image 28: Inspection Table
SENIOR GM
GM QUALITY
MANAGER QUALITY
SENIOR QA
84 | P a g e
QA QA
11.2 PROCESS: -
1. INITIAL CHECKING
Initial checking is done prior to pressing of the garment at the finishing room. In the
initial checking, majorly focuses on the finishing of the back parts of the garment.
DHU is the number of defects found or detected per hundred garments. After the initial
checking of the garments, the defects found are recorded in the DHU file and for the same
they are sent for the alternation.
3. PRESSING:
Garment ironing is done as per the instruction in the PPE folder by the ironer. After
ironing, critical parts measurement shall be checked against pattern by the checker. If the
garment found out of measurement same shall be kept at an identified place for further
action. Passed garments shall be forwarded to the next process. Necessary action shall be
taken on non-conforming garments by the finishing supervisor in consultation with the
QC.
4. Final checking:
85 | P a g e
Again, the checking is done after the garment is ironed. It involves overall checking
as per the instructions given.
DHU file will be updated if any defect found during final checking.
5. Measurement:
Critical parts measurement is checked against pattern by the checker against the
approved specification displayed in the work station as well as in the PPE folder by
the checker. If the garment found out of measurement same shall be kept at an
identified place for further action. Passed garments will be forwarded to the next
process.
6. Tagging:
After all the checking and inspection of the garment is done, they are sent for the
tagging the labels and the labels include the size labels, price tags and miscellaneous
labels according to the buyer’s requirement. And once the tagging is done, they are
put to the hangers and sent to the packaging department.
7. Metal Detection:
Every garment shall be passed through metal detection machine to detect the metal
item if any in the garment. Before starting the operation, machine shall be calibrated
and metal detection shall be done. Metal detection details shall be recorded hourly
metal detection report. In case if any metals found during inspection, details shall be
recorded in metal contamination log.
8. Cartoning:
86 | P a g e
Size wise segregated garments shall be put in the carton box as per P.O and details
shall be recorded in ratio/solid packing process check sheet. Packing shall be done as
per the work instruction.
9. Carton Audit:
The packed cartons shall be offered for audit. If the consignment fails in audit, shall
be rescreened and re audited on the same day. The audit passed carton shall be
forwarded to Scanning area.
1. Audit reports
87 | P a g e
2. DHU(Defects per hundred units)
88 | P a g e
4. Measurement report
Download and train the technician feedback and other process requirements of
the style finalized in PPM
Fulfil the prerequisites like marking on pressing table, change of table cloth,
pressing instruction etc., if required
Not ok
Initial
Checking
(100%) Stitching Alt.
Reject
Ok
Cleaning/Spotti
ng
90 | P a g e
DHU (Sewing Alter, Spotting, Rejection has been tabulated)
Not ok
Final
Checking Cleaning/Spotting
(100%)
Ok
Measureme
nt Checking
(100%) Not ok
Reject Repair
Ok
Ok
91 | P a g e
Final Audit Not ok
as per AQL
level 1.5v
Rechecking
Metal detectionNot ok
Folding/Polybag
Daily carton
Audit
OK NOT OK
92 | P a g e
11.5 SOP (STANDARD OPERATING PROCEDURE) FOR METAL
DETECTOR MACHINE
Needle detector machine is available in packing department so that before packing the piece
metal can be detected in them.
Start Method-
Place the piece one by one on the bandage and observe its movement. Collect the piece on the
other side of the machine and record the pass piece. If the machine comes to a complete halt
and there is a sign of metal in the piece, remove the piece and record in the format and send
the piece for the metal detection. If you find the needle, then again pass the piece through the
machine. If the needle is not found, then put the piece in red.
93 | P a g e
Machine stop method
BROKEN NEEDLE
94 | P a g e
11.7 CHEMICAL USED IN THE SPOTTING ROOM AND ITS SAFETY
DATA SHEET
95 | P a g e
11.8 PLANNING IN THE FINISHING DEPARTMENT
This is the picture showing the finishing plan. Lines are allotted to supervisors and
accordingly day wise and pieces wise planning is done as it is shown in the picture.
96 | P a g e
The packing list is very important to export documents, without the packing list commercial
department cannot submit exports document for garments shipment, that’s why the packing
list consider as important documents.
BUYER: KOHL’S
Image 36 : Handtag
97 | P a g e
• Small gum size: 1.5” high *1.5” wide
• Required data:
1. Colour
2. Department number
3. Major class
98 | P a g e
4. Sub class
5. Retail price
6. Size
7. UPC-A Barcode
8. Vendor style number
• Recommended data:
1. KOHL’S
2. Kohls.com
3. Item description
12.1 PERSONNEL
The Personnel department is centralized for all the units in Delhi and NCR. This
department is responsible for recruitment, training and deciding the organizational HR
policies. It also takes care of wages and salaries of all the employees.
Manpower Planning
Recruitment
99 | P a g e
Induction
Training
Discipline
Sourcing
Salary
Administration
Motivation
Welfare Activities
Basic Salary + HRA + Annual Increment (announced every April) + ESI (employee
state insurance) + Conveyance Allowances + LTA + PF etc.
Shahi, looking at the need of its’ large women workforce has started crèche facility
for their small children. Crèche takes care of children’s food, learning and health.
In Shahi Faridabad there are various medical boxes (first aid boxes), which are placed
at different locations in the unit, it is very useful as there are various small accidents
happening in the industry every now and then. These boxes are properly maintained
and if some medicine is utilized it is quickly replaced. A person who is responsible
and whose work station is near the medical box is made the in charge of the box, and
the key to the box always lies with that person, he/she is responsible to inform the
concerned authorities if some medicine is used fully or expired. That person’s name,
phone no and photograph is put on the medical box so that in the case of emergency
he/she could be immediately contacted.
100 | P a g e
List of the medicines in the box
1. Soframycin
2. Burnol
3. Moov
4. Disposable gloves
7. Band-aid
8. Tape roll
9. Bandage
10. Cotton
12. Forceps
13. Scissors
101 | P a g e
SECTION B
PROJECT -1
1.1 ABSTRACT
In today’s world there is constant demand for fast fashion and to fulfill that demand garment
industries are working day and night. While focusing on producing garments in bulk they often
forget to maintain quality as per the production. Our project deals with the collected data on
the finishing floor then analyzing on the stitching floor and further reducing defects. Main
purpose for this project is to reduce rework and solve the problem itself at the sewing floor.
1.2 INTRODUCTION
Every garment industry faces the problem of rework in stitching as well as finishing
department. If a garment is made and checked in line and end line, then there should be no
point of doing alterations again in the finishing department. If we maintain quality at the first
hand during the stitching, maintain cleanliness and perform all the required actions in line then
there should be no scope of rework in finishing department. To go forward with this project
DHU files are taken into consideration and motive is to reduce it as much as possible.
Minimization of rework is a must have in quality and productivity enhancement. This project
works is suggesting how to handle such types of issue and bring down rejection rate to
minimum. Garment rework is very major issue which affect both buyer and supplier so the
basic needs for productivity and quality improvement are to control defects itself in sewing
department. Productivity can be controlled by supervising & strict operating conditions in
industry.
1.3 OBJECTIVES:
DHU stands for Defects per Hundred Unit. on paper, it's the full range of defects found in a
very hundred checked processes/garments. it's additionally called DPHU (Defects Per Hundred
Unit)
To measure the DHU of any process or garment, the following information should be needed:
103 | P a g e
1.5 METHODOLOGY
A sample size of one style is taken down among all the running styles during that time period.
Observation is done for one week to analyse critical defect points which lead to alteration
work, for the spotting major spots on garments are observed for one week and for thread
cutting all the operations were observed in sewing line and finishing. They are further
analysed and proper root cause analysis or fish bone diagram is made to brainstorm more
about the problem of a sweatshirt currently running in line of Shahi Exports Pvt. LTD. ,
A7,Hoseiry Complex, Phase 2,Noida U.P.. Tentative solutions will be provided according to
the man, machine, method & material for three of the objectives mentioned above.
Convenience sampling technique is used, non-probability sampling that involves the sample
being drawn from that part of the population that is close to hand as data is from a line which
had big amount of DHU
Data is collected through observations made in the sewing floor & finishing department.
Observations on major alteration defects, major spotting issues and thread cutting operations
are observed throughout for a week and DHU data is collected. Primary Data is collected where
data is collected while observing the finishing and sewing line. DHU files were taken from
managers to analyse the defects in our chosen style. Inline thread cutting data is collected by
visual observations. Spotting problems are also determined by visual observations inside the
floor and tentative solutions are applied to solve the problems.
104 | P a g e
6 SIGMA DMAIC Methodology is used brainstorm more about the problem
Phase 1 Define the problem statement – To reduce the Alteration, rework in finishing
department and minimising DHU for the style:
DHU data has been collected by constant observation in the finishing line for the sweatshirt.
105 | P a g e
IMAGE 2 – DHU DATA
So according to that shown in image 2 we can easily determine the data for alterations, spotting
and uncut thread coming in that style.
If we take out average percentage for a week’s DHU so the average percentage would come
around 31.1 % which is defintely much more then it should be . Major defects points which
came were:
106 | P a g e
- Uncut thread
Cost of rework definitely increases cost as it involves man power involved in it, so it was the
current need for the style to be improved in sewing line. So visual inspection is done to
determine the defects deeper.
Image 5 – Spotting
107 | P a g e
Image 5 is captured spotting defects in the garment.
Phase 3 – Analyse Phase to go through the data and find root cause of the problem and seek
improvement opportunities.
For analysing the data and solving the our major defect problems root cause analysis or fish
bone diagram method is used . Brainstorming with various officials and observations were
taken into consideration:
Major Causes and their reason : ( Broken Seam & Run off )
108 | P a g e
- New Operator : Some of the operators are not fully trained for the knits as the style
no. 024C is a Knit sweatshirt so proper training is required for resolving the issue
of Broken seam and run off in that garment
- Non required conversations : Operators at some operations are not at all motivated
to work at their maximum efficiency and are involved in un required conversations
among themselves
- Improper thread guide : Sometime threadguide is not set in a right path due to lack
of attention of operator.
- Needle : Some time needle do not get changed on time and tend to bend with time
which eventually result in broken seam and run off
- Compressor issues : Some times compressor gets on and off which leads to
broken seams.
- Wrong thread : Low quality thread can result to broken stitch . Poly-spun thread is
being used in this style
- Guide problems : Rubber guides stick on with the tapes were being used which
might be reason for run off.
109 | P a g e
Image 7 – ROOT CAUSE ANALYSIS ( UNCUT THREAD)
- UBT’s not working well: UBT machines are not working well as maintenance is
not working in correct way.
110 | P a g e
Image 8 – ROOT CAUSE ANALYSIS (SPOTTING)
- Workers Contamination: Spotting is found in almost all garments, too much dirt
and sweat marks can lead to spotting.
- Unsorted Workstation (sewing)- Sorting is not at all done on the workstations which
lead to dirt marks on the garments. (Image 9&10)
111 | P a g e
Image 12 Image 13
- Unsorted workstation (cutting) - Cutting workstation is not cleaned after cutting the
components (image 12&13)
112 | P a g e
Image 14 – Exhaust
- House help and maintenance is not doing the cleaning stuff well. (image 14)
1.8 SOLUTIONS
PROBLEMS SOLUTION
113 | P a g e
WORKERS CONTAMINATION Gloves should be mandatory
UNSORTED WORKSTATION ( CUTTING , DISPATCH , Training to the workers , regular cleaning ,
SEWING) updating into checklist
IMPLEMENTED SOLUTIONS:
- Training and skill development for sewing workers: As most of the workers are not
trained for knits training is given to them by the skilled operators themselves. They
will be guided about the correct thread path; they will be instructed to change needle
twice a day.
114 | P a g e
Image 15 – Training to sewing worker
115 | P a g e
- Gloves were made mandatory for the operators to maintain cleanliness.
- Operators were guided to put tissue paper under the needle while leaving to detect
oil leakage in the machine.
- Checklist was made and feeder was guided to fill it at every operators table twice a
day at different time period on alternate days so that operators try not to cheat.
Image 18 – Checklist
116 | P a g e
Image 19 – Installed checklist Image 20 – Installing checklist
CORRECTIVE ACTIONS:
117 | P a g e
1.9 RESULT AND DISCUSSION
118 | P a g e
PROJECT 2
2.1 Topic: Production downtime calculation in the cutting department.
2.3 Objectives:
• To define SAM for ply to calculate the production time of lay spread.
2.4 Methodology:
The workflow of the cutting section was observed over a period of 6 days.
The actions of the operators and managers, as well as the working
conditions, were noted. Previous reports and records of the cutting
department were studied. It was only then that these observations and
suggestions could be made.
This observation has been performed in the cutting department, our focus
was on the spreading of lay. The factors affecting production downtime
are represented by the Ishikawa diagram given below.
119 | P a g e
2.6 Observation 1: Initially the observation made over 6 different styles where we
found that preparation, roll change and machine maintenance are consuming more
time as compared to the given ideal time which results in production down time.
1. Preparation 10
2. Roll change 2
3. Machine maintenance 15
S.No Style Plies Prep time Machine Layering Roll change time(in mins)
. no. (in mins) Breakdow Time I II III I V VI V
n (in mins) V I
I
1. 715D 125 30 10 215 2 4 3 2 2 3 2
2. 008F 100 20 20 160 2 3 3 2
3. 035E 60 28 35 87 2 3 2 4
4. 252D 100 30 25 240 3 2 4 3 3 2
5. 259E 84 20 - 120 2 3 2 4 3
6. 342D 80 30 38 125 3 2 3 4
2.7 Observation 2: This observation was made on a single style over a period of
threedays. where initially calculated SAM of ply using cycle time. Here we have
taken first five observations of laying of ply using that we calculated the Actual
SAM.
120 | P a g e
STYLE P1 P2 P3 P4 P5 TTL AVG SAM ALLW Actual
No. 15% SAM
57 65 50 52 59 283 56.6 0.94 0.141 1.08
Style Plies Prep time Machine Layering Others Roll change time(in
No. (in mins) Breakdow Time mins)
n (in mins)
I II III I V
V
80 30 15 132 22 3 2 4 2 2
342D 80 20 17 145 23 2 3 3 4 3
80 20 23 140 18 3 4 2 3 4
Total 240 70 55 417 63
Style Plies Prep time Machine Layering Others Roll change time(in
No. (in mins) Breakdow Time mins)
n (in mins)
I II III I V
V
80 25 - 140 9 3 2 4 2 2
80 20 13 150 13 2 3 3 4 3
342D
80 27 25 160 8 3 4 2 3 4
Total 240 72 38 450 30
121 | P a g e
Style Plies Prep time Machine Layering Others Roll change time(in
No. (in mins) Breakdow Time mins)
n (in mins) I II III I V
V
80 30 15 152 13 3 2 4 2 2
80 22 - 147 15 2 3 3 4 3
342D
80 29 23 143 10 3 4 2 3 4
Total 240 81 38 442 38
2.7 Findings
The various factors involved in production downtime are preparation time, roll
change, machine maintenance time and others (i.e. fabric roll collection,
transportation delay). From the observations made above it is clear that there is
timedifference between ideal time and actual time which is results in low
productivity.
122 | P a g e
Machine Breakdown = 38min
Layering Time = 450min
Others = 30min
Productive time = Total working minutes-preparation time-machine breakdown-others
Productive time = 480-72-38-30
Productive time = 340
Non Productive time = 140
Efficiency = 70%
III Day
Total working time = 480min
Preparation time = 81min
Machine Breakdown = 38min
Layering Time = 442min
Others = 30min
Productive time = Total working minutes-preparation time-machine breakdown-others
Productive time = 480-81-30-38
Productive time = 331
Non Productive time = 149
Efficiency = 68.9%
123 | P a g e
2.10 Conclusion
In the table given below we have observed time and calculated time with the difference
where the production downtime occurs. It is clearly visible from the observations that the
2.11 Suggestions:
• Cutting parts should be kept in bins as soon as possible to avoid table blockage.
• End cutter maintenance should be done on time to avoid production delays or can be
changed with theideal one.
• This will ensure the setting of a standard number of plies for a particular type of
fabric and its SAM. The actual Time required will be calculated.
124 | P a g e