Date- 07/05/2021
To,
Dombivli East
I. ENABLING SYSTEM :-
Sr. Work Description Quanti Unit Rate Amount
No. ty
1 Roofing System ( Details In the
INDEX copy)
A Rafter Type shed with TATA 0.6 mm 6350 sqft 135 8,57,250.00
Galvanised Roofing color coated
sheet with round GI pipes for
vertical erection and I Beam for
Rafter System with PVC Drainage
B Rafter Type shed with JINDAL 0.5 6350 sqft 120 7,62,000.00
mm Galvanised Roofing color
coated sheet with round GI pipes
for vertical erection and I Beam for
Rafter System With PVC Drainage
2 Water Proofing
DR Fixit Hydroshield PUD or Equal 5900 sqft 70 4,13,000.00
for terrace water proofing with 10
years of warranty
3 Removing old MS Railing on 190 sqft 180 34,200.00
staircase and building new 4" fly ash
brick masonary including 1:4 plaster
4 MS Railing on newly ercted brick 55000
wall
Painting
1 External
Painting with 2 coats of Asian paints 18720 Sqft 26 4,86,720.00
/ DrFixit with 30 % dilution and Top
coat Asian Paints/ Dr Fixit with
respective shade with 30% dilution.
2 Internal :-
Thoroughly scrapping and cleaning 6000 Sqft 18 1,08,000.00
the existing surface with necessary
scaffolding, preparing the surface
by scrapping, brushing and booming
down existing paint providing and
applying two coats of approved
paint over a priming [base coat],
including labour material, tools,
tackles, scaffolding, etc. complete
as par the specification and directed
by C.E.
SHED WORK
Shed Pipe- GI Pipe 1.6
MM
Purlin GI Pipe 1.6
MM
Roofing Sheet 0.5
MM
PVC Channel 7"
KDMC Permission to cost extra 15000