Cascade Divide - Data Center Opportunity – 207 SW Columbia Street, Bend, Oregon 97702
Data Center – Built in 2016 – Tier III Standards – 2.5 Cascade Divide YTD (9
Year Year
MW to the Power Room, equipped now for 750kw to Months)
White Space 30-Sep-20 2019 2018
Revenue:
Lower total cost (TCO), for same size/quality, than other industry leading cloud/colo options; at a sustainable
location that is becoming a major hub for the cloud infrastructure in the Western US.
• A turn-key, future proofed, data center designed to enable thought leadership requirements that will be standard
in the near future (e.g. 32kwh and 10 Petabytes per rack available)
• Lower total operating cost per SQF space than other locations (e.g. California, Seattle, Portland, Hillsboro) that
limit you to 6-8 kwh per rack.
• Sustainability enabling for western US. All of the coastal cities are on/near a major fault line; Bend Oregon has
little to no catastrophe risk
• Strategic Network location connected to backbone of internet: Central to western region of US and close to
undersea network cables to Asia
• Near large dedicated data center campus sites for Facebook, Google & Microsoft. Can use the Bend site as the
Edge while building out a much larger campus just 25 miles away.
Cascade Divide – Why do our Clients like us…..
KEY BENEFITS FOR CLIENTS:
Cascadia Fault
Energy - Power Costs
1. Lower Cost of Energy – 4+ cents/kw cheaper than most California Markets
2. Energy Efficient Purpose Built Construction – Design PUE 1.12, often operate Lower
3. Unique Climate – High Desert provides Significant Temp Change Daily – Providing “Free Cooling”
Cascade Design
1. Purpose Built – Designed to be a Data Center – 48U Standard Rack
2. High Energy Capacity per Rack (up to 32kw)
3. Zero Down Time since Operational - 2016
A turn-key, future proofed, data center designed to enable
thought leadership requirements that will be standard the near future
(e.g. 32kwh and 10 Petabytes per rack available)
• Currently 12% utilized with local
onsite team operating and ready
to scale.
• Total of 10 MW potentially
available at Serving power
sub-station. Site capacity could
support 900 to 2000 cabinets
with expansions. (20,000+
petabytes capacity possible)
Lower total operating cost per SQF space than other locations
(e.g. California, Seattle, Portland, Hillsboro) that limit you to 6 -8kwh per rack.
• $0.04 to $0.065kwh is
substantially cheaper than
California and many other
locations; and power drives
the cost of a data center….
Lease It Out: Work current deal pipeline, complete deals & RFPs with 1+ companies (e.g. DigitalRealty,
SaaS companies, Nike) that need data center location, understand cost savings value and want to be
near central hub (w/Google, Facebook,Microsoft).
Hold It and use it: Acquire and rollup regional MSPs; fill up data center with the client's they support;
consolidate their colo footprint to higher density Petabyte option. Hold onto it.
Sell It as part of larger turnkey strategy: Package this Bend phase 1 data center with nearby 25
acres 30+MW site to enable turn-key hyper-scale solution at lowest operatingcostavailable.
Manage local development of site and provide ongoing services/support with local resources available if
buyer just wants to hold real estate.
Cascade Divide Data Center Leadership Team